Loading...
HomeMy WebLinkAboutPermit Curb Cut 1998-9-10 , '.' ,". COMMERCIAL/INDUSTRIAL PERMIT APPLICATION ,~ - , JOB NUMBER ?~&l62Y , 225 Fif,th Street, Springfield, Oregon 97477 INSPECTION LINE: 726,3769 OFFICE: 726,3759 LOCATION OF.PROPOSED WORK: -'7/>.q,,- /.~~~ ASSESSORS MAP' /7 ,bl1~ ::?-:>-~ <77- , TAX LOT:~2//0 -, , OWNER' . J1 /L: ~ 6~.#// )1-7-- v , , , / ADDRESS: <2gS:> !?L~A'??/C <4 . '1'.- ,?A~ ~~/,~n~.u-r 'ADDITION DEMOLISH ?:?< , PHONE: .?2t5'~~r CITY:' STAT'" ~~ ZIP ':7?'7~7' DESCRIPTION OF WORK' NEW REMODEL OTHER VALUE: -NAME ADDRESS. . PHONE ARCHITECT' CONTRACTOR'S NAME ADDRESS GENERAL: /":-;'-31/ ~.~ -- -" - ~ -" --,-' .'/ CONST, CO NT RACTO R . ''''"'If"' '-.; PLUMBING: MECHANICA' ' ELECTRICA' ' I PLUMBING I I MECHANICAL I I NO, FEE CHARGE I I NO ."" ""ARG~ I I I Furnace/burner & vent Single Fixture. <100.000 BTUs I Relocated Bldg, I I Furnace/burner & vent I (new fix, addtl) > 100.000 BTUs I Water Service 'I I Floor furnace and vent I It. I Sanitary Sewer 1 I Suspended wall or floor I It. mounted unit heater I Storm Sewer I I Appliance Vent I It. separate 1 - I Stationary,evap. I Backflow Device cooler I I Vent Fan/Single 1 duct I, I I Vent System apart I I Irom AC or htg, I I I I Mechanical exhaust 1 I hood and duct I I I I I 1 1 1 Permit Issuance $10,00 1 I TOTAL PERMIT I TOTAL PERMIT 1 - OFFICE USE - HANDICAP ACCESS: QUAD AREA' LAND USF' FLOOD PLAIN' \, . OF BLDGS' . .OF UNITo, lONING' 'OCCY GROUP' CONSTR, TYP.' L1G HTING POWER BUDGET: . OF STORIES: HEAT SOURCE: WATER,HEATER' SQ, FT, ' $/SO, FT. VALUE SQ, FTG MAl N X SQ, FTG ACCESS X SQ. FTG OTHER' X TOTAL VALUE OF.PROJECT PLAN CHECK FEr RCPP DAT" BY I BUILDING PERMIT PLUMBING I DEMOLITION '15% State 5% State I Surcha~Qe Surcharae .1 MECHANICAL FENCE, VALUE $ 15% State SIDEWALK SUBTOTAL . Surcharae FT, PERMITS 1 PAVING I CURBCUT 3'6 ;,e> SYSTEMS '. / '"/7' FT, . DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICAl ?b./~ ~ REQUIRED'INSPECTIONS . It Is the responsibility of the permit holder to see that all inspections are made at the proper time, To request an inspection, call 726,3769 (recorder), state your City designated job number, Job address, type of Inspection requested and when you will be ready for'lnspectlon.:Requests received before 7:00 a.m~ will be made the same wQrklng day, requests made after 7:00 a.m. will be made the following' work day. . . I' . . . SITE INSPECTION: To be' made after excavation, but prior to setup of forms. . , . UNDERSLAB PLUMBII':IG" ELECTRICAL & ' MECHANICAL: To be made befo'ra any work Is covered. ROUGH PLUMBING, 'ELECTRICAL & MECHANICAL: No work Is to be covered until. these Inspections have been made and approved, PAVING: After gravel is In place but prior to placing asphalt or concrete. FCIOTINGS & FOUNDATIONS: To be made after ,trenches are excavated and' forms are erected, all steel In place, but prior to' placing concrete.> " SPECIAL INSPECTIONS: In accordance Section 306 of the State. Specialty Code a speciaf Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of,the special testing reports shall be furnished to' the Building Division, ( ( ATTIC DRAFT STOPS & CURTAIN WALLS :FIREPLACE: Prior to' placing facing materials an-d before framing Inspection, CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, ace'esserias and other ancillary equipment items are In place but before any concrete Is placed. FRAMING: To be made after- the roof, all framing, fire blocking and bracing are In .' place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and ,mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S,I, (306 