Loading...
HomeMy WebLinkAboutItem 20 Council Initiation of a Type II, Site Specific Amendment of the Metropolitan Area General Plan (Metro Plan) AGENDA ITEM SUMMARY Meeting Date: April 21, 2008 Meeting Type: Regular Department: Development Services Staff Contact: Gregory Mott fjA/2 \. \ S P R I N G FIE L D Staff Phone No: 726-3774 , ~"..... C I T Y C 0 U N C I L Estimated Time: 10 Minutes ITEM TITLE: COUNCIL INITIATION OF A TYPE II, SITE SPECIFIC AMENDMENT OF THE METROPOLITAN AREA GENERAL PLAN (METRO PLAN) ACTION REQUESTED: Approval of the following motion: Move to initiate the process of Public Facilities and Services Plan map and table amendment and concurrent Metro Plan amendment, as provided in Chapter VI Amendments to the Plan of the PFSP, Chapter IV Metro Plan Review, Amendments and Refinements, and Section 5.14-120 of the Springfield Development Code, to add, modify or remove 13 projects including pipes and pump stations within Springfield's urban growth boundary consistent with the recommendations contained in the recently completed Wastewater Master Plan of the City of Springfield 2008. ISSUE STATEMENT: The city contracted with CH2MHill to update the city's 30-year old sanitary sewer master plan; plans of this type supplement, but do not substitute for the PFSP and therefore do not need to be incorporated into the PFSP. However, some recommendations prepared by CH2MHill for this study, including pipe size and pump stations and completed projects, do require amendment of the PFSP because they are considered significant by Oregon Administrative Rule (660-011-0045). ATTACHMENTS.: 1. Table 4 of the PFSP: City of Springfield Wastewater System Improvement Projects (legislative format); and Table 16 of the PFSP: City of Springfield Wastewater System Improvements, Estimated Costs, and Timing (legislative format) 2. Map 2 of the PFSP: Planned MWMC Wastewater Project Sites 3. Figure 1: System Improvements City of Springfield Wastewater Master Plan (to be adopted into Map 2 above) DISCUSSION/ FINANCIAL IMPACT: The new wastewater master plan for the City of Springfield updates and improves the existing 30-year old master plan. The master plan supplements the PFSP by implementing Policy G.3 of the Metro Plan: "Use local facility master plans, refinements plans, and ordinances as the guide for detailed planning and project implementation." The master plan's list of projects includes nine that are or need to be included on the PFSP project list. In addition, three projects on the list have been completed and one project eliminated; therefore these projects should be deleted from the list and map. Springfield and Lane County only will conduct public hearings (May 6, 2008 Planning Commissions; Elected Officials TBD). Table 4 City of Springfield Wastewater System Improvement Projects Project Project Name/Description Number Short- Term 104 Jasper Road sewer extension ~ GafFle Fann Road tnmk se"lIer 105 1 Oth & N Street Upgrade .we GatewaylHarlow Road pump station upgrade 106 E Street (Central Trunk) upgrade 107 Main Street Sewer upgrade # 1 108 Nug11;et Way pump station upgrade 109 Hayden Lo pump station upgrade 110 River Glen pump station upgrade Lon/!- Term ~ East Glmrl.'ood grayity se".-ver . 202 Harbor Drive pump station ~ -l-9tIrStreet pump statiOll , 203 Peace Health pump station Table 16 City of Springfield Wastewater System Improvements, Estimated Costs, and Timing Project Project Name/Description Cost Estimated Completion Number ($000) Year Short Term -l-Q4 T~~_~_ D ,;I ~~"'~_ ~ 1999 2001 ... ................. ... '-'-'...~........ ..... 104 Jasper Road sewer extension 11,600 2010-2012 ~ Gam.e Fann Road trunk se'.ver ~ 1999 2001 105 10th & N Street Upgrade 3,950 2010 .we Gate,-';ay/Harlov.' Road pump station upgrade ~ 1999 2001 106 E Street (Central Trunk) upgrade 2,500 2010-2013 107 Main Street Sewer upgrade # 1 2,100 2010-2013 108 Nugget Way pump station upgrade 1,400 2010 109 Hayden Lo pump station upgrade 1,050 2010-2013 110 River Glen pump station upgrade 1,200 2010-2013 LODe Term ~ Dnn4- ~1 .J -- -l-;-lOO 2005 2006 ~........ ~._.. 1">.0"" 'H'J ...._ '_.0 202 Harbor Drive pump station 3,340 2015-2020 ~ -l-9tIr Cl~. - ~ ~4-~..:~_ WG 2005 2006 .u...."''''.. p....u.op 203 Peace Health pump station 3, 190 2012-2017 ATTACHMENT 1-1 \ -, '-1, " Eugene-Springfield Public Facilities and Services Plan Planned MWMC Wastewater Project Sites ~ Further details of specific projects at each of the identified sites are described in tables 3, 4, 4a and 4b o a: ::J j; z w w a: t!l Planned Metro Wastewater Sites II Regional Pump Station A Screw Pump Station m Local Pump Station . Regional Wastewater Treatment Site D Metro Plan Boundary Metro Urban Growth Boundary _ Urban Reserves - Proposed Wastewater Lines of 24" or larger Note: Urban Reserves are now being studied as part of the Metropolitan Urban Reserve Analysis Periodic Review Study. o 2 Miles > -I -I > n :I: 3: m z -I I\.) I ~ r '--- __",J I j ,// J"'~ NOTES: 1. Facilites shown outside the UGB cannot be located as shown without first obtaining Lane County land use approval. 2. The general locations of the facilities are shown on this map. Exact project locations are determined through local processes. . MAP 2 March, 2004 ~~ .203 )> -I -I )> n ::I: 3: m z -I w I ~ . 202 -.. -..... .,// -" --/ . .. Existing Pump Station Improvements - Existing Pipe Improvement Future Pump Stations - Existing Major Wastewater System Pipes o Urban Growth Boundary ... WeirlDiversion File Path', ,'.Simbz,~pfoj'SPfingfi~clOfCityOf~350457\GJS~Map_Docun;er.ts.sySlen;Improvements_Figl.mlfo, Date: Apr~ 14.2008 McKenzie Rivt)r J 2,000 4,000 I" I I I Approximate $Cale in feet FIGURE 1 System Improvements City of Springfield Wastewater Master Plan CH2MHILL