Loading...
HomeMy WebLinkAboutPermit Building 2000-2-25 " ~ 225 North Fifth Street Springfield, OR 97477 . . ; I Job# 99~1681~1 Page 1 of4 TRANS#:01-0000727 DATE:FEB 25 2000 AMT RECD:2 $ 4851.74 CHANGE: CASHIER: 059 CITY OF SPRINGFIELD, OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 99,01681,01 Office: 726,3759 Inspection Line: 726,3769 Location Of Proposed Site: 6744 Ivy St Spr Assessors Map#: 18020314 Lot: 10 Block: Addition: Owner: Address: Tax Lot #: 01600 Subdivision: South Hills North Morgan Design and Construct Phone Number: 541-687-9318 City/StatelZip: Eugene, OR 97408 New Value: $158,587 Scope Of Work: Single Family Residence , 1520 Balboa Street Contractor Registration # Expiration Date Morgan Design and Construct 1520 Balboa Street, Eugene, OR 97408 Electrical Contr Rose Electric 89976 DAY LANE, EUGENE. OR 97402,9415 Contractor Type General Contr Phone 541-687,9318 541-686-0905 Mechanical Contr Associated Heating and Air Cond PO Box 412, Eugene, OR 97440 Plumbing Contr Fridlund Plumbing X,X,X Quad Area: # Of Units: Constr. Type: Water Heater: 541-683,2590 1 (VN) Wood Frame Office Use Land Use: Zoning Code: Bedrooms: 4 Range: # Of Buildings: 1 Occupancy Group: Dwelling Heat Source: Sq. Footage: 2164 To request an inspection call the 24 hour recording at 726-3769, All inspections requested before 7:00 a.m, will be made the same working day, inspections requested after 7:00 a,m, will be made the following working day. Site Verify Ground Rod Footing Foundation Post and Beam Floor Insulation Ceiling Insulation Shear Wall Nailing Required Inspections I Building I ,To be made after excavation but prior to setting forms, ,Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation i ,After trenches are excavated, ,After forms are erected but prior to concrete placement. ,Prior to floor insulation or decking, ,Prior to decking, ,Prior to cover, ,Before covering sheathing with finish materials, Framing Wall Insulation Drywall Final Building Temporary Power Rough Electrical Electrical Service Final Electrical Underfloor Plumbing Underfloor Drain Rough Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Final Plumbing Underfloor Mechanical Rough Gas Rough Mechanical Gas Service Final Mechanical Curbcut Sidewalk . . Job# 99-01681-01 I Required Inspections Building Page 2 of4 ,Prior to cover, ,Prior to Cover -Prior to taping, ,When all required inspections have been approved and the building is complete, I Electrical I ,Approval required prior to SUB energizing pole, ,Prior to cover. ,Must be approved to obtain permanent power, ,When all electrical work is complete. I Plumbing ,Prior to insulation or decking, ,Prior to cover or placement of concrete, ,Prior to cover, ,Prior to filling trench. ,Prior to filling trench. ,Prior to filling trench, ,When all plumbing work is complete, I Mechanical ,Prior to insulation or decking, -After line is installed and capped if not attached to an appliance, ,Prior to cover, ,After line is installed and line has been connected to a minimum of one appliance. Pressure tes -When all mechanical work is complete, I Public Works I ,After forms are ereceted but prior to placement of concrete, ,After excavation is complete, forms and sub base material is in place, Construction Types~VN) Wood Frame Occupancy Groups: Dwelling # Of Buildings: 1 # Of Bedrooms: 4 Handicap Access? 0 rArea (Sq. Feet) I Main: 2164 Accessoryl'l30 Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building Wiring Footage 1,000 Sq Ft or Less Wiring Footage Each Add'l 500 Sq Ft Fee Residential Plan Check Total Plan Check # Of Stories: 3 Current Units: Census Code: Does not apply Total:2594 J Paid On Receipt# Plan Check 02/25/2000 36445 Height (feet): 39 Proposed Units: 1 Value/Quantity Fee Amount r 158,587 $367,74 $367,74 Building 02/25/2000 727 02125/2000 727 02125/2000 727 158,587 $565,75 $39,60 $16,97 $622,32 Electrical 02/25/2000 727 02/25/2000 727 1 4 $85,00 $60,00 . ., Fee Temporary: 200 Amps or Less State Surcharge For Electrical Permit Electric Administrative Fee Total Electrical Minimum Plumbing Permit Fee Three Bathrooms State Surcharge For Plumbing Permit Plumbing Administrative Fee Total Plumbing Hood and Exhaust One to Four Outlets Minimum Mechanical Permit Mechanical Administrative Fee Less than 100,000 BTU Vent Fan to One Duct Dryer Vent Mechanical Issuance State Surcharge For Mechanical Permit Total Mechanical New Sidewalk Total Public Works Residential, Single Family, Storm Sanitary Sewer Residential Transportation Residential Sanitary MWMC Residential Improvement MWMC MWMC Administrative Fee SDC Administrative Fee Property Annexed 1994 Total System Development S,F, Residence, Willamalane Total Willamalane SDC Grand Total Plan Check Type Structural,Res Checked By Don Moore Job# 99-01681-01 I Paid On Receipt# Electrical 02/25/2000 727 02/25/2000 727 02/25/2000 727 Plumbing 02/25/2000 727 02125/2000 727 02/25/2000 727 02/25/2000 727 Mechanical 02125/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 Public Works 02/25/2000 727 System Development 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 02/25/2000 727 Willamalane SDe 02/25/2000 727 Date Completed 02/25/2000 . Page 3 of4 Value/Quantity Fee Amount 1 $40,00 $12,95 $5,55 $203,50 1 $,00 $192,50 $13.48 $5,78 $211.76 1 1 $4,50 $2,00 $,00 $,83 $6,00 $12,00 $3.00 $10.00 $1,93 $40,26 1 4 1 72 $60,00 $60.00 2,308 27 1 1 1 1 $535,34 $1,303.29 $491,60 $242,76 $22,05 $10,00 $129,23 $,20,37 $2,713.90 24 1 $1,000,00 $1,000.00 $5,219.48 . . I Job# 99~1681~1 I Page 4 of 4 .By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertainin~ to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the appr sRPI~main on the site at all times during construction. ...l-&~r.J p-nature Date