HomeMy WebLinkAboutPermit Field Test & Inspection Report 2002-11-18 FRm1 : '. -I _ FAX NO. Nov. 18 2002 12:35Pt1 P2 "J ~- MORTIER ENGINEERING, EC. STRUCTURAL BUILDING DESIGN . FIRE PROTECTION CODE CONSULTANT · PlAN CHECKING CONSTRUCTlON INSPECTlON 1245 PCAHI STREET EUG[NE OREGON !l7401 PHONE (541) 484.9080. FAX (541) 484-6059 TOLL FRtoE IN OREGON 1-877-661-9959 November 18, 2002 Shallum & Melissa Bivens 2931 ElmIra Rd. Eugene, OR 97402 RE 871 S 72nd St. - Site SOlls/Compactlon Investigation. W.O.#14926-ARC - B.P.#2002-01-209 As you requested, a site soils investigation was performed at the above noted address on November 2, 2002. Design for the site IS as follows All fill, vegetation, and unbuildable matenal has been removed to natiVe grade. At the upper bench the surface SOil IS a Silty clay loam with a UnifIed Soils Classification of Ml-CL and a plastICity index less than 15 A stnp of clay SOil with a Unified Salls Classification of CL and a plasticity index greater than 20 IS approximately 24" below grade. The SOil IS hIghly expansIve. A minimum 12" of undisturbed sOil IS to be left over the clay strrp to moderate the effect of the expansive soils at the proposed bUIlding site. At the middle and lower bench the native soil IS a gravelly clay loam with a Unified SOils ClasSIfIcation of GC and a plasticity index less than 15. Crushed rock is to be placed in 6" lifts to bring the site up to deSired finished grade. The crushed rock should be placed and then compacted Wlt~ either a VIbratory plate or roller. Drainage shall be installed at the perimeter footings to help maintaIn optimum soil moisture at the sIte. With the undisturbed soil and the placement of the crushed rock, combined with the excavation that is of adequate depth and width, the site as prepared IS adequate to aSSure a stable mOisture content for the proposed foundation. On November 4, 2002 a site and compaction Inspection was performed after fill placement at the t middle and lower benches. The excavation meets the reqUIrements as speCIfied in thiS letter The compacted surface of the crushed rock IS adequate to support a conventIonal wood framed residence With a standard foundation per the 2000 State of Oregon One and Two Family Dwelling SpecIalty Code as adopted per the local junsdiction. The compaction of the gravel surface is greater than 95% of a standard proctor, per ASTM 0698-91_ Thank you for thIS opportunity to be of service, The enclosed BUIlding Analysis Report and Statement of Conditions and Limitations IS a part ofthis report. If you have questions regarding this report, please contact me at 484-9080. Sincerely, Pamela S. Hillstrom, P E. PJ!!lft:=: ~. CorMIIIIng. 'IMUng FIELD DENSITY REPORT SOIL AND SOIL-AGGREGATE 1040 - A Shelley Street Spnngfleld, Oregon 97477 (541)746-9649 - (541)746-7163 fax Client: Mr Larry Smith Address: Smith Home BUIlders 88163 Chlta Loop Springfield, OR 97478 Project No.: ProJect: Project Location: Equipment: 722-20365-1 Reese Residence 867 South 68th Street Springfield, Oregon Troxler: 3430 SN: 30203 Date Performed: P.O. No.: B.P. No.: Technician: November 7,2002 Jeff Green Laboratory Soil / Aggregate Data MOisture Density Relationship of 142.0 Ibs Icu ft , at 10 % mOisture, was furnished by client .~f!!r!.".C?~'!.~itl'( !e.s~~.~. ':!.~c~~ar ",!et~?~ (~.~!~..1?~~~2~(~S!~ o.~O.1!'l~~~'.'.'!a.~cJ. ~o~.'!.~:..~~..... .. D.~ ..) ...... .... ._. ".,,, .."..........._.."..._...._......_..."" .._...,.._,.....~....___ ; Test No. Approximate Test Location Approximate Test Elev. Probe Wet Density Dry Density Depth LBS/CU FT LBS/CU FT. Percent Percent Required Moisture Compaction Compaction Comments " .". 2 3 Garge Section 15' Northeast of Southwest Corner 12" Southwest of Northeast Corner FRG FRG FRG 10" 8" 1475 1423 1474 1426 1385 1427 35 28 33 100+ 8" 97.5 100+ 95 95 95 T~sts-performed 'at fj~'lshed grade ot"flll ~ate'naiat'the -iocai,o;:;~'iJs'tecj'ab'~'~~" ...._...........n_ ...""..... ...... ... ... ..---....-..... "'"'''''''' ....... ~ ..,......".-.. .- Test results were verbally reported to Larry ~ c City of Spnngfleld Respectfully Submitted ProfeSSional Service Industnes, Inc rtaIyJ L!01Jffi Raymond V Allpertl Department Manager THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED WITHOUT THE WRITTEN , PERMISSION OF PROFESSIO' <;ERVICE INDUSTRIES FROM FAX NO. Nov. 19 2002 10:02AM P2 MORTIER ENGINEERING, EC. .. ..' 12d'i PEARL STREFf CUG!:NE OREGON 97401 PHONE (541) 464-9080' FAX (541) 484-6859 TOLL FREE IN OREGON 1-877-661-9959 STRUCTURAL BUILDING DESIGN · FIRE PROTECTION COOE CONSULTANT. PLAN CHECKING CONSTRUCTION INSPECTION November 18, 2002 ShaIlum & Melissa Bivens 2931 Elmira Rd Eugene, OR 97402 RE 871 S nnd St" _ Site SOils/compaction Investigation - W O.#14926-ARC - B.P #2002-01-209 As you requested. a Site soils investigation was performed at the above noted address on November 2, 2002. Design for the sIte is as follows' All fill, vegetation, and unbUlldable matenal has been removed to native grade At the upper bench the surface Sallis a silty clay loam with a Unified Soils Classification of ML-CL and a plasticity index less than 15 A strip of clay SOil With a Unified SOils Classification of CL and a plasticity Index greater than 20 IS approXimately 24" below grade. The soil IS highly expansive A minimum 12" of undisturbed soil IS to be left over the clay stnp to moderate the effect of the expansive soils at the proposed building site. At the mIddle and lower bench the native soil is a gravelly clay loam With a UnIfied Salls ClassIfication of GC and a plasticity index less than 15. Crushed rock is to be placed in 6" lifts to bring the site up to deSired finished grade. The crushed rock should be placed and then compacted With either a vibratory plate or roller Drainage shall be installed at the penmeterfoOtlngs to help maintain optimum soil moisture at the site. With the undisturbed soil and the placement of the crushed rock, combined with the excavation that IS of adequate depth and Width, the site as prepared IS adequate to assure a stable mOisture content for the proposed foundation. On November 4, 2002 a site and compaction inspection waS performed after nil placement at the . mIddle and lower benches The excavation meets the reqUirements as specified In this letter The compacted surface of the crushed rock IS adequate to support a conventional wood framed residence With a standard foundation per the 2000 State of Oregon One and Two Family Dwelhng SpeCialty Code as adopted per the local Jurisdiction The compaction of the gravel surface is greater than 95% of a standard proctor, per ASTM 0698-91. Thank you for this opportunity to be of service The enclosed Building Analysis Report and Statement of ConditIOns and Limitations is a part of this report. If you have questions regardmg this report, please contact me at 484-9080. Sincerely, Pamela S_ Hillstrom, P E