DAilY FIELD REPORT
Date Performed: August7,2000 Report Number: 722-00353-1
Client: Wade Holaday Project Name: Holaday Residence
1137 South 45th Street
Springfield, OR 97477 Project Location: 1137 South 45th Street
Springfield, Oregon
P.O. No.: Permit No.: 00-00421-00
Type of Inspection: Epoxy Anchors Weather: Clear
Field Observations and Comments
Performed continuous Inspection dUring the installation of 3/4" all thread epoxy anchored bolts In the following locations.
Foundation/shear wall connection SIX (6) total (detail SW 106) Prior to installation the predrllled holes were cleaned by
nylon brush and compressed air Verified minimum embeddment depth of 5 Inches The above listed epo?,y anchors
were Installed uSing Simpson Epoxy E T. In accordance with the manufacturer's directions Contractor stated the nuts
would betlghtened after epoxy has cured The epoxy anchors were Installed In accordance with approved jobslte plans
and specifications Contractor was asked to notify our office when additional services are needed
( \spector: David Smith, ICBO# 0877340-84
If you have any questions regarding this report, please feel free to contact us at 541-746-9649
Respectfully Submitted,
ProfessIOnal ServIce Industnes, Inc
--~R \{. D~'G-X)Qjclt
Raymond V Allpertl, Dep~rtment Manager
Springfield Branch
c City of Springfield
,
..,
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT. BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
Prof~ss,oria1~1Jvfcie AfnM~l~~~; rn1F.;~b'4"df~~{l~g~~ W~n~~/;kla~6~'lW~1lf~ fJ~tleog9m2~1i6~~R..vfa~ IgS.f1;%w.~ ~~ PROHIBITED