Loading...
HomeMy WebLinkAboutPermit Building 2000-1-21 ., , . I Job# 99-01509-01 I ~ Page 1 of4 TRANS#:01-0000323 DATE:JAN 21 2000 AMT RECD:2 $ 11284.09 CHANGE: CASHIER: 059 CITY OF SPRINGFIELD, OREGON INDUSTRIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 99-01509-01 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 2089 Laura St Spr Assessors Map#: 17032710 Lot: Block: Addition: Tax Lot#: 02118 Subdivision: ~ Owner: Virgil Lamb 2050 Bedford Way Phone Number: 541-746-1110 City/StatelZip: Eugene, OR 97401 New Value: $269,308 Address: Scope Of Work: Warehouse WAREHOUSE & OFFICES Contractor Type General Contr Contractor Brad lies X,X,X Registration # Expiration Date Phone 541-484-9881 Electrical Contr Builders Electric Inc 4296 195 Madison St, Eugene, OR 97402-5030 Mechanical Contr Comfort Flow Heating Co 460 1951 Don St Ste D, Springfield, OR 97477-1993 12/10/1999 541-485-0922 6/27/1999 541-726-0100 Plumbing Contr Custom Plumbing 3248 Kentwood Drive, Eugene, OR 97401 102455 10/4/2000 541-485-1146 Quad Area: # Of Units: Constr, Type: Water Heater: Office Use Land Use: Zoning Code: LMI (II) Conc,lron,Stl,Msnr Bedrooms: Range: # Of Buildings: 1 Occupancy Group: General Business Heat Source: Sq. Footage: 5412 To request an inspection call the 24 hour recording at 726-3769, All inspections requested before 7:00 a,m, will be made the same working day, inspections requested after 7:00 a,m, will be made the following working day, Required Inspections Transfered Records I Erosion/Gradlng Inspection Footing Slab Masonry Framing I Building -After trenches are excavated, - To be made after all inslab building service equipment, conduit piping, and other equipment ite -Steel location, bond beams grouting or verticals in accordance with UBC 2415, - Prior to cover. ~ Drywall Firewall Bolts installed in concrete Ceiling Grid High Strength Bolting SUB - InsulationNapor Barrier SUB - Final Final Fire Final Site Plan Final Paving Final Building Temporary Power Underground Electrical Rough Electrical Electrical Service Final Electrical Underfloor Plumbing Rough Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Backflow Device Drywell Final Plumbing Rough Gas Rough Mechanical Gas Service SUB. Mechanical Final Gas Final Mechanical Rough Grading Final Paving . . Page 2 of4 Job# 99-01509-01 I Required Inspections Building - Prior to taping, - Located and constructed according to plans, - To be done by a State Certified Special Inspector, Provide inspection test reports to City Buildin - To be done during construction by a State Certified Special Inspector. Provide inspection result - To be called for at the same time as the SUB framing inspection, -When all Fire Department requirements have been met. -After all requirements have been met for Minimum Development Standards or from the Develop -After paving is complete, - When all required inspections have been approved and the building is complete, I E:lectrical I -Approval required prior to SUB energizing pole, - Prior to cover, - Prior to cover. - Must be approved to obtain permanent power. -When all electrical work is complete, I Plumbing - Prior to insulation or decking, - Prior to cover, - Prior to filling trench, - Prior to filling trench, - Prior to filling trench, -After device is installed but before backfilling trench, -Engineered Drywell is required, -When all plumbing work is complete, I Mechanical I -After line is installed and capped if not attached to an appliance, - Prior to cover. -After line is installed and line has been connected to a minimum of one appliance, Pressure tes -Following City Rough Mechanical inspection approval and prior to cover. -When all gas work is complete, -When all mechanical work is complete, I Permits wlo Srchg I -After gravel is in place but prior to placing concete, -After paving is complete, . . Page 3 014 I Job# 99-01509-01 I Sidewalk Type: Additional ROW? Street Improvement: Curb Cut?O San Sewer Depth (Ft): Storm Sewer Available? 