Loading...
HomeMy WebLinkAboutPermit Miscellaneous 1992-5-26 1-- 1-. . - ,_ TC"DRC MEMBERS: RE,OF, PRE-APPl,JCATION ~ 1~#92-o5-95 SCHAuDT .., . - .' :.K.'....... . ....-i<4i"'.<i'.,~.~'" .. ,~ ~~~i~ . r DEVELOPMENT SERVICES PUBLIC WORKS METROPOLITAN WASTEWATER MANAGEMENT CITY OF SPRINGFIELD DEVELOPMENT SERVICES 225 FIFTH STREET SPRINGFIELD. OR 97477 (503) 726-3753 ./Jdd f'e-S5, Fi (-e... G,-.,oy DEPARTMENT ~ -0 \J DATE OF LETTER . 3~~~- ,~.,;;I"". . ";--''f. . "t" ~~"'71'''''O . v May 26, 1992 APPLICANT Gene Schaudt Kenneth Schaudt Schaudt, Schaudt, Stemm and wild 388 High Street Eugene, Or. 97401 PROPERTY OWNER ~ Malcolm and Barbara Bosisto 1484 Cheek street Springfield, Oregon 97477 SUBJECT city Journal Number 92-05-95. Summary of issues presented at a pre-application conference, conducted May 21, 1992, to discuss the proposal of expanding Empire Concrete Cutting for additional warehouse and office space. The property is located on the northwest corner of Kathryn Street and Olympic Street, . south of I- 105 (Assessor's Map 17-02-30; Tax Lot 2101). The property is zoned Heavy Industrial; the Metropolitan Plan Designation is Heavy Industrial. The property is developed with a 5760 square foot building. PISCUSSION 1. The existing building was constructed in 1975, The property lacks improvements currently required by the Springfield Development Code (SDC); including landscaping, street trees and paved parking, The proposed addition is 6252.5 square feet. Section 31. 020 of the SDC states that expansions of industrial buildings exceeding 50 percent of the existing structure require Site Plan Review. Since the proposed addition is over 50 percent larger than the existing structure, Site Plan Review is required for this proposal. The fee is currently $235. Effective June 5, the fee will be $410. . . .,.: ~ 1~t Page 2 I. Transportation Issues. Improvement Agreements are required for both Olympic and Kathryn streets, Olympic is scheduled for road improvements in 1992-1993. The Engineering Department is requesting a 35' dedication of right-of-way from the centerline of Olympic, and a 25' dedication along both Kathryn and Olympic for vision clearance purposes. 2. Public Facilities and Improvements, a. The electric meter currently located on the west side of the building needs to be relocated with Springfield utility Board (SUB) approval. Arrangements will also need to be made with SUB for new underground service, b, Systems Development Charge: the estimated cost is $2730, The applicant needs to submit a drainage plan because the cost may vary depending on whether drainage is run into a roadside ditch or if drainage is eliminated on-site. c, Street lights: the existing light at 39th and Kathryn needs to be upgraded from 55 watt LPS to 135 watt with a 12' nast arm. c, All parking areas require paved surfaces. Parking spaces adj acent to the building require wheel stops, The handicapped space requires a 9 foot car lane, 8 foot aisle and appropriate signage, Bike racks and planted areas are also required. 3. Fire and Life Safety. a. The required fire flow is 3000 GPM (based on 12,000 square foot type V-N construction). b, One additional fire hydrant is required near the east parking lot entrance, 4, The site Plan application must include the information required for review, including landscaping, improvements, and parking plans. The landscaping plan includes street trees planted at 30' intervals on center, planted setbacks (10' for building areas, 5' for roads), and provisions for irrigation and maintenance, The improvements plan should demonstrate compliance with SDC requirements for public and private improvements. The applicants were given a copy of Article 31 (Site Plan Review) and Article 32 (Public and Private Improvements) at the Pre-application conference. """:""1' .,-, ,'. . . e Page 3 ACTION No formal action was taken, this meeting was held to provide the applicant with information prior to submitting a formal site Plan Application. These items discussed may not include all issues which may be reviewed as part of the actual application. QUESTIONS Please call the Development Services Department at 726-3775 if you have questions regarding this process, ~PREPARED BY ..UA.-{.1(._ Lauren Lezell Assistant Planner Copy to: DRC Members