HomeMy WebLinkAboutPermit Building 1991-10-1
, .
JCOMM ERCIAL/INDUSTRIAL
; PERMIT APPLICATION
225,'Fifth Street, Springfield, Oregon 97477
I
LOCATION OF PROPOSED WORK' /&CJ
AS~ESSORS MAP' ,o-.t:''3-:;r;>-/C7
~
/ AvR#- -??-,
. .
O\''':INER: !M~&;; ;3vs./--= ~ ~~
ADbRESS' - "5~ ~'
~~t-D
,
"
CITY'
STAT'"
..
9///Qe,
JOB NUMBER
INSPECTION LINE: 726.3769
OFFICE: 726.3759
TAX LOT'
c..- -;,.' :::J-~
PHONE:
~
~
~?:?
ZIP:
DE~CRIPTlON OF WORK:-k/l? _r E)'i'l5-?', .'B..J~'!',,- '"
,I
NEW REMODEL ADDITION DEMOLISH OTHER
,II
ARCHITECT'
"
,
NAME
CONTRACTOR'S NAME
II /?F' ~
GENERAL:~;r..::r: ~~<"J""""
'I
PLUMBING'
ADDRESS
ADDRESS ~ '
~Z~~~
i' / ,
C'-~ ~~_ /-"2~-9'<.~ ?.......c::~::>/
, r
MECHANICA' .
,
ELECTRICAl'
I[ .
:;
NO,
PLUMBING
FEE
Single Fixture
Relocated Bldg.
(new fix. addtl)
. Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
:1
U.
... -. ..... .
Backflow Device
, , \... -. -. ,....... -..
II:
1]1
I,I
I
I 'TOTAL PERMIT
OUAD AREA:
# OF BLDGS'
II
OCCY GROUP'
!I
# OF STORIEF'
LAND USF'
# OF UNITf"
CONSTR, TYPF'
CHARGE
- OFFICE USE -
SQ FT
HEAT SOURCE:
$/SQ, FT,
,
SQ. FTG MAIN
X
SQ, FTG ACCES~~_
jl ~
SQ, FTG OTHER 6JI!i. ~,-~
il r
X
X
II
PLAN CHECK FF"
,
RCPT'
I BUILDING PERMIT
,I
15% State
Surcharge
MECHANICAL
PLUMBING
3/~.-
/:).5t> ,
5% State
SurcharQe
FENCE
VALUE $
SIDEWALK
I
I
I
CURBCUT
5% State
Surcharce
I PAVI NO.
,I
. ~ '...... '..
DATF
FT.
FT.
VALUE:~~
/
PHONE
CONST.
CONTRACTOR #
EXPIRES
PHONE
MECHANICAL
I
~I:!ARGI
I
I
I
I
I
I
I
I
I
I
I
NO I:J:J:
Furnacel burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit Issuance
TOTAL PERMIT
HANDICAP ACCESS:
FLOOD PLAIN'
ZONIN(,'
LIGHTING POWER BUDGET:
WATER HEATER:
VALUE
/~.
.:;...
,
TOTAL VALUE OF PROJEI'T
BY
DEMOLITION
SUBTOTAL
PERMITS
SYSTEMS
DEVELOPMENT
.
.. .':.-' \
TOTAL PERMIT FEES
EXCLUDING ELECTRICAl
'3'2.:)- Se>
-j
$10,00
I
I
I
I
I
I .
I .
.' .'", i., REQUIRED INSPECTIONS . ""-
It is the responsibility of the permit holder to see that all inspections are made at the proper time, To request an inspection, call ..
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day, I
SITE INSPECTION: To be ROUGH,PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL"& u" place but prior to placing
prior to setup of forms.1 MECHANICAL: No work is to asphalt or concrete.
be covered until these
inspections have been made
and approved, .
...
I
UNDERSLAB PLUMBING,
, ELECTRICAL & :
MECHANICAL: To be made
before any work Is covered.
I
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concret'e.
, . I
CONCRETE SLAB: To b'e
made after all Inslab bu'llding
service equipment, conauit,
piping, accessories and other
ancillary equipment items are
in place but before any 'I
concrete is placed.
, I
. ,
UNDERGROUND: Plumbing,
electrical, gas, sanitary 'sewer,
storm sewer, water and:
drainage lines. To be made
prior to covering or filling
trenches. 1
,
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installatioh of
floor insulation, decking or
floor sheathing. I
i '
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor,
sheathing.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and ,before
framing Inspection. /
.....
SPECIAL INSPECTIONS: In accordance
, Section 306 of the State Specialty Code
"a special inspector shall be employed
by the Owner! Contractor during
construction of the following work, A
copy of the special testing reports shall
be furnished to the Building Division.
FRAMING: To be made after
the roof, all frami'ng, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, 'plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 PS,1. (306 a,1)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
INSULATION & VAPOR
BARRIER: To be made.after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering Is
applied. .
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a,6)
SPRAYED ON
FIREPROOFING: U,B.G.
Standards 43.8,
I)
I
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a.11 &
Chapter 29)
FLOOR INSULATION &
VAPOR BARRIERS: To be SIDEWALK & DRIVEWAY:
made prior to installation of Required for all concrete
decking or floor sheathing. paving within street right of
I way, to be made after all
MASONRY: Steel location, excavating complete and form
bond beams grouting or! work and sub-base material in '"In addition to the inspec-
verticals In accordance with place. t10ns specified, the Building
UBC 2415. ! Official may make or require
I CURB AND APPROACH other Inspections of any
ROOF SHEATHING AND, APRONS: After forms are construction work to ensure
NAILING: Prior to installing erected but prior to placing compliance with the Building,
any roof covering. I concrete. City or Development Code.
-------------------------------------------------------
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, Is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed, (2501 U,B.C.
STDS. 25.10,11),
IX
STRUCTURAL MASONRY: (306
a.7)
~/k
~ ..fZ'fc:/62;;?
FINAL PLUMBING
FINAL ELECTRICAL
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting -this Inspection.
)c
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FINAL MECHANICAL
I
FINAL FIRE DEPARTMENT
I
ADDtTIONAL COMMENTS'
PLANS REVIEWED BY
DATF
I
By signature, I state and agree, that I, have carefully examined the completed application and do hereby certify that all Information
herein is true and correct, and I furtper certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure wlthoutlpermisslon of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure, that all reqLired inspections are requested at the proper time, that proJect'address Is readable from the
street, that the permit card Is located at the front of the property. and the approved set of plans will remain on the site at all
times during construction. 1.0 j .
Signature /": ~ Datp /Ci-/ -~/
I
I ..... ~
AMOUNT RECEIVED: ~~:':> - ,/ c:>
I .-
RECEIPT ': ~ (~~ cr
I
I
DATE PAID: /t:)-/-"7/
RECEIVED BY:~ ~ -