HomeMy WebLinkAboutPermit Mechanical 1986-10-16 (2)
I
I
4~ry ~J/CZ ~ V~~?~ c;?7Y77
Z~72~/;S-, )b7h~r:d'r;;;//Zb/C-/_V~/~7/L776
~~/d ,,-Yr/c::-/~ ~ $~ ~.,,;-/ -~,;:P;?
IV. 5k~5 ~ 7-6e/...~/-/ .S-~4~O/="~*?
7~ON OF PROPOSED .WORK - BE SPECIFIC _ I~D ~ VALUE
_;=-::~~.-~_/'_-///rP~~._ ~~.4P/~/XUJ/c?~~
.. OF B~~ ~___ I # OF S~~RIJS/ I If OF E~~? - _ r WATEfCSUPPLY ."., /. D.pr?PO~ed
/t///r _ /1//.#- ~/1 ~~/_ -p:;tEXJ.5t1ng
/~;;n~~<<:;::;?/...r~~~~ ~~ TELEFuvuo..JMBER__
4;;~7;7- ;2 oS~,,?,4 ~ / /' r-A./ ~0 ~d~
~~D~V;;AD@?E Oh-~~J 97?4;?/
{fa ."ehLJRAL ADDRESSING
, CHECKf:D O(;f 1 ~
I Lane County Authorization for:
7Li'w~ '.~ F;:.LJ/b/;z.c: 0'2706
TQW;-';SHlP tf I RANGE /? ~
/ (/(.
S~BDIVISION/PARTITION {if applicable}
e
~fci'IP"IS'
FOR OFFICE USE ONLY
Application/~~ /~~/
Perm~t i 'rl-..d-~ ) -cf b
SECC5: /f 133 fiJ210F
I LOT/PARCE!. I BLOCK
PROpOSED USE OF PROPERTY
o Residential D Industrial
o Commercial D Public.
3'ff--406--?
1d/77P2L-
I HAVE CAREFULLY EXAMINED THE COMPLETED APPLICATION FOR PERMIT, auel do hereby certify t".hat all information hereon is truo and correct, and that I
have the following legal interest in the property: Downer of record; 0 CtJntrdct- purchaser; ~thori~ed agent.
I f..:.rther certify that any and all work performed shall be done in accotdanc., '.d th th~ ordi~f Lane County and the Laws of the State of Oregon
pertAining to the work described herein, and that NO OCCUPANCY will be made of ar,y st.rllcture without the permission of the Building Division. I fur-
ther certify that registration with the Builder's Board is in full force clnd effect. as required by ORS 701.055, that if 'exempt the basis for exemption
~:~~~~~T~~;:: ;'0'''' who are in comM~;;l.055 will 00 ",ed on thi, prOiect';~j;;
P NAME {pi.... print} A SIGNATURE ' ~
READ THIS SECTION CAREFULLY. YOUR AUTHORIZATION ~AS BEEN BASED ON THE FOLLOWING CONDITIONS! ,_};'~
o PLANNING/ZONING: Zone ~fl- Partition' Parcel' Parcel Size %~~
Minimum Setbacks: CL, front CL, side _ interior rear
COM}'ENTS'.40' ~~~/':77'~ /"'~ ~p /?"/~/?
i/?//:/?'_':-./~ - Date, ~~~/,r-'/ ~
.... . / /
o SANITATION: S. I. It B. P. It Installation Record Issued? Dyes 0 No
:~::~?th
~s
Installation
Specifications:
Gallon
Tank
Lineal Feet
of Drainfleld
COMHENTS ;
Date:
,~
n
~LANS EXAMINATION:
COM>!ENTS, CA L L
Type -
Group
-
useL.... IS_
IoU ~PS'CT/OA I
1="0 R
RE:'C3:> U J I? I="D
Oal., JO-/~-1i3~ 4tP. D
PI k~ /0- IfA - 8 Co
PERMIT APPROVED BY BUILDING OFFICIAL/DESIGNEE leer ORS 456.805(1)) DATE
LANE COUNTY DEPARTMENT OF PUBLIC WORKS LAND MANAGEMENT DIVISION, 687-4061,
125 EAST 8TH AVENUE, EUGENE, OREGON 97401
SEE REVERSE FOR INSPECTION INFORMATION
r1J._ ~< ,,~~
-
e
," ~
.
'.
"
SETB,\CKS A~O OTHER CO:WITIO:~S OF APPROVAL ~mST BE STRICTLY OBSERVED. VIOLATIO~ CA~ RESULT IN REVQ-
CA';10:-J OF TillS PERmT, CITATIO:1 UNDER PRQVI5IO:1S OF LANE COliSTY''::; INFRACTION ORDINANCE, AND/OR OTHER
REMEDIES ALLOWED BY LAW.
