Loading...
HomeMy WebLinkAboutPermit Mechanical 1991-8-16 . COMMERCIALIINDUSTRI,,-e- PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477. ~ .-. JOB NUMBER '9/J/ ?..2'R INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK' ASSESSORS MAP' /7-.?J~-':r:z-<e> "97 / ,lfRV~ h:#~ j'P7E;--C/f:S fi":?V""/ =-c.-6: ADDRESS: '7&; S- / .#/LL~~ P;7-? 7-? r:PP~ I - DESCRIPTION OF WORK: ,,~E.G6"~# /oC...9L. ,.&)'i' ?~L ,&./<.D/~ NEW REMODEL ADDITION DEMOLISH OTHER VALUE: STAT'" LL2. TAX LOT: l'!/-O~tO&::' wi:.. PHONE: -:T'Y V - 7,cg'/p ~. ZIP' "9'6'~:::2.. OWNER' CITY' NAME ADDRESS PHONE ARCHITECT' CONTRACTOR'S NAME ADDRESS CONST. CO NT RACTO R . EXPIRES PHONE GENERA' . PLUMBIN'" MECHANICAI'/:/'/7. 5~ :> "Yy <<$~.F.-'! ~ . .- ~/~-"L. . ~.' -.--';;-~.. ..;;~~ 7-? t'~:::< r.r r /" .~v -/-h--.? ELECTRICA' . PLUMBING MECHANICAL. I NO. FEE CHARGE Nn """ ""ABG1 . Single Fixture I Furnace/burner & vent < 100.000 BTUs Relocated Bldg. Furnace/burner & vent I (new fix: addU) > 100.000 BTUs Water Service Floor furnace and vent I ft. 1 Sanitary Sew~r Suspended wall or floor I ft. mounted unit heater 1 Storm Sewer Appliance Vent I ft. separate I Stationary evap. I Backflow Device cooler I Vent Fan/Single I duct I Vent System apart I from AC or hlg. 1 Mechanical exhaust 1 hood and duct 1 ~/AI- / ,,:>--' .....1 I " Permit Issuance $10.00 I 1 TOTAL PERMIT TOTAL PERMIT ::< s: ......1 - OFFICE USE - HANDICAP ACCESS' FLOOD PLAIN' aUAD AREA" LAND USF' . OF BLDGf' . OF UNITo. ZONING' . OF STORIEf" CONSTR. TYP'" HEAT SOURCF' LIGHTING POWER BUDGET: WATER HEATER' OCCY GROUP' sa. FT. $/sa. FT. VALUE sa. FTG MAIN sa. FTG ACCESS sa. FTG OTHER X X X TOTAL VALUE OF PROJECT PLAN CHECK F"" RCPTN DATF 1 BUILDING PERMIT PLUMBING 5% State 5% State Surcharge SurcharQe MECHANICAL ~ 5: -<:> FENCE' VALUE $ 15% State /.'2:;;- SIDEWALK Surcharae FT. I PAVING CURBCUT FT. BY DEMOLITION SUBTOTAL PERM ITS SYSTEMS DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICAl 26_2> . ~EaUIRED INSPECTION_ .. It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an Inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. )If ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. PAVING: After gravel is In place but prior to placing asphalt or concrete. UNDERSLAB PLUMBING, . ELECTRICAL & MECHANICAL: To be made before any work Is covered. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are In place but before any concrete is placed. FIREPLACE: Prior to placing facing materials and before framing Inspectlo~. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner! Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WAllS .FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. STRUCTURAL CONCRETE: In excess of 2500 PS.1. (306 a.1) STRUCTURAL WELDS: Performed on the iob. (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are In place but before any lath or gypsum . board interior wall covering Is applied. " HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. UNDERFlOOR: Plumbln9, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. 1306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a.7) MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. *In addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. ' CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL ELECTRICAL )( FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' ~ PLANS REVIEWED BY _~~~ /;_.~ DAT~ f?-/{!;; -'.7 / By signature, I state and agree, that' have carefully examined the completed application and do hereby certify that all Information herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with OR ill be used on this project. I further agree to ensure that all equired ins ections are requested at the proper time, that project address Is readable from the street, that the per car 10 at t front of the property, and the approved set of plans wI/I remain on the site at all t)1:Des during cons ruction. Si9n~ Date ~'l(o'91 RE 'L -~- ~ '>" -:? /,?''3 '3 DATE PAID: RECEIVED BY' GZY.:- ~? ./'2 Z> ".iI v "' VALIDATION: