HomeMy WebLinkAboutPermit Electrical 1999-6-7
A ..,
fI-. .
SP.FIELD . ....~ .. .
The following project as submittad has tha followin
zoning, and doas not raquire spaClflc land use
approval, LD (2..
225 FIFTH STREET ZOning
SPRINGFIELD, OREGON 97.477 Data I. ' '1- q 'i \
INSPECTION REQUEST: 726-3769.. ~
OFFICE: 726-3759 "'u\llOnzed SIgnature
r.u.\-uUCAL PERHITrf'ALICATION
Ci ty .lob Number L-\V\()llol
1.
3. COMPLETE FEE SCHEDULE BELO\I
Items
A. New Residential-Single or
Multi-Family per dwelling unit.
Service Included:
^. 1l0,>> . DESFRI~TION d -
J.:J.,ll../.!.J +-0 L- (11.
~rYlfi( h.
Permits are non-transferable and expire
if work is not started within 180 days
of issuance or if work is suspended for
180 days.
,
"
,
2. CONTRACTOR INSTALLATION ONLY .B.
Electrical Con tractorD(nFYvlFl e2tJyiL-
Address ~~,?Lo 11). fYlat-t-i/J .
--
Ci ty CrffiJJC11 Phone 1A5-7J-ILlO
Supervisor License Number ~ oJLi- S
Expiration Date IO/till)
Constr Contr. Number LoLa~
1000 sq,ft. or less
Each additional 500
sq. ft or portion
thereof
Each Manuf'd Home, or
Modular 'Dwelling
Service or Feeder
Services or Feeders
Installation, Alterations
or Relocation:
$ 85.00
$ 15.00
$ 40.00 .
200 amps or less $ 50.00
201 amps to 400 amps $ 60.00
401 amps to 600 amps $100,00
601 amps to 1000 amps $130.00
Over 1000 amps/volts $300.00
Reconnect 'Only $ 40.00
C. Temporary Services or Feeders
Installation, Alteration or Relocation
Expiration Date
7 J rfiA
Elec tridan
Addre
fu, Wf'l11D D.
;il:P-C;fQ
Phone -,41 0 .455
Cit
The installation is being made on
property I own which is not intended
for sale, lease or rent.
Ovners Signature:
------------------t=ttl----------------
DATE:_ lO'I'~"1 .:ft~-\
RECEIPT 1I: 1_-' l D }
RECEIVED BY: {<-'7\ 'K'\ -
~.... ()
200 amps' 'or less
201 amps to 400 amps
Over 401 to 600 amps
Over 600 amps or 1000
Branch Circuits
$ 40.00
$ 55.00
$ 80.00
volts see liB" above
.'
Nev, Alteration or Extension Per Panel
Miscellaneous (Service/feeder
-Each installation
Pump or irrigation
Sign/Outline Lighting
Limited Energy/Res
Limited Energy/Comm
One Circuit
Each Additional
Circuit or with Service
or Feeder Permit
E.
5.
SUBTOTAL OF ABOVE
5% State Surcharge
3% Administratiye Fee
TOTAL
--L-
,qj
$ 35.00
$ 2.00
not included)
$ 40,00
$ 40,00
$ 20.00
$ 36.00
, IJ..tfPJ
~)J}