HomeMy WebLinkAboutPermit Correspondence 2002-5-6
&bhii" & ",,66aM _;11''''
MECHANICAl, ELECTRICAl, CIVIl,
TRANSPORTA110N ENGINEERS & SURVEYORS
975 LINCOlN ST.. EUGENE, OR 97401
PO BOX 10347, EUGENE, OR 97440
(541) 686-8478 (phone) I (541) 346-5303 (fax)
~~~ w~~ IJ~~ I.~"~'
-,'
. MEMORANDUM
/9 '1/ L-;1 /J /lIft-
(J 1- -(J() '2/) 9- t) /
TO
COMPANY
PROJECT
SUBJECT
FROM
Brian Cheever
FM Sheet Metal
Hyland Construction Spray Booth
Review exhaust duct configuration and routing
Tim ReynOlds
May 6, 2002
PAGES: 1
Brian,
As you requested, I have reviewed the 11")(17" drawing of the Hyland paint booth system you sent
to our office a short time ago. The exhaust duct is routed froJil the discharg(jl of the exhaust fan to a
termination point above the roof of the building. The drawing ,titled Sheet 1 of 1, and dated 3-20-02,
includes two elevation views of the bUilding and duct. Based on the drawing, it appears the exhaust
duct meets requirements of applicable Building and Mechanical codes and the requirements of NFPA
91. Please give me a call if you have any questions or need additional information.
- / tit-r
Tim Reynolds, P.E.
Mechanical Engineer
COPIES TO:
Keith Hubbard, BHE
TOTAL P.02
.
/
.
~
'--.../
'--.../
:TI::
FIL TER
AREA
L
-12'
FIL TER
AREA
fRONT VIE\./
~
.
13'-6'
I"
6'
,
I
IV2.Cl:NTOll."",-0/1
""1US...o.lI<Ns~1
.
.
23"
1/1"\
2""" ~l" ",. ~-
.... CT_ , ,. SP--q-
26' ~ EXHAUST DUCT
AIR FLJ\./
~2'
.3'-
SIDE VIE\{
I TITLE: HYlAND 5PRAY BOOTH
I
i5HEET: I OF I I ~ SHEETMETAL,INC.
[SCALE: 3/ I G"= I '-0' I flu H"ling'::~o:.=t10Dlng
I DATE: 3-20-02 I E......<>ntoo .,,'"
, ($41) J44.6OO1 (SOU) ~7954 FAX
I DRAWN BY: RB I ' '................m