Loading...
HomeMy WebLinkAboutPermit Building 2007-5-8 . Status Issued * .CITY OF SPRINGFIELD' Building/Combination Permit PERMIT NO: cOM2006-01136 ISSUED: 05/08/2007 APPLIED: 09/01/2006 EXPIRES: 1l/08/2007 VALUE: $ 224,803.00. 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line SITE ADDRESS: 1889 King Henry Ct Springfield ASSESSOR'S PARCEL NO.: KING HENRY'S COURT TYPE OF WORK: Single Family Residence TYPE OF USE: New Residential PROJECT DESCRIPTION: Single Family Residence, Lot 6 King Henry Owner: JOHN AND ROCHELLE MACDONALD Address: 438 SOUTH 69TH PLACE SPRINGFIELD OR 97478 Phone Number: 541-606-3440 Contractor Type General Electrical Plumbing I CONTRACTOR INFORMATION I Contractor License RB N ME CONTRACTORS INC 162665 SOURCE ELECTRICAL INC 160918 TOMS PLUMBING SERVICE INC 159425 BUILDING INFORMATION' Expiration Date 01106/2009 07/28/2008 05/1212008 Phone 54 I -521-8698 54 I -520-6466 541-607-8879 4 # of Stories: Height of Structure: Type of Heat: Water Type: Range Type: Energy Path: Sprinkled Building: 2 27.00 Lot Size: Sq Ft 1st Floor: Sq Ft 2nd Floor: Sq Ft Basement: Sq Ft Garage/Carport Sq Ft Other: Occupant Load: 6,234 960 1,341 # of Units: Primary Occupancy Group: Secondary Occupancy Group: Primary Construction Type Secondary Construction Type: # of Bedrooms: I R-3 SR-3.I VN 654 n/a I DEVELOPl\.t.". mFORMATION I Frontyard Setback: Side 1 Setback: Side 2 Setback: Rearyard Setback: Solar Setbacks: 20.00 5.00 7.00 20.00 0.00 Overlay Dist: # Street Trees Rqd: Paved Drive Rqd: % of Lot Coverage: 2 Yes 25.80 REQUIRED PARKING Total: 2 Handicapped: Compact: I PUBLIC IMPROVEMENTS I Street Improvements: Sidewalk Type: Fullv Improved Storm Sewer Available: Yes Special Instruction: Ulres you to 'T"'T'ENTION:Oregon law req unity p;, I t d by the Oregon I follow rules adop eTh se rules are set fortI' >Jotification cent~~1 0 t~rough OAR 952-001 . In OAR 952-001-. ain copies of the rules t 0090. '(ou may obt Note: the telepho~e calling the cen6:~~on Utility Notification number for \~e. _ . _!Vl(\_~32-2344). Curbside 5' DownspoutslDrains: Curb and Gutter NOTICE: THIS PERMIT SHALL EXPIRE IF THE WORK AUTHORiZED UNDER THIS PERMIT is NOT COMMENCED OR IS ABANDONED FOR ANY 180 D.~Y PERIOD. Notes: Paee I of 5 , -~ Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Description Tvpe of Construction Dwellines Garaee V Wood Frame Garaee . Fee Description Plan Review Residential + 10% Administrative Fee + 5% Technology Fee + 80/0 State Surcbarge 3 Baths One & Two Family Addressing Assignment Building Permit . Dryer Vent Exhaust Hoods Fire SF Fee - Residential Minimum/Adjustment Mechanical Plan Review Major - Planning Sanitary Sewer - Improvement Sanitary Sewer - Reimbursement SDC MWMC Administration SDC MWMC Improvement SDC MWMC Reimbursement SDC Sanitary/Storm Admin SDC Transpo Admin SDC Transpo Improvement SDC Transpo Reimbursement Storm Drainage Impervious Area Vent Fan Willamalane Single Family Total Amount Paid . .CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2006-01136 