Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2003-10-17 " ," -a pnginppring K & A Engineering, Inc. P.O, Box 23624, Eugene, OR 97402 521 Market St., Suite B, Eugene, OR 97402 (541) 684-9399 Voice (541) 684-9358 FAX October 17, 2003 Project: 134.03 Stapleton Timber and Excavation 38141 Place Road Fall Creek, OR 97438 Subject: Inspection of Foundation Soil Preparation 458 So. 72"d St. Springfield, OR As requested, K & A Engineering, Inc. has inspected the preparation of the foundation soils for the construction of a foundation for a single-family residence. This inspection was made pursuant to our recommendations dated October 10, 2003. The foundation soils at the site were prepared in accordance with our recommendations and consisted of excavation of the foundation area to undisturbed weathered tuff. The finished excavation was in two benches. Cuts ranged from 3-feet along the north bench to 5 to 7 -feet along the north edge of the foundation area. A large deposit of soft, saturated, highly plastic tan clay was removed from the middle 1/3 of the excavation. Groundwater was not encountered. 1 to 6-feet of 3-inch open-graded quarry stone was placed in the excavation in layers not exceeding 12-inches and seated with the hydrauliC excavator bucket. Approximately 6 to 12-inches of %-inch minus dense-graded crushed aggregate was placed on top of the quarry stone and compacted. Our field-testing of the aggregate after compaction indicates that the dry density exceeds 95% of maximum as detennined by ASTM D698. The foundation soils, as prepared, are suitable to support the proposed foundation and intended foundation loads. We recommend acceptance of the site, as prepared, by the Springfield building official. Thank you for the opportunity to be of service. Please call us if you have questions or need further assistance. Respectfully, .-F: ~........ ,., 1'--. "-.J L.,-< . 'v w-~ - Michael Remboldt, P.E. Principle, K & A Engineering, Inc. EXPIRES I ~/~ i )-.eo/.- In-Pia, 4nslty 458 So 72nd St Springfield, OR .' In-Place Density Moisture Content Initial Final Wet MOist Dry Moisture Dry Reading, Reading, Volume, Weight, Density, Sample + Sample + Content, Density, Test No, cf cf. ct Weigjtt, g lb. pcf Pan,g Pan,g Pan, g. % pct % Compaction 1 0.0089 0.0248 0.01590 1037.7 2.26 142.4 100.7 438.2 420.3 5.6% 134 104% 2 0.0088 0.0292 0.02040 1341.2 2.93 143.8 99.9 447.2 413.0 10.9% 128 99% 3 0.0088 0.0252 0.01640 1177.4 2.57 156.9 104.1 442,0 411.1 10.1% 141 109% ASTM 0698 for 3/4-in. minus 129.0 pef Average 8.9% 104% (Spgfld.quarry) Std. Dev, 2.9% 5.0% Chent: Stapleton Timber and Excavation Project: 134.03 K & A EngIneering, Ine, October 15, 2003