0 Special Req.: Security Required: Bond Begin DateTime: 00/00/000000:00 A Special Instructions: Other Utilities: Improvement Agr.?O o Size Of Line (in): Downspouts/Drains: Enchroachment Permit: San Sewer Tee (in): Bond End DateTlme: 00/00/0000 00:00 A Types Of Warning Devices Reqd. Project Supervisor: Zoning: LMI FloodPlain? 0 Wetlands? 0 Journal numbers 1: 1333-07-0171 2: Comments: Overlay District: # of Street Trees: Land Use: Pave Driveway? 0 3: Planner: Jim Donovan Urban Growth Boundary?D Glenwood Area? 0 Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Additional Requirements: Required Attachments: Source Locn: Material: Flood Plain FEMA: Construction Types:(II} Conc,lron,Stl,Msnry Occupancy Groups:General Business # Of Buildings: 1 # Of Bedrooms: Handicap Access? ~ iArea (Sq. Feet) I Main: 5412 Accessory: Storage # Of Stories: 1 Current Units: Census Code: Does not apply Height (feet): 16 Proposed Units: Total:5412 Fee Paid On Receipt# I Transfered Records 11/01/1999 36056 01/21/2000 323 Value/Quantity Plan Check Fee Land Drainage Alteration Permit Total Transfered Records 533 100 Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building Building 01/21/2000 323 01/21/2000 323 01/21/2000 323 210,060 Permanent: 200 Amps or Less Branch Circuits With Feeder or Service State Surcharge For Electrical Permit Electric Administrative Fee Total Electrical Electrical 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 1 27 Fee Amount $533,00 $100,00 $633,00 $682,75 $47,79 $2Q.48 $751.02 $50,00 $54,00 $7,28 $3,12 $114.40 .. .- . . Page 4 of4 Fee Job# 99-01509-01 Paid On Recelpt# Plumbing 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 78 60 350 2 Value/Quantity Minimum Plumbing Permit Fee Number of Fixtures State Surcharge For Plumbing Permit Water Service Footage Sanitary Sewer Footage Storm Sewer Footage Backflow Prevention Device Plumbing Administrative Fee Total Plumbing 5 One to Four Outlets Minimum Mechanical Permit Mechanical Administrative Fee Less than 100,000 BTU Vent Fan to One Duct Duct Heater UniUHeater Mechanical Issuance State Surcharge For Mechanical Permit Total Mechanical Mechanical 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 2 3 2 2 4 Impervious Surface Area - Storm Sanitary Sewer MWMC Administrative Fee SDC Administrative Fee Miscellaneous MWMC Miscellaneous Transportation Total System Development System Development 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 01/21/2000 323 682 4,531 15,241 12 1 Permits wlo Srchg 01/21/2000 323 Paving Total Permits w/o Srchg Grand Total Plan Check Type Initial Review-C/IIP Engineering-CII/P PJanning-CII/P Structural-C/I/P Fire Marshal-C/I/P By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertainin~ to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project. 59,248 Checked By Lisa Hopper Date Completed 01/18/2000 Fee Amount $,00 $50,00 $15.40 $40,00 $40,00 $70,00 $20,00 $6,60 $242,00 $2,00 $,00 $1,32 $12,00 $9,00 $9,00 $12,00 $10,00 $3,08 $58.40 $3,535,91 $579,24 $10,00 $466,92 $682.41 $4,530,79 $9,805.27 $313,00 $313.00 $11,917.09 I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is Icoated at the front of the property, an;0the J approved set of plans will remain on the site at all times during construction, . . f} / , 1A-f_Y ~ -r~ . . . ATTACHMENT A CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET JOURNAL OR JOB NUMBER tJo,biI\l0!l~9j11S.09~iWoi'''''''...Ii c"...JII!Ji.io,~'1.i- i,I"." NAME OR COMPANY: ~imi1l!!;amh~I!ife;'FOjiClilP,Jioio~raphv.'" C.z!