HomeMy WebLinkAboutPermit Field Test & Inspection Report 2002-5-23
U~/'~/U' ~~.~v rftA a~~/~O(~OJ
1.'0:>1 o:>nUl';l:rr 1~LJJ
IlfI UU~/UU~
-'
.j
". ~
tft~:lInfonnation
~..,. .To Build On
Engineering · Consulting .. Testing SPECIAL INSPECTION
FINAL SUMMARY REPORT
May 23, 2002
Report No.. 722-20054-23
,
\
~.
Mr Tm1 Sprouse. '
Cross Lands ConstructIOn
8955 S Rldgelme Blvd., SUite 1500
Highlands Ranch, CO 80126
Re; Applebee's #1075
Gateway Mall
Sprillgtiel~ Oregon
Dear Mr Sprouse
This IS to certtfy that m accordance WIth Chapter 17 of the UnIform BUIldmg Code and deSIgn
reqUlrements, we have performed SpecIal InspectIon at the above referenced proJect on the followmg
items
] . Remforcmg Steel, Anchor Bolts
2 Reinforced Concrete
3 Structural Weldmg
4 Nmling
5 Shear Walls
6 Structural Masonry Bond Beams
InspectIons and tests were performed and reported accordmg to the requuements of Chapter 17 and as
directed by our chent To the best'of our knowledge, the work mspected was performed m accordance
with the approved plans, speCificatIons, reVISIOns, applIcable workmanslup proVISIons of State BUlldmg
Code and Standards and Uniform BUIlding Code.
Note Our firm also periVliued m-place nuclear densIty tests on crushed aggregate backfill. For
speCIfic detaIls I egarding our mspectton and testmg serVICes, please reference our preViously
submItted reports.
Re~pectfu lly submItted,
~iJ1~
Department Manager
\ C
CIty of Spnngfield
\.
ProfeSSIonal Servlce,lndustries. Inc. .104OA Shelley St . Spnngfield, OR 97477' Phone 5411746.96M}. Fax 5411746-7163
l.!~;l Information
~~. .To Build On
Engineering. Consulting. Testing SPECIAL INSPECTION
FINAL SUMMARY REPORT
May 23,2002
Report No 722-20054-23
Mr Tim Sprouse.
Cross Lll1ds ConstmctIOn
8955 S Rldgehne Blvd, SUIte 1500
Fhghlands Ranch, CO 80126
Re: Applebee's #1075
Gateway Mall
Springfield, Oregon
Dear Mr Sprouse
TIllS IS to certIfY that m accordance WIth Chapter 17 of the Umform BUIldmg Code and design
reqUIrements, we have performed SpeCial InspectIOn at the above referenced project on the followmg
Items
1 Remforcmg Steel, Anchor Bolts
2 Remforced Concrete
3 Structural Weldmg
4 Nmlmg
5 Shear Walls
6 Structural Masonry Bond Beams
InspectIOns and tests were performed and reported accordmg to the reqUIrements of Chapter 17 and as
dIrected by our chent To the best of our knowledge, the work mspected was performed m accordance
With the approved plans, speCIficatIOns, reVISIOns, apphcable workmanship prOVISIOns of State BUIldmg
Code and Standards and Umform Bmldmg Code
Note Our fm11 also performed m-place nuclear densIty tests on cmshed aggregate backfill For
~peclflc detalls regardmg our mspectIOn and testmg services, please reference our prevIOusly
"ubmltted reports.
Respectfully submitted,
f\ 'J{ l ) f7'l~
J {jtt. ! )J{L
Raym lei V AlIpe 1
Department Manager
C City of SpnngfIeld
ProfeSSional Service Industries, Inc. 1040A Shelley St . Spnngfleld, OR 97477. Phone 5411746.9649. Fax 541/746-7163
u~/~q/u~ lq:~~ ~AA ~qlJqnJln3
t''jl :;t'KIN~l"lhLU
~ 0021002
(i
..,
..
l...!t;llr!formation
~~. .To Build On
Engineering · Consulting · Te..~: d:J1SPECIAL INSPECTION
FINAL SUMMARY REPORT
May 23, 2002
Report No.: 722-20054-23
~\
"
Mr Tim Sprouse. '.