ISSUED: 05/08/2007 APPLIED: 09/0l/2006 EXPIRES: 1l/08/2007 VALUE: $ 224,803.00 I Valuation Descrintion I $ Per Sq Ft or multiplier $99.00 $26.00 Square Footage or Bid Amount 2,301.00 654.00 Value Date Calculated Total Value of Project $227,799.00 $17,004.00 $244,803.00 09/0112006 09/0112006 FpP~ tiiaJ Amount Paid Date Paid Receipt Number $631.74 $147.07 $76.05 $105.83 $306.00 $31.00 $971.90 $6.00 $9.00 $147.75 $12.00 $198.00 $534.34 $702.72 $10.00 $961.52 $91.61 $139.10 $68.91 $836.32 $189.58 $834.01 $18.00 $1,000.00 9/13/06 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07 5/9/07. 5/9/07 5/9/07 2200600000000001282 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 2200700000000000694 $8,028.45 I Plan Reviews I Paee 2 of5 . .CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2006-01136 ISSUED: 05/08/2007 APPLIED: 09/01/2006 EXPIRES: 11/08/2007 VALUE: $ 224,803.00 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Initial Review 09/11/2006 09111/2006 APP LLH Partial Submittal day prior to holiday. I was out the week of 5-8, plans were not routed until today (9/11/06). Applications were not complete - Held for additional information. Plan review fee has not been paid. Structural plan review not to be completed until plan review fee is paid. Initial Review 05/07/2007 05/07/2007 APP LLH Received plans from public works. Completed review and compiled information. Okay to issue. Initial Review 09/14/2006 09/14/2006 APP LLH Plan Review Fee paid. Okay to proceed with structural review. Plan nine Review 09/11/2006 WE SJS Waiting for final plat. Survey 5' minimum setback Plan nine Review 04/25/2007 04/25/2007 APP TAJ Public Works Review 04/26/2007 04/26/2007 WE JLP Rcvd from Planning 4/26/2007---Pla. was released--Not yet filed-- Waiting for Eng/Surveyor to file with LC & verification from Jon D. for PW review. JLP WI 4/26/07 Public Works Review 05/07/2007 05/04/2007 IO JLP PW rvw completed Fri 5/4/07 -- Unable to input into Tidemark due to computer issues. JLP 10 4/7/07 Public Works Review 05/07/2007 05/07/2007 APP JLP For this parcel in King Henry Court, it is the recommendation to the Building Division, by the City Engineer: "that no connections shall be made to sanitary or storm H2O systems, until the subdivision is accepted by City Council". Future Storm to curb & gutter. Curbcut & Sidewalk fees collected thru PIP process. JLP APP 5/7/07 Public Works Review 09/11I2006 09/1212006 WE JLP Can not complete PW Review.-- No final plat & Per Cheryl, many inspection issues remain un-resolved, RE: Sidewalks, Curbs, Driveway Locations, Sanitary Lines, and Storm Drainage.-- Waiting for inspection "OK", and Recorded Plat.JLP Structural. Review 09/11I2006 09/25/2006 APP RJB To Request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. Paee 3 of5 . .CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2006-01136 ISSUED: 05/08/2007 APPLIED: 09/01/2006 EXPIRES: 11/08/2007 VALUE: $ 224,803.00 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line I Rpn~""-'I:'i'.t'.I'\a.I Erosion/Grading Inspection: Prior to ground disturbance and after erosion measures are installed. Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or foundation inspection. Final Electric: When all electrical work is complete. Footing: After trencbes are excavated. Foundation: After forms are erected but prior to concrete placement. Post and Beam: Prior to tloor insulation or decking. Floor Insulation: Prior to decking. Shear Wall Nailing: Before covering sheathing with finish materials. Framing Inspection: Prior to cover and after all rougb in inspections have been approved. Wall Insulation: Prior to cover. Ceiling Insulation: Prior to cover. Hold Downs Installed: Special Inspection performed prior to placement of concrete. Provide report to City Building Inspector. Final Building: After all required inspections have been requested and approved and the building is complete. Perimeter Foundation Drains: After gravel and filter cloth is installed but prior to ba'ckfill. Undertloor Plumbing: Prior to insulation or decking. Undertloor Drain: Prior to cover or placement of concrete. Rough Plumbing: Prior to cover and including required testing. Water Line: Prior to filling trench and including required testing. Sanitary Sewer Line: Prior to filling trench and including required testing. Storm Sewer Line: Prior to filling trench. Drywell: Engineered Drywell is Required. Final Plumbing: When all plumbing work is complete. Undertloor Mechanical. Prior to insulation or decking and including required testing. Rough Mechanical: Prior to Cover Final Mechanical: When all mechanical work is complete. Rough Electric: Prior to Cover Electric Service: Approval required prior to utility company energizing service. Paee 4 of5 . Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Pbone 541-726-3676 Fax 541-726-3769 Inspection Line 6 CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2006-01136 ISSUED: 05/08/2007 APPLIED: 09/01/2006 EXPIRES: 11/08/2007 VALUE: $ 224,803.00 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from tbe street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times durin construction. . . - ~~1& Owner or C~tors Signature Paee 5 of5 ~- 7- 0/ Date . . b~ Wiilamalane .J" j p,,. & Recre,tion Ol,ma Job. No. (,XU., II!)IJJ ~~ SYSTEM DEVELOPMENT CHARGE . WORKSHEET NAME: . ,\\lnfl 4 ~ ~ChP~t?; ~\n(~NE: \ oD \0' 3W) ADDRESS: l1/!(IJ _1\ \ nC\ -tIr\ '9\. . STATE: I)QzIP:C\l4--~ .LOCATIQN OF PROPOSED BUILDING SITE: . Street f-c;fdre~s: . VNho. t\lf\ (-. \-\ E'f\ (\"~, ct Pial Nam".~ \\fl)\1\. T:.x Lot Numbell . . 1~ 'DEVELP.PMENT TYP!;; (Ched<"appropciate dwelling(s). sac calculations and dwemrig I We definifions are on the back.) . - . . A. ,SinCJIp.-FRmilv Dp.rn<,:hp.c . . \ Single 'Family home .'NO. OF UNITS \ Manufactured home no.t il'! a park . X $1,000 per unit.= $' \Om.oO; . , .., . -, B.SinCJI~FR mil':... AftRdip.d NO..Of UNITS , . .X .$924 per unit . = .' $ . C. Multi~Fami1yA?