~ . LOCATION: ~2:089JllaurOlS,Ieel:'-"'~ - ':~'LIbi...ll.l.A..w......,b~, 1'- _. iU il ""J."liIi II ,~~ TAX LOT NUMBER t1~7.r03123!rO~~2~U{~''''...t..... ~ DQ6. ~1I~,~I.i.:.~I_ tp"'-!U:.I..:....I l.....aii.' DEVELOPMENT TYPE: [~,onstructl!\!em:(!)fliCeJBjjilamg~\I,~'''''"-''''< ,,' "I:Y""'" -.- _ 'i~ - ."'..:....... p.... ':_~,i..~t.<J 1-- 7:" .' j-'::--.' Ct:"._ BUILDING SIZE: (New) _-~-I~:ln2lj!LOT SIZE I, STORM DRAINAGE IMPERVIOUS SQ, FT, III'!:' -,11S~2!1:1fil x 2, SANITARY SEWER-CITY $0,232 PER SQ, FT, NUMBER OF PFU's ~1'2~ x (SEE REVERSE SIDE) $48,27 PER PFU . 3, TRANSPORTATION -- No Change, Convert existing restaurant to new restaurant NuMBER OF TRIPS x TRIP RATE x COST PER PM PEAK HOUR TRIP ~5!:4:1'2~ x ~1~7[2Qe11 x $486,73 PER TRIP ,Iii 1 lIE. .,il~ x x $486,73 PER TRIP _'-; ,-. !... '~7~""< TOTAL TRANSPORTATION SDC 4, SANITARY SEWER - MWMC -- No Change, Convert existing restaurant to new restaurant A. REIMBURSEMENT COST: NUMBER OF FEU's iiIiiiIillI~!:4:I'2~ x Il$'r-"ilJ03,8~7'2111PER FEU . B, IMPROVEMENT COST: NUMBER OF FEU's ~5!tU'2Bil11'i1 x a$ MWMC CREDIT IF APPLICABLE (SEE REVERSE) MWMC ADMINISTRATIVE FEE "'1'2!60Jl PER FEU TOTAL MWMC SDC SUBTOTAL (ADD ITEMS 1,2,3, & 4) 5, ADMINISTRATIVE FEES: BASE CHARGE (SUBTOTAL ABOVE) x 0,05 TOTAL SDC CHARGES I $9,805.27 I &~uJ~ -r!<<f~Jf7 2089Laura,xls .LI .'~-'-2'1l'59.8M $3.535,91 I I' $579,24 I I $4.530,791 $0,00 $4.530,79 I $750,75 I I 1$ I $68,19 I (136,54)1 $10,00 I $692.41 I $9,338,351 $466,92 I . . PLUMBING FIXTURE UNIT (PFU) CALCULATION TABLE NUMBER OF NEW FIXTURES x UNIT EQUlV ALENT = PLUMBING FIXTURE UNITS !NOTE: FOR REMODELS, CALCULATE ONT.V THE NET AQOmONAL F1X~lRES) _ FIXTURE TYPE BATHTUB DRINKING FOUNTAIN FLOOR DRAIN INTERCEPTORS FOR GREASE/OIUSOLIDS/ETC, INTERCEPTORS FOR SANDI AUTO W ASH/ETC, LAUNDRY TUB/CLOTHESW ASHER/MOP SINK CLOTHESW ASHER. 3 OR MORE MOBILE HOME PARK TRAP (I PER TRAILER) RECEPTOR FOR REFRIGERA TOR/W A TER ST A TION/ETC. RECEPTOR FOR COMMERCIAL SINK! DISHW ASHER/ETC, SHOWER, SINGLE STALL SHOWER, GANG (NUMBER OF HEADS) SINK: BAR, COMMERCIAL, RESIDENTIAL KITCHEN URINAL, STALUWALL WASH BASIN/LA V ATORY, SINGLE OR DOUBLE TOILET, PUBLIC INSTALLATION TOILET, PRIVATE INSTALLATION MISCELLANEOUS: FIXTURES UNiT NEW OLD EQUIVALENT W- . 2 _ AI I 2 3 6 2 6 6 I 3 2 I 2 2 1 6 4 '~J,.I.lii.'llll ~J.II!I""","*~ -"='--=~ t"""'~~"--"'':'''I'..i.L-'''''".tl. - .;va.....-wo.....:. Ll_;l,w...................::L. 5l1.1' OL.J L..~ '".a.~.._. L. ...". ~J.J~I~- ~ ..lI.aMawoL "'2 - ~ --.- ,. Pllla}2 o4..lUi-~ ~Jo\'li~li4, &I. "'.JI- ~,.I",J~.II, ~ ~~'!.i''''''''_.iLllII.A_I.oI.j~,i11lijj .IIH olJ.llIIlJloiI III ." ..nl :.i", , ~l~ ,'-" +::"'- .~~-F": .. ., .. PLUMBING FIXTURE UNITS o o o o o o o o o o o o 2 o 2 o 8 o o o TOTAL PLUMBING FIXTURE UNITS 12 CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEP ARA TEL Y YEAR ANNEXED 1979 or before 1980 1981 1982 1983 1984 1985 1986 1987 1988 RATE PER $1,000 ASSESSED V ALill' $4.47 $4.38 $4,32 $4,20 $4,03 $ 3,88 $3,68 $ 3,38 $3,03 $2,62 Year Annexed: 1973 YEAR . ANNEXED 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 RATE PER $1,000 ASSESSED VALUE $2,18 $ 1.75 $ 1.35 $ 1.17 $ 1.03 $0,86 $0,71 $ 0,57 $0.39 $0,18 CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLEIf.4!.4i7Ail IMPROVEMENT (IF AFTER ANNEXA TION DATE) ,."...,~._, NOTE: CREDIT CARRIED OVER FROM JOB NO. 990425 x 1I$......-1.0~55t x ~~~ ,. ~"- CREDIT TOTAL 2089Laura,xls I $ I I $ 136,541 136,541