Cross Lands Construction
8955 S. Rldgeline Blvd, SUIte 1500
Highlands Ranch, CO 80126
Re: Applebee's #1075
Gateway Mall
SJ}ringlield, Oregon
Dear Mr Sprouse.
ThiS] S to certIfy that m accordance Wlth Chapter 17 of the Umform Bwldmg Code and deSIgn
reqmrements, we have performed SpecIal Inspectlon at the above referenced project on the followmg
Items
1 Rc:mforcmg Steel, Anchor Bolts
2 Remforced Concrete
3 Structural Weldmg
4 Nalhng
lnspecho~s and tests were performed and reported according to the requrrements of Chapter 17 and as
directed by our chent To the best of our Imowledge, the work mspected was performed m accordance
With the approved plans, specificatIons, reVISIOns, applIcable workmanshIp prOVISIons of State BUIlding
Code and Standards and Umfonn BUIldmg Code.
Note: Our tirm also performed m~place nuclear denSIty tests on crushed aggregate backfill For
specIfic detaIls regardmg our InSpectIon and testmg ServIces, please reference our prevIOusly
submitted reports
Respecttully submltted,
~J \Jr10,p
Raymon~;. Al~:1 '
Depaltl11ent Manager
C ('Ity ofSprmgfield
ProfeSSional ServICe Industnes, Ine .1040A Shelley 51 . Spnngfield, OR 97477. Phone 5411746.9649. Fax 541/746-7163
l.~~;l Information
~.,. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed:
May 20,2002
\
Report Number:
722-20054-21
Client:
Mr Tim Sprouse
Crosslands Construction
8955 S Rldgeline Blvd, SUite 1500
Highlands Ranch, CO 80126
Project Name:
. Applebee's #1075
Gateway Mall
Springfield, Oregon
Project Location:
P.O. No.:
Type of Inspection:
F abricator/Erector:
Contractor:
1075-2/19038
Welding Inspection
Phillips & Koch
Crosslands Construction
Field Observations and Comments
Permit No.:
Weather:
Shop or Field:
Cloudy
Field
Performed periodiC visual inspection of the following Items .puddle welds and side lap screws to roof decking per S-2 1
of the John Sharp Architects approved draWings located service yard are roof Weldments were Inspected for Size,
length, profile and locations To the best of our knowledge, the work Inspected IS In conformance with approved
draWings, specifications and applicable AWS 01 1 (statIc) codes Fabncator was asked to notIfy our office when
additional services are needed
Inspector: Chris Thomason, ICBO# 5069949-85
If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649
Doug G Vertrees
Structural Steel Field Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT. BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
.-,:'.l~',', ;:',' ;,: ~".' ;",;::'r.. .,-":;, c.~';:'~r ~ IIV rvt..L, HI' nvu I I nc vrr'ill t '=11/ r-c:rtIVlI".:J/UIV ur ,..t"iUrci:J~/UIVAL ;:'cKVI{.;l= INUU::i I Hlt:::;, I:::;
~HUHIJ:jJ I ED
Professional Service Industnes, Inc' 1040A Shelley St . Spnngfleld, OR 97477' Phone 5411746.9649' Fax 5411746.7163
l- ~~;l Information
~~. .To Build On
Engineering. Consulting · Testing
DAILY FIELD REPORT
Date Performed
,Ma~ 17, 2002
Mr Tim Sprouse
Cross lands Construction
8955 S Rldgellne Blvd, SUIte 1500
Highlands Ranch, CO 80126
Report Number:
722-20054-19
Applebee's #1075
Gateway Mall
Springfield, Oregon
Client
Project Name:
Project Location:
PO No'
Type of Inspection:
Fabricator/Erector:
, Contractor
1075-2/19038
Welding
Cross lands Construction
Cross lands Construction
Field Observations and Comments
Permit No.'
Weather:
Shop or Field:
Light Rain
Shop
Performed periodic visual Inspection of the follOWing Items staging/receiving area roof support to column and
embeddments Weldments were Inspected for Size, length, profile and locations To the best of our knowledge, the
work Inspected IS In conformance wIth approved draWings, speCIfIcatIons and applicable AWS 01 1 (static) codes
Inspector Dave Smith, ICBO# 0877340-85
If you have any questions regarding this report, please feel free to contact us at 541-746-9649
~~tfUIlY Submitted,
~/onal S: Vice Industl/es, Inc
Doug G Vertrees
Structural Steel Field Supervisor
'\
THIS REPORTlS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TOA THIRD
PARTY BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
,
ProfeSSional Service Industries, Inc .1040A Shelley St . Springfield, OR 97477. Phone 5411746.9649. Fax 5411746.7163
l n~ -I lriformation
~.,. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed
May 14, 2002
Report Number:
722-20054-20
Applebee's #1075
Gateway Mall
Spnngfleld, Oregon
Client
Mr\Tlm Sprouse
Crosslands Construction
8955 S Rldgellne Blvd, SUite 1500
Highlands Ranch, CO 80126
Project Name:
PrOject Location:
PO No
Type of Inspection:
1075-2/19038
Reinforcing Steel
Permit No.'
Weather:
Overcast
Field Observations and Comments
Performed visual Inspection of reinforcing steel In the follOWing locations service yard and outside storage-slab, footings
and grade beams Reinforcing steel and column anchor bolts were checked for grade, Size, lap, placement and
clearances where applicable Reinforcing steel was secured uSing tie wire and supported on concrete doble blocks.
Reinforcing steel was placed In accordance with approved deSign draWings and specifications Contractor Indicated that
anchor bolts, for north wall of outside storage, would be wet set at time of concrete placement To the best of our
knowledge, the work Inspected above was in accordance with the bUilding department approved deSign draWings,
specIfications and applicable workmanship provIsions of the Uniform BUilding Code
Inspector. Don Thornton, ICBO# 1035237-88
you have any questions regarding this report, please feel free to contact us at 541-746-9649
Respectfully SubmItted,
ProfeSSIOnal Se/Vlce Industries, fne
I~CLJ Vl9J~
Raymond V AllPerl
Department Manager
c City of Spnngfleld
TI-IIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES IS PROHIBITED
Professional Service Industnes, Inc' 1040A Shelley St . Spnngfleld, OR 97477' Phone 5411746-9649' Fax 5411746-7163
- ^
l."~.' Information
~~. .To Build On
Engineering. Consulting · Testing
DAILY FIELD REPORT
Date Performed:
May 20,2002
Mr \Tlm Sprouse
Crosslands Construction
8955 S Rldgehne Blvd, SUite 1500
Highlands Ranch, CO 80126
Report Number:
722-20054-22
Applebee's #1075
Gateway Mall
Springfield, Or,egon
Chent:
Project Name:
Project Location:
P.O. No.:
Type of Inspection:
1075-2/19038
Rebar
'PermIt No.:
Weather:
Overcast
Field Observations and Comments
Observed 2 #5 at top of 8" CMU wall for commons/trash enclosure area Grout will be place at a later time To the best
of our knowledge, the work Inspected above was in accordance with the bUilding department approved design drawings,
specifications and applicable workmanship provisions of the Uniform BUilding Code Contractor was asked to notify our
office when additional services are needed
Inspector: David Smtih, ICBO# 0877340-84
If you have any questions regarding this report, please feel free to contact us at 541-746-9649
qespectfully Submitted,
)rofesslonal Service Industnes, Inc
P'<Y \) /:01fJ
Raymond V Ahpertl
Department Manager
f
,)
c City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOO, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. IS PROHIBITED
Professional Service Industnes, Inc. 1040A Shelley St . SpringfIeld, OR 97477. Phone 5411746-9649. Fax 5411746-7163