HomeMy WebLinkAboutPermit Mechanical 1988-2-16
",
.. , -.l '......... ... .".., ....,....:..,~.., ,." ~':_.__" . ............'.. .'.0<1..,...."....................:. .... -;._ " '. .". _. ....,..._.
Rcce~pt #
It! Cf'l3
.. RESI~T1AL"
APPLICATION/PERMIT
225 North 5th Street
SpringfieZd, Oregon 97477
BuiZding Division
726-3753
/7 I I /J
r.,~ L k/.:5.. /W.-J '" (J M/! )
tli<d /LfJ./' /7{U~A'-) Phone: 'lC/1- t)S{)C).,
Job Location: C; ;2 .;;L
Aeae880PS Map # / 'lo 3 Q 7
Subdivision:
CUneI':
Address:
City:
n
n
n
n
Nr;",
Addi ticn
Remodel
UobiZe Boma
:.:2/I~;frtU
Date of App1.iaation
Contractors
General.
Plumbing
Electrical /1 I
Mechar.ical -tfl"t'~ ~
t;onstJ"Uction Ltmder ," 0
L;t,.-A~~
6). ( Taz Lot H
o Cf-z.of)
/ ~ U-61L-
O.
c, ~'1 I \ \ \ \
. /1'i>
/}
*
Zip:
1
Ol;o'U~ .~
. . P/ll-~ .
Value
Address
-',
n:d-~I
Signed:
Date:
ec
L - I rn -,f<.,(
Lise. #
Expires
Phone
It is the responsibility of the permit hoLder to 88e that all inapections are made at the proper tim€~ that each ~e88 is readabZe
from th8 stl'eet, and that the pePmit card is located at the fl'Ont of the propert;y.
-Buitding Dividor. approved plan. shall remain on tha Building Sit:; at all times.
PROCEDURE FOR INSPECTION R~QUEST:CALL 726-3769 {recorder} state your City designated J'ob number3 job address~ type of in3pec-;icn
requested ar.d when you wiZ.l be ready for inspection3 Contractors or Owners name and phone number. Requests received before 7:00 c:z
...'ill be made the same day~ requests made after 7:00 am will be made the ncxt :xJrking day.
<$50[22-
l?I?f1!Jf"'flr1 T'1Ju?t:>f!T.ir:n.q,
SITE INSPECTION: To 'be 17rlde after
excavation3 but prior to set up of
forms. '
UNDERSLAB PLUMBING. ELECTRICAL &
. MECHANICA~: To be made before any
work is ~ovcred.
o
o
o
FOOTING & FOUNDATION: To be made
after trenches are eXcavated and
forms are erected~ but prior to
pouring concrete.
o
UNDERGROUND PLUMBING.. SEWE:R. W,4TF...&
DRAINAGE: To be mde prior to fi l-
. Ur.g trenches.
o
UNDERFWOR PLUMBING & MECHANICAL:
To be made prior to installation of
floor insulation or decking.
O POST AND BEAM: To be made p1'ioP to
instaUation of floor insulation or
.deckins. .
O ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be cOL'ered
,until these inspections have beer.
made and approved. .
D FIREPLACE: Prior to pkcir.g facing
materials and before "framing inspec-
tion.
O FRAMING: Must be requested after
approval of rough plwr.bing3 electri-
.cal & mechanical. All roOfing
bracing & chimncys3 etc. must be
:' completed. tlo work is to be con-
.....o:cealed until thiD inspection has
_:~ b6~ made and approved.
....-
Your City Desigr.ated Job Number ID:
O INSULATION/VAPOR BARRIE:R INSPECTION:
To be made after all insuk:.ti:m w.d
.. required vapor barriers are in place
. . but before any lath3 gypswn boa:rd. or
uxzU covering is appUed3 and before.
. <>>?,Y inaulation is concealed.
DRYWALL INSPECTION: Tc be made
after a~l drywall is in place3
but prior to any taping.
O. MASONRY: Stee~ ~ocation3 bomI
beama3 grouting or vertica~s in
accordance with U.B.C. Section
2415.
D WOODSTOVE,.: After installation is
ccmp~et<d,
o
o
o
CURB & APPROACH 4P,r?ON: Afte:- forms
are created but prior to pouring
concrete.
SIDEWALK & DRIl'Efo/AY: For azz. con-
crete paving within street right-
of-waY3 to be made after all exca-
vating complete & for.m work & sub-
. base material in place.
D FENCE: Wher. complete -- Provide.
gates or movable sections througr.
~P'U'PM_ k
~0.,
I DEUOLITIOH OR ;'.fOVED BUILDINGS
~ Sanitm>y se'..Jer capped at p:.opcrt'~. lir:.e
~ Septic tank fT~cd and fiUe~ with ara~el
---, Pina l - rlhen above it e:ns are camp leted
---J ar.d when demolitior:. is complete or stru~-
ture moved and premises cleaned up.
