HomeMy WebLinkAboutPermit Mechanical 1991-8-16
. COMMERCIALIINDUSTRI,,-e-
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477.
~
.-.
JOB NUMBER
'9/J/ ?..2'R
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK'
ASSESSORS MAP' /7-.?J~-':r:z-<e>
"97 / ,lfRV~ h:#~
j'P7E;--C/f:S fi":?V""/ =-c.-6:
ADDRESS: '7&; S- / .#/LL~~ P;7-?
7-? r:PP~
I -
DESCRIPTION OF WORK: ,,~E.G6"~# /oC...9L. ,.&)'i' ?~L ,&./<.D/~
NEW REMODEL ADDITION DEMOLISH OTHER VALUE:
STAT'"
LL2.
TAX LOT: l'!/-O~tO&::' wi:..
PHONE: -:T'Y V - 7,cg'/p ~.
ZIP' "9'6'~:::2..
OWNER'
CITY'
NAME
ADDRESS
PHONE
ARCHITECT'
CONTRACTOR'S NAME
ADDRESS
CONST.
CO NT RACTO R .
EXPIRES
PHONE
GENERA' .
PLUMBIN'"
MECHANICAI'/:/'/7.
5~
:> "Yy <<$~.F.-'! ~ .
.- ~/~-"L. . ~.' -.--';;-~.. ..;;~~ 7-? t'~:::<
r.r r /"
.~v -/-h--.?
ELECTRICA' .
PLUMBING MECHANICAL. I
NO. FEE CHARGE Nn """ ""ABG1
. Single Fixture I Furnace/burner & vent
< 100.000 BTUs
Relocated Bldg. Furnace/burner & vent I
(new fix: addU) > 100.000 BTUs
Water Service Floor furnace and vent I
ft.
1 Sanitary Sew~r Suspended wall or floor I
ft. mounted unit heater
1 Storm Sewer Appliance Vent I
ft. separate
I Stationary evap. I
Backflow Device cooler
I Vent Fan/Single I
duct
I Vent System apart I
from AC or hlg.
1 Mechanical exhaust 1
hood and duct
1 ~/AI- / ,,:>--' .....1
I " Permit Issuance $10.00 I
1 TOTAL PERMIT TOTAL PERMIT ::< s: ......1
- OFFICE USE -
HANDICAP ACCESS'
FLOOD PLAIN'
aUAD AREA"
LAND USF'
. OF BLDGf'
. OF UNITo.
ZONING'
. OF STORIEf"
CONSTR. TYP'"
HEAT SOURCF'
LIGHTING POWER BUDGET:
WATER HEATER'
OCCY GROUP'
sa. FT.
$/sa. FT.
VALUE
sa. FTG MAIN
sa. FTG ACCESS
sa. FTG OTHER
X
X
X
TOTAL VALUE OF PROJECT
PLAN CHECK F"" RCPTN DATF
1 BUILDING PERMIT PLUMBING
5% State 5% State
Surcharge SurcharQe
MECHANICAL ~ 5: -<:> FENCE'
VALUE $
15% State /.'2:;;- SIDEWALK
Surcharae FT.
I PAVING CURBCUT
FT.
BY
DEMOLITION
SUBTOTAL
PERM ITS
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
26_2>
. ~EaUIRED INSPECTION_ ..
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an Inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
)If
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After gravel is In
place but prior to placing
asphalt or concrete.
UNDERSLAB PLUMBING,
. ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
In place but before any
concrete is placed.
FIREPLACE: Prior to placing
facing materials and before
framing Inspectlo~.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner! Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WAllS
.FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
STRUCTURAL CONCRETE: In
excess of 2500 PS.1. (306 a.1)
STRUCTURAL WELDS:
Performed on the iob. (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are In place but
before any lath or gypsum
. board interior wall covering Is
applied. "
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
UNDERFlOOR: Plumbln9,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. 1306 a.11 &
Chapter 29)
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10,11).
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
STRUCTURAL MASONRY: (306
a.7)
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
*In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering. '
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FINAL ELECTRICAL
)(
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
~
PLANS REVIEWED BY _~~~ /;_.~ DAT~ f?-/{!;; -'.7 /
By signature, I state and agree, that' have carefully examined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compliance with OR ill be used on this project.
I further agree to ensure that all equired ins ections are requested at the proper time, that project address Is readable from the
street, that the per car 10 at t front of the property, and the approved set of plans wI/I remain on the site at all
t)1:Des during cons ruction.
Si9n~
Date
~'l(o'91
RE
'L -~- ~ '>"
-:? /,?''3 '3
DATE PAID:
RECEIVED BY'
GZY.:- ~?
./'2 Z>
".iI v
"'
VALIDATION: