HomeMy WebLinkAboutApplication APPLICANT 4/2/2008
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Transportation Engineer: Gary McKenney Case#: PRE200B-00021
Applicant: Hilton/McDonald
TRANSPORTATION
o Right-of-Way Approach Permit application must be provided where the property has
frontage on an Oregon Department of Transportation (ODOT) facility.
Complete Incomplete See Transportation
Note(s)
~
w
Copy of ROW Approach Permit Application
o Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer in
accordance with SDC 4.2-105 A.4.. Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transportation system. In general, a TIS must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
address, if needed, City, Metro Plan, and state land use and transportation policies and
objectives.
Complete Incomplete See Transportation
Note(s)
r:;;;:a
~
IJJ
Traffic Impact Study
o Site Plan
Complete Incomplete See Transportation
Note(s)
IiiJ I2SJ 1
Access to streets, alleys, and properties to
be served, including the location and
dimensions of existing and proposed curb
cuts and curb cuts proposed to be closed
o Improvement and Public Utilities Plan
Complete Incomplete See Transportation
Note(s)
~
r83
[]
Cj
Revised 10/25/07
, .", ___..;'dd:-#,
Planner: AL
Location and type of existing and
proposed street lighting
Location, width, and construction material
of all existing and proposed sidewalks,
Sidewalk ramps, pedestrian access ways,
and trails
Location, widths (of paving and right-of-
way) and names of all existing and
- proposed streets, alleys, dedications, or
1?fJ
bJ
I8J
(Jl
other right-of-ways within or adjacent to
the proposed development, including
ownership and maintenance status, if
applicable
Location 'of existing and required traffic
control devices
Transportation Notes:
1. Plan notes regarding changes to shared access with gas station to the south are not
adequate to describe the proposal.
Additional comments not related to the completeness of the application:
· Project narrative does not provide adequate description of proposed hotel. Number
of floors, rooms, etc.
Revised 10/25/07