Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2000-4-20 MORTIER ENGINEERING, EC. . . . STRUCTURAL BUILDING DESIGN · FIRE PROTECTION CODE CONSULTANT. PLAN CHECKING CONSTRUCTION INSPECTION 15 PEARL STREET eUGENE, OREGON 97401 PHONE (541) 484-9080. FAX (541) 484-6859 TOLL FREE IN OREGON 1-877-661-9959 April 20, 2000 Kevin Jones 6856 Holly Street Springfield, OR 97478 RE: 6840 Iw. Sonnafield. OR - Compaction Test - W.O.# 12673-RDR As you requested, a compaction inspection of the gravel under the proposed foundation has been performed on this site in preparation for the construction involving foundations for the proposed residence. The excavation Involved the placement of 12" maximum of 1 W' crushed rock. The -, ---- ---, compacted surface of the crushed rock is adequate for a foundation beanng capacity o@qg_F_~f. _/)\,Q-'~I,,!y.,~; \, The compaction of the gravel surface IS greater than 95% of a standard proctor, per ASTM D698- 91. A trench drain was Installed at the upper portion of the site, extending north along the east side of the excavation. This drain IS to be connected to the City of Springfield's storm system and the north west corner of the site. This drain is Installed below the base of excavation and will adequately drain the gravel pad and crawl space. An underfooting drain at the crawl area WIll not be necessary in this Instance. I hope you find this report adequate for your purposes at thiS time. Thank you for this opportunity to be of service. Please contact me If you have further questions. Very truly yours, ""","",ml