Loading...
HomeMy WebLinkAboutComments SUB 7/13/2005 '(..IF ,v .. :~ " " [' I~ r '" l, [ I L , [\ \ I' I I I '\ I, \ \ \ i) 1, \\ \ I I L "I L :',,' 1,202 South 18th Street Springfield, OR 97477-5240 1,15417262396 Fax 5417477348 WWW Sllhlllll rom July 13, 2005 ~~@~DW~-; JUL 1 3 200S - ~ .sUB f)RL___CtJ~;. .By e$I- -loy IIJD~ J - c::~ ~ .r0-13 -o4:~:2) Sarah Summers CIty of Spnngfield 225 N 5th Street Spnngfield, OR 97477 Dear Sarah: SUBJECT DEVELOPMENT ISSUES MTG #ZON2005-00028 MARTIN/PIERCE 17-02-30-00 TL 1800 AND 17-03-25-11 TL 2300 NORTH OF MARCOLA RD, WEST OF 31 Sf STREET LIsted below are our comments for the above referenced development proposal 1 The proposed development IS wlthm the Spnngfield CIty lImIts and Will receIve water servIce from the Spnngfield UtIlIty Board (SUB) 2 All new water system facIlItIes and modIficatIOns to water system facIlItIes both mSlde and adjacent to the proposed development shall be placed m street nght-of-way at a locatIOn and depth of bury that meets the standards of the SUB Water DIVIsIOn 3 All water facIlIty matenals shall be to a standard that must meet SUB Water DIVIsIOn speCIficatIons 4 All workmanshIp shall be performed to meet or exceed SUB Water DIVIsIOn constructIOn standards 5 SIZe of waterlIne and other facIlItIes, mcludmg water meters, must meet the needs of the SUB VVdLer DIVISlOll and the long-ldnge needs of the City These needs mclude, but are not lImited to, meter locatIOn and access, SIzes of water dlstnbutlOn and transmISSIOn lInes, pumpmg facIlItIes, and commumcatIOn lInes 6 Please ask the developer to contact the SUB Water DIVIsIOn for detaIled mformatIOn on the matenals and constructIOn standards, detaIled costs for mstallIng SUB water facIlItIes, and a schedule of constructIOn ConstructIon expenses may be reduced wIth good planmng of reqUIred water faCIlItIes, good tlmmg of facIlItIes mstallatIOn, and Jomt trench opportumtIes 7 All water meters wIll be placed m publIc nght-of-way at a locatIOn IdentIfied by the developer Each lot or parcel must have ItS own water servIce 8 Water servIce faCIlItIes wIll be mstalled upon collectIon of development charges Development polIcIes and charges IdentIfied m thIS letter are subject to change Actual charges wIll be those m effect at the tIme water serVIce IS requested SIte Plan #ZON2005-00028 N of Marcola Rd, West of 31 st Street July 13, 2005 Page 2 of2 9 Spnngfield has several wellhead protectIOn areas One hundred percent of Spnngfield's dnnkmg water comes from wells In every mstance, care shall be taken to prevent groundwater contammatlOn Contractors/developers/owners shall be responsIble for the safe handlIng and storage of chemIcals, petroleum products, fertIlIzers, and the preventIOn of groundwater and storm water runoff contammatlOn SpecIal reqUIrements wIll be necessary for groundwater protectIOn at thIS development. Contact Nancy Moreno at Spnngfield UtIlIty Board Water DIVISIOn for detaIls at 726-2396 PLEASE NOTE: SUB development charges are paid dIrectly to SUB Water DIVISIon and SUB ElectrIc DIVISIon Smcerely, :E~ c. file ~ /~ Bart E McKee P E Engmeer - Water DIVISIOn BEM:mkm ~~@~DW~~ JUL 1 3 2008 J cc Bob Martm, PO Box 1482, Albany, OR 97321 By \\svr-data\wscengnr\SITEPLAN\PIerce Property Development Issues 7-12-05 doc