~rtment NO. OF UNITS X .$692 per unit -' $ " . D. MRnlJf~r:ff.lrl'\ri Homp. Park $ $ \ obO ,'CO Jf . NO.OFUNITS . WILLAMALANE SDC X '$699 per unit = 2. SDC CREDIT (II appUcable) soc-payer must lumlsh prool 01 Willamalane Credit approvaL See sac Credit Worksheet. $ 3~ TOTAL WILLAMALANE NET SDC ASSESSED (II SDC reduced lor Credil)___. '_~' }+' '\1 . .) .' 01 ,i(-/ Deveiap ent servr~Depa:rtment City af Springfield . . V(~/q ~. . $ . I \'iDn.cxJ /(1] CITY OF Spa FIELD SYSTEMS DEVELOPMENT JOURNAL OR JOB NUMBER: NAME OR COMPANY: LOCATION: TAX LOT NUMBER: DEVELOPMENT TYPE: NEW DWELLING UNITS C0M2006-0 1136 John Macdonald 1889 King Hei!.n' Ct Lot # 6 King He_~ Court SINGLE FAMILY RESIDENCE I BUILDING SIZE (SF' 1613 KSHEET LOT SIZE (SF): 6234 ~. I~ .f-< '" 6 ~ 1 STORM DRAINAGE DIRECT RUNOFF TO CITY STORM SYSTEM I IMPERVIOUS S.F. x I COST PER S.F. CHARGE I 2485.00 I $0.336 I = I $834.01 I RUNOFF ROUTED TO DRYWELL DESIGNED AND CONSTRUCTED TO CITY STANDARDS I IMPERVIOUS S.F. I x I COST PER S.F. I x 1 DISCOUNT RATE I I 1 0.00 I I $0.336 I 50% I ~ I ITEM 1 TOTAL - STORM DRAINAGE SDC I $834.01 I ' 2. SANITARY SEWER - r:ITY A REIMBURSEMENT COST: 1 NUMBER OF DFU's I x I 27 I COST PER DFU $26.03 B. IMPROVEMENT COST: I NUMBER OF DFU's I x r 1 27 I $19.79 ITEM 2 TOTAL - CITY SANITARY SEWER SDC =1 $1,237.06 3. TRANSPORTATION A REIMBURSEMENT COST: I ADT TRIP RATE I x L 9.57 I : NUMBE\OF UNITS I x I COST PER TRIP $19.81 B. IMPROVEMENT COST: I ADT TRIP RATE 1 x I NUMBER OF UNITS I x 1 COST PER TRIP I 9.57 1 1 1 I I $87.39 ITEM 3 TOTAL - TRANSPORT A nON SDC = , 51,025.90 DISCOUNT $0,00 $834.01 1070 I x INEW TRIP FACTORI I 1.00 I x INEWTRIPFACTORI I 1.00 1 5702.72 $534.34 $189.58 $836.32 I 1091 'I 11092 I 11093 1094 4 SANlTARY SEWER - MWMC A REIMBURSEMENT COST: INUMBER OF FEU's I x I . I B. IMPROVEMENT COST: INUMBER OF FEU's I x I 1 I ICOST PER FEU $91.61 ICOST PER FEU I $961.52 MWMC CREDIT IF APPLICABI.:E (SEE REVERSE) MWMC ADMINISTRATIVE FEE ITEM 4 TOTAL - MWMC SANITARY SEWER SDC =, 51,063.13 SUBTOTAL (ADD ITEMS 1, 2, 3, & 4) = I 5 ADMThI1"TRATIVF. FFE' I SUBTOTAL x I ADM.FEERATE 1= I $4,160.10 I I 5% I TOTAL SANITARY ADMINISTRATION FEE: TOTAL TRANSPORTATION ADMINISTRATION FEE: --.--- $4,160.10 = $91.61 1054 = $961.52 lOSS $0,00 1054 510.00 1056 ] I 139.10 1079 $68.91 ~ 1078 =, $4,368-'11 Jeff Prociw PREPARED BY DATE TOTAL SDC CHARGES 5/4/2007 CHARGE $208.01 . . DRAINAGE FIXTURE UNIT (DFU) CALCULA nON TABLE - NUMBER OF NEW FIXTURES x UNIT EQUlV ALENT = DRAlNAGE FIXTURE UNITS (NOTE: FOR REMODELS, CAl.CULA TE ONL V TIlE NET ADDITIONAL FIXTURES) NO. OF FIXTURES DRAINAGE UNIT FIXTURE FIXTURE TYPE NEW OLD EQUIVALENT UNITS ...-..---- IBATIITUB 2 0 3 I = 6 I IDRJNKJNG FOUNTAIN 0 0 1 = 0 I IFLOORDRAIN 0 0 3 = 0 \ I INTERCEPTORS FOR GREASE / OIL / SOLIDS / ETC. 0 0 3 = 0 INTERCEPTORS FOR SAND / AUTO WASH / ETC. 0 0 6 = 0 \LAUNDRY TIJB 0 0 .2 = 0 CLOTIlESWASHER/MOP SINK 1 0 3 = 3 !CLOTIlESWASHER - 3 OR MORE (EA) 0 0 6 = 0 [MOBILE HOME PARK TRAP (I PER TRAJLER) 0 0 12 = 0 IRECEPTOR FOR REFRlG / WATER STATION / ETC. 0 0 1 = 0 IRECEPTOR FOR COM. SINK / DISHWASHER / ETC. 1 0 3 = 3 ISHOWER. SINGLE STAl.L 0 0 2 .