Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2002-8-1 ^ ..T.... \ t,. ~... fUll-V. - ,IL ,r:v )~ Lt ~\ 2~f;\S_: :~~':l';~Ehl~\G 7AX 54~ '45 .'" I" - \ I .h. , .. ~ ('.... 1 ~h\J~ ~ -,., I" Post.it~ F-ax Note 76;1 TI'/ j/'Owt1-J.<; /2kvoy' Co lCept ~.,.: ~ Pllone -/ DElte fl!/rJZ Ip~~b. Z- f'r()rl\ ~Oc- /hZ. Co FOlK /I -:;-1)., 3113 PMnc l! 9'$f ~>FI Fax ~ August 1,2002 Hov,.-ard Thompson Soft Tech BUIlding Systems 1655 3200 Street Springfield, OR 97478 RE: Compaction tet(t for lot at 6833 Jessica Drive, Springfield City project number Ot-00345-01 . On July 25, 2002 the placement of fill, compacnon, and proof.roning at the above r..:ferenced project was witnessed by Rick Hemandez, PE Please note the followmg observations. 1. The fill was being placed to accommodate the resldentlai construction as per the above referenced project. 2. The fill consisted of well graded 3/4-(0) angular gravel placed and compacted m 6 Inch lifts. Compaction was accomplished with a vibratory 2700 kg roller 3. A total of four (4) six Inch hfts were placed under the malll portion of the proposed residence, and a total of two (2) lifts under the garage area 4 A proof roll was performed at the mam portion of the proposed residence after placement of the thlrd six inch !Jft. The proof roll was accomplished with a fully loaded dump truck over approximately one half of tbe compacted area S. Observed deflections under the truck wheels were less than 1/4" and as such, would correspond to an aUowablc soil bearing value of 1500 psf Should you have any questlOns regarding this c.ompaction, please don't hesitate to call me at (541)9548549. Smccrdy, Rick Hcmandez, PF ,~-- ---, f EXPIRES "/!4/a?3 J