I Mobile Hcmes
~ Blocking and Set-~p
~ Plwnbing connections -- saJer and water
---, E~cctrica~ Connection - Blocking3 set-up
---l and plumbing conr.ections nr~st ce approved
beforc requesting etec~rica~ inspect.io:'l.
~ Accesso1"d Building
I. Final - After porcr.es3 skirting3 decks3
~ etc. are complet~d.
o
;;2-/'/1
P/tl1
FIliAL PLUMBIIIG
All project conditions3 such as the installation of street trees3 c~~lction of the
required landsccpir.g3 etc. 3 must be satisfied before tr.e BUILDING FINAL can be requested.
o
D
o
D
FINAL MECHANICAL
o
FINAL BUILDING: The Final Building Inspection must be requeDted after the Final Plumbing
Electrica~3 and Mechar.ical Inspectionn have been made and approved.
FINAL ELECTRICAL
,
"ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE3 ADJUST/tENT TO BE !.t1DE I:T NO COST TO CITY Page 1 of 2 I
I JOB NO. 8g'D (~SOLAR ACCESS
I zona:. Occupancl/ erA
Lot Sq. Ft{;.
:c: "I tot C::Jl)el'ag~
!I of Stories
TotaL Height
Topography
I
lITEM
I Main
,I Garace
I Caroort
I Acces80ru
I
I
SQ.FTG
TOTAl, VAWE
S.D.C.
(VC/.UC)
1.5 x
Building Permit
State Suroharge
Total Cha......ges
lITEM
I Fi..xtures
I ResidentiaL (1 bath)
I SanitaPy Sewer
1 Water
PZwnbing Perr.:i t
State Surcr.arge
Total Charoaes
lITEM
j Res. Sa. fto.
I N61.J/Extend Circuits
l Tempo1"ary Service
, NO'j
I
I
I
Eleatrical Permit
State Surcharae
Total ChaI'c;8S
I NO.
I
I
Vent Fcm I
IlIbodsto~f) (} I
I 1 :-u. -~I
ITEM
Furnace ETU' S
Exhaust Hood
Permit Issuance
Me::hanica l Permi t
State surcharce
Tn-tn l CharnP.!J
-- ENCROACHMENT --
I SeC'..tM. tu Deoosi t
I Storaqe
I Maint~e
I Permit
I Tota 1. Cha1'QOS
I Curbout
I SidsJ.>a Lk
I Pe7U!e
I Electrical. Label
Mobile Home
I TOTAl, AMOI!NT DUE:-
WT TYPE
x
NO.,
FEE
FEE
FEE
Interior
Corner
PanhandLe
CUt-de-sac
Value
CHARGE
CHARGE
I
I
I
I
I
CHARGE
Ie::;. o I!:>
/5.~
/5. fID
t'::.ge ~
REQ.-
L-cod~
Type/Cor~t: ~
II Enerqy Sou.rees
Heat
Access. l I
II
: I
II
Bed:l'ooms:
I Lot Faces -
I
I P.l,.
North
TUDe
Set 'xzcks
House CaI'aqe
Water RRatp.'1'
Range
Fireplace
Wood3tove
east
South
West
Fees
Building Value & Permit
This permit in gro.nted on the express condition that the sdid construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the constructicn
and UDe of buildings, and may be sUDpended or revoked at c:r:y time upon vio-
lation of any provisions of said Ordir~es.
I
I-
I
I
I
, *
IPlan Check Fee:
I Date Paid:
IReoeipt #:
ISifl'led:
Plumbing Permit
No person shall construct, install, alter or change any new or existing
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except tr.at a per-son may do
pl~hing work to property which is owned, leased or operated by the appli-
cant.
I-
I
I
I
I
Electrical Permit
Where State Law requires tr.at the electrical. work be done by an Electrical
Contractor, the electrical portion of this permit shall roOt be valid until
the label. has been signed by the Electrical Contractor.
I-
Mechanical Permit
I - \,('\
I
I-
I
I
I
I
I
I-
PLan Exam'Lner
vaT;e
I HA VE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all ir.fOr>mation hereon is tr>ue and correct, and I
f'.4rther certify that any ar.d aZl work perfomted shaZl be do;'le in accor-
daru:e with the Ordinances of the city of Springfield, and th:: La..;s of tho
State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be nrrde of any structure without permission of the Building Di-
vision. I further certify that o;'lly contraators ar~ empLoyees who are in
compliance with ORS 701.055 will be used on this projeat
,dLU?rdM~
Sig,{,d
rJ- I~ - It
Date
-