Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2000-6-27 oeoma~ June 27, 2000 PROFESSIONAL ENGINEERS LAND SURVEYORS BUILDING DESIGNERS 806 N NINTH STREET COTTAGE GROVE OREGON 97424 TELEPHONE (541) 942-0126 FAX (541) 942-7935 CIty of Springfield BUilding Official 225 5th St SprIngfield, OR 97477 Re Special inspectIOn, hold down bolt placement BP # 00-00869-01, Bud Crabtree, 974 S 59th St SprIngfield, OR Date of inspection 6-21-00 Time 7 30 a m Weather Clear, 650 I observed the placement of hold down bolts In an existing foundation for braced panels at the sides of the garage door 5/8" threaded rod was set In 3/4" <l> holes dnlled to a depth of 10" in the eXisting 6" wide concrete foundation wall at the above referenced site The holes were cleaned with a bristle brush and excess debrIs blown out with dry compressed air Minimum end wall setback is 5", minimum side setback IS ] 3/4" Foundation wall thickness IS 6" The bolts were placed using Simpson SET high strength epoxy mixed according to the manufacturers instructions The Simpson manual for Wood Construction Connectors ( Catalog C-2000) states that bolts set In this manner will have an allowable tension load of7665 Ib @ 133% Allowable load for Simpson P AHD2 shown on approved plan IS 3610 11> The bolts meet or exceed desIgn load reqUirements RIchard L ChrIstIan PrIncipal Designer I hereby certify that this work was performed by me or under my direct supervision // / -~~ / '\ - \ . .L.~)'~D'", -\ ~..(.~ A~'71 C~' :,J1 /6;';1J/~ \ (/" \. / h, ,,' Sincerely, Geomax, Inc Z~;W L clv~ ~,/ RIc D IDoculllcnbll'rolccL,120001.\077"'pCUdlllhP "'I'd E;:~ p~: \?/-:Ol/~?