Loading...
HomeMy WebLinkAboutPermit Correspondence 1984-1-20 /" .. '\ \ " \ \ \ , / ~ " i. ..,.,"..~. (. . Engineering '\ 212 Q Street Springfield, Oregon 97477 (503) 746-0389 January 20, 1984 Gary Wolfe, Wolfe Construction 1036 S. 59th Street Springfield, OR 97477 Subject: Site inspection of Lot 4~, Block 4, Subdivision ~ Golden Terrace On July 13, 1983 and again on January 19, 1984 I inspected the earth fill on Lot 4J), Block 4, Golden Terrace Subdivision. The existing groundslopes gently down and away from the street. The fill depth increases toward the rear of the lot to 18"-24" deep. The fill was well compacted with heavy earth moving equipment in July, 1983. Recently, the contractor has built up the foundation base with broken rock and gravel. Again he used heavy equipment to compact both the rock base and the earth subbase. Considering both the extent of compaction and the steel reinforced concr.ete. foundation proposed to be cons tructed on site, the combined base and subbase would adequately support the proposed residential development. . Respectfully submitted, ,I............ A-~ I James A: Branch, P.E. oq~1 L-tl a...L L'l .NClIN..RS PLANN.RB /' BUAVEVDRB