Loading...
HomeMy WebLinkAboutPermit Building 1996-6-4 225 Fifth Street, Springfield, Oregon 97477 ~ . . I COMM ERCIALlI N DUSTRIA~ PERMIT APPLICATION JOB NUMBERS Cl7t')<:::;" INSPECTION LINE: 726.3769 OFFICE: 726.3759 ASSESSORS MAP: /7/J ~ J g.,..;; Z, L,o/,/~,4 2.. 7 / (.:) / LOCATION OF PROPOSED WORK: TAX LOT: 0"2.,90.:/ OWNER:_LYJ'CPC i//.otIP/&:;#-/ ADDRESS: &.0n / ~h-/ _ L./ ~ CITY: ~r) STATE:~ ~~my= PHONE: ~fL-~ - <;:2, 2,S-4":> ZIP: Q7~77 NEW REMODEL ADDITION /5</..5'7 J> .~~S /A~ )aF ,..--- DEMOLISH OTHER VALUE: DESCRIPTION OF WORK: NAME ADDRESS PHONE ARCHITECT' CONTRACTOR'S NAME GENERA' .4-1 hc>r/~ PLUMBING: MECHANICAl' ADD RESS CONST. CONTRACTOR' EXPIRES PHONE ELECTRICA' . PLUMBING NO. ' FEE Single Fixture Relocaled Bldg. Inew Ilx. addtl) Water Service MECHANICAL Furnacel burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs CC:I= I I ("I:IARGi I I I I I I I I I $10.00 I I CHAR.GE "'n II. Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationaryevap. cooler Vent Fan/Single duct Vent System apart from AC or htg. . Mechanical exhaust hood and duct Sanitary Sewer Storm Sewer II. II. Backllow Device ".Perml! Issuance TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS' OUAD AREA: . OF BLDGS: LAND US.' FLOOD PLAIN: ZONING' OCCY GROUP' . OF UNfTS: CONSTR. TYp., HEAT SOURC.' LIGHTING POWER BUOGET: . OF STORIES: WATER HEATER: sa. FT. $/SO. FT. , , VALUE , , sa. FTG MAIN X X " .' sa. FTG ACCESS sa. FTG OTHER X = /. TOTAL VALUE OF PROJECT 4ci:J7J.'1J'O PLAN CHECK FEE RCPTN DATE BY I BUILDIN, G PERMIT ~ 1?-,5"0 15% State :z,~3+-/." .... f:7 SurcharQe . ~. I MECHANICAL 5% Stale Surcharae PAVING PLUMBING DEMOLITION 5% Slate Surcharge I FENCE VAlN~ ~_ SIDEWALK FT. SUBTOTAL PERMITS SYSTEMS DEVELOPMENT I CURBCUT FT. '. -, I TOTAL 'PERMIT FEES EXCLUDING ELECTRICAl -/8 ,~7 . REQUIRED INSPECTIONS . It is the responsibility of the permit holder to see that alllnspectlons are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:09 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but . prlqr to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & . MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work Is to be covered until these Inspections have been made and approved. ATTIC DRAFT sTCiPS &". CURTAIN WALLS - FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. , FIREPLACE: Prior to placing facing materials and before framing inspectio~.. '~.' FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancIllary equipment items are In place but before any concrete Is placed. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering is applied. . UNDERGROUND: Plumbing, electrIcal, gas, sanItary sewer, storm sewer, water and dralnage'lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor Insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans, POST & BEAM: To be made prior to InstallatIon of floor InsulatIon, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is In place but before any plasterIng Is applied or before gypsum board Joints and fasteners are taped and finished. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. MASONRY: Steel location, bond beams grouting or vertIcals in accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel Is In place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by. the OwnerJ Contractor during construction of the following work. A copy of the special.testlng reports shall be furnished to the Building DivisIon. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306.a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43.8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 8.11 & Chapter 29) GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed, (2501 u.se, STDS. 25.10,11). STRUCTURAL MASONRY: (306 a.7) . v --.l?b?<<2F r * In addition to the lnspec-' tlons specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City oT Development Code. FINAL PLUMBING ------------------------------------------------------- SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish inspection. All project conditlons such as landscaping, parkIng lot striping, etc. must be completed before requesting this Inspection. FINAL ELECTRICAL FINAL BUILDING: Requeste~ after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certiflcate of Occupancy has been issued by the Building DIvision and posted on the premises. FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' ~O/ >>?/"y,~. ~~r ~/ir /",I.A.~~I',P7~ ~) I - ~F= ( ,....~~. ~~/r./.Y/F / '~ , , PLANS REVIEWED BY 4#~ -, . DATE ~/rG.- By signature, I state and agree, that I have carefully examined the completed applicatIon and do hereby certify th?t all Information herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety DIvision. I further certify that only contractors and employees who are In compliance with ORS 701.055 witl be used on this project. ~ . . I further agree to ensure that all required InspectIons are requested at the proper time, that project addres's Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times durIng construction. -, Signature. /)~k"'~ f~d;0 1/ ~ If (j ) Mq/f/- u 4%,~7 2/7~fl> VALIDATION: AMOUNT RECEIVED: RECEI PT ': ~ Date ~/fO~ DATE PAID: b/.,f~6 RECEIVED BY:~~