..HEN READY FOR r:-;SPEC7ION, CALL 687-4065. A mNHlU:.l OF AT LEAST 24 HOURS AOVA::CE NOTICE POR INSPEC-
TIU:-': REQl,;t;;:,T::. MJ~T BI:: GIvEN. Have the tOllowing information ready: permit number, job address, type
of inspection, when it will be ready. your name and phon~ number, and any special directions to site.
BUILDING DIVISION:
REQUIRED INSPECTIONS:
1.
Foundation Inspection: To be made after trenches are excavated and forms erected and when all
materlalS lor tne toundation are delivered on the job. Where concrete from a central mixing
plant (commonly termed ~transit mixed~) is to be used, materials need not be on the job.
2.
Concrete Slab or Under-Floor Insyection: To be made after all in-slab or under-floor building
serVice equIpment, conoult, plplng accessories, and other ancillary equipment items are in
place but before any concrete is poured or floor sheathing installed, including the subfloor.
3.
~raminq , Insulation Inspections: To be made after the roof, all framing, fire blocking, and
raCing are in place ana all pipeS, fireplaces, chimneys, and vents are complete and all rough
electrical and plumbing are approved. All wall insulation and vapor barrier are in place:
Lath and/or Gvpsum Soard Ins-Fection: To be made after all lathing and gypsum board, ;.nterior
ana-eXICrTOr, is In-pIaCe put cetore any plastering is applied and before gypsum board joints
and fasteners are taped and finished.
..
s. Final Inspection: To be made after the building is complete and before occupancy.
APPROVAL REQUIRED. ~o work shall be done on any part of the building or structure beyond the point
indicated in each successive inspection without first obtaining the approval of the building official.
Such approval shall b6 given only after an inspection shall have been made of each successive step
in the construction as indicated by each of the inspections required.
NOTE: All building permits require inspections for the work authorized, such as but not limited to:
A. Slock wall: To be made after reinforcing is in place, but before any grout is poured. This
InSpection is required for each bond beam pour. There will be no approval until the plumbing
and electrical inspections have been made and approved.
S. ~~; To be made after completion of masonry (if applicable) and when installation is
complete. Installation shall be in accordance with an approved, nationally recognized testing
agency and the manufacturer's installation instructions.
C. Mobile HOme: An inspection is required after the mobile home is connected to an approved
sewer-or-5eptic system for setback requirements, blocking, footing connection, tiedowns,
skirting. and plumbing connections.
1. Footings and piers to comply with State foundation requirewents for mobile homes or 8S
recommended by the manufacturer. ,
2. Mobile home minimum finish floor elevation shall be certified when required by a flood-
plain management letter.
J. Nobile home tiedowns, when required, and skirting shall be installed and ready for inspec-
tion within at least 30 days after occupancy. Tiedowns and skirting shall be installed
per enclosure.
D. SW1mm~n3 Pool. Selow grade when steel is in place and before concrete is poured. Above grade
wnen pool-rs-1nstalled.
APPROVED PLANS MUST SE ON THE JOB SITE AT ALL TIMES DURING WORKING HOURS. THIS PERMIT WILL EXPIRE
IF WORK DOES NOT BEGIN WITHIN 160 DAYS, OR IF WORK IS SUSPENDED OR ABANDONED FOR MORE THAN 180 DAYS.
SUSPENSION OR REVOCATION 11AY OCCUR IF THIS PERMIT WAS ISSUED ON THE BASIS OF INCOMPLETE OR ERRONEOUS
INFORMATION.
ANYONE PROCEEDING PAST THE POIl:T or REQUIRED INSPECTIONS WILL DO SO. AT THEIR OWN RISK.
SUBSURFACE ~ ALTERNATIVE ~ DISPOSAL ~,
1. Permits shall be effective for one year from the date of issuance.
2. Upon completing the construction for which a permit has been issued, the permit holder shall
notify the Lane County Department of Planning and Community Development by submitting the
installation record form. The Department shall inspect the construction to determine if it
complies with the rules contained in this division. If the construction does comply with such
.. ..rules, the Department shall 1ssue a cert1f1cate of satisfactory complet10n to the permlti holder.
If'the construct1on docs not comply With such rules, the Department shall notify the permit
, h~lder and shall require satisfactory completion before issuing the certificate. F.Jilure to
/, ~eet the requirements for satisfactory completion within a reason,]ble time constitutes a vio-
,';.l":tion of ORS 454.605 to 454.745 and this rule.
Setback~ - Subsurface S~waqc Disposal
Septic Tank
Drainfield
From: Interior property lines
Edge 0: road riGht-of-way
Suildinq.foundation
~clls. other ~,]ter sources
10'
10'
;'
;0'
10'
10'
10'
lOa'
1~