- 0 SHOWER, GANG ~ER OF HEADS\. 0 0 2 = 0 SINK: COMMERCWJRESIDENTIAl. KITCHEN 1 0 3 = 3 SINK: COMMERCIAL BAR 0 0 2 = 0 ISINK: WASH BASIN/DOUBLE LAVATORY 0 0 2 = 0 ISINK: SINGLE LAVATORYIRESIDENTIAL BAR 3 0 1 = 3 IURINAL, STALL/WALL .0 0 5 = 0 ITOILET. PUBLIC INSTALLATION 0 0 6 = 0 ITOILET. PRlV ATE INSTALLATION 3 0 3 = 9 MISCELLANEOUS DFU TYPE NUMBER OF EDU'S 20 = 0 TOTAL DRAINAGE FIXTURE 1JN1TS 27 -EDD (Equivalent Dwelling Unit) is a discharge equivalent to a single family dwelling unit (20 DFU's) set at 167 gallons per day MWMC CREDIT CALCULATION TABLE: BASED ON COUNTY ASSESSED VALUE YEAR ANNEXED BEFORE 1979 1979 1980 1981 . 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 CREDIT RATFJ$I,OOO ASSESSED V AWE .... . $5.29'.. . f~~l'~, , ..:..$4.80....., >$4.63' . ,,$4.:40..' $4.07 ..' $3.67:" ':$3.22::- '. $2.73' '. $2.25 . $1.80 .$1.59". . $1.45" $1.25'..,: .' $1.09 $0.92. ., $0.72 " .$0:48".' $0.28., . $0.09. . $0.05 .. ~. IS LAND ELGlBLE FOR ANNEXATION CREDIT? 2 II (Enter 1 for Yes. 2 for No) I IS IMPROVEMENT ELGlBLE FOR ANNEX. CREDIT? 2 (Enter I for Yes. 2 for No) I BASE YEAR 1979 CREDIT FOR LAND (IF APPLICABLE) I V Al.UE / 1000 CREDIT RATE $0.00 x $5.29 = I $0.00 I CREDIT FOR IMPROVEMENT (IF AFTER ANNEXATION) I VALUE /1000 CREDIT RATE $0.00 x $5.29 0 I I TOTAL MWMC CREDIT = $0.00 1 225 Fifth Street Springfield, Oregon 97477 541-726-3759 Phone Job/Journal Number COM2006-01136 COM2006-01136 COM2006-01136 COM2006-01136 COM2006-01136 COM2006-01136 COM2006-0 1136 COM2006-01136 COM2006-0 1136 COM2006-0 1136 COM2006-0 1136 COM2006-0 1136 COM2006-0 1136 COM2006-01136 I COM2006-01136 COM2006-0 1136 COM2006-01136 COM2006-0 1136 COM2006-01136 COM2006-01136 COM2006-01136 COM2006-01136 COM2006-01136 Payments: Type of Payment CreditCard cReceintl . n:a~~~.. .. Wi:. -. . '. "" c&of Springfield Official Receipt .Iopment Services Department Public Works Department RECEIPT #: 2200700000000000694 Date: 05/09/2007 Description Addressing Assignment Willamalane Single Family Fire SF Fee - Residential Building Permit 3 Baths One & Two Family Vent Fan Exhaust Hoods Dryer Vent M inimum/ Adjustment Mechanical Plan Review Major - Planning Storm Drainage Impervious Area Sanitary Sewer - Reimbursement Sanitary Sewer - Improvement SDC Transpo Reimbursement SDC Transpo Improvement SDC MWMC Reimbursement SDC MWMC Improvement SDC MWMC Administration SDC Sanitary/Storm Admin SDC Transpo Admin + 5% Technology Fee + 8% State Surcharge + 10% Administrative Fee Paid By JACK LOUIE Item Total: l:heck Number Authorization Received By Batch Number Number How Received IIh 987631 Phone Payment Total: Page I of I 8:08:56AM Amount Due 31.00 1,000.00 147.75 971.90 306.00 18.00 9.00 6.00 12.00 198.00 834.01 702.72 534.34 189.58 836.32 91.61 961.52 10.00 139.10 68.91 76.05 105.83 147.07 $7,396.71 Amount Paid $7,396.71 $7,396.71 I J 5/9/2007