a,1) STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERFLOOR: Plumbing, electrical; mechanical. To be' made prior to installation of floor insulation, de-eking or floor sheathing, INSULATION & VAPOR BARRIER: To b'-made after all Insulation and requIred vapor barriers are In place but before any lath or. gypsum board Interior wall covering Is . applied, FIRE & SEPARATION WALL: Located and 'constructed' according to plans: HIGH' STRENGTH' BOLTING: During all.bolt installation and tightening operations, (306 a,6) UNDERGROUND: Plumbing, electrical, 'gas, sanitary sewer, 'storm sewer, water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U.B.G. , Standards 43,a, ,SPECIAL GRADING, . EXCAVATION AND 'FILLING: During earthwork, (306 a,11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing, . LATH ANDIOR GYPSUM ,BOARD: To be made after all lathing and gypsum board, . interior and exterior, Is In' place but before any piasterlng Is applied or before gypsum board Joints and . fasteners are taped and finished, ' GLU.l:AM BEAMS: Inspection Certificate by an approved . agency. furnished to the City's . Building Division before beams are placed.. (2501 U.B.G, STDS, 25'10,11), STRUCTURAL MASONRY: (306 a.7) . I SIDEWALK & DRIVEWAY: . Required for all 'concrete paving' within, street right of way, to'be_made after all excavating complete and form work and sub.base material In '*In addition to the Inspec- place, tlons speclflea, the Building V CURB AND APPROACH Offlclal'may make or require f .ottier Inspections.of any ROOF SHEATHING AND. ' APRONS: After forms.are construction work to ensu're NAILING: Prior to Installing erected but prior to placing compliance with the Building, any roof covering. '. concrete. . ,. City or Development Code. -------_........._----------------------------------.;....--------- FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of deckil:'lg or floor, sh~athlng. MASONRY: Steel location, bond beams grouting or . verticals In accordance with UBC 2415, FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2days In advance of the date' you. wish Inspection, All project conditions such aa landscaping, parking lot 'striplng, etc, must be completed before requesting this Inspect/on. FINAL ELECTRICAL FINAL FIRE DEPARTMENT . FINAL BUILDING: Requested alter the final plumbing, electrical, mechanical and Fire Department Inspections are 'made and ' approved. No occupancy of the premises can be made unttr a . Certificate of Occupancy has been Issued by the Building Division and poste~ on the premises. . '. .' , FINAL MECHANICAL ADDITIONAL COMMENTS' . , 'PLANS REVIEWED BY OAT" By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information 'hereln,ls true and correct, and I further certify that any arid all work performed shall be done: In accordance with the Ordinances of the CltY,ofSprlngfleld, and the Laws of the State.of Oregon pertaining to the work described herein; and that NO OCCUPANCY Will be made of any structure without permission of the Building Safety Division, I further certify that only contractors and employees who are In compliance with ORS 701,055 will be used on this project, . '" I further agree to ensure that all required Inspections are'requested at t'he proper time, that' project address is readable from the street, that the permit card'ls located at the front of the property, and the approved set of plans will rem'al;' on the site at all ti~es ~Urln~CtlO?' r ~ .' ~ . "'" Slgnatur.' r I?,A ~ - ~~ Date 9 - I D - 't9:. ' .I - --, VALIDATION:' . AMOUNT RECEIVED: ;;:::r.c ./0:::> RECEIPT" .~/-::O;~ - . DATE PAID: '9 -;.;;., -"78 RECEIVED BY: ~~__ '. . ' Q:7V -~