Loading...
HomeMy WebLinkAboutPermit Electrical 1995-7-25 . The following project es submitted has the following zoning, and does not require specific land use epproval, L ~ Zonina D 97477 -J LS-{;) 7:rfiUJB..7hll - t (\II. Authorized SIgnature rJ j, 225 FIFTH STREET SPRINGFIELD, OREGON INSPECTION REQUEST: OFFICE: 726-3759 1. t~~<X\b IN~\J\iO~ ~f)sgf~ON O?&(YJ 6l~K"er <' jCfGB ~PTION U -r _ "t< O..J;:\ ~ Permits are non-transferable and expire if work is not started within 180 days of issuance or if work is suspended for 180 days. CONTRACTOR INSTALLATION ONLY / ContI!'actor Address City Supervisor Expiration ELECTRICAL PERMIT APPLIC~~ City Job Number qCSlAJ\:T\ COMPLETE FEE SCHEDULE BELOY A. New Residential-Single or Multi-Family per dwelling Service Included: unit. Items Cost Sum 1000 sq.ft. or less Each additional 500 sq. ft or portion thereof Each Manuf'd Home, or Modular 'Dwelling Service or Feeder B. Services or Feeders Installation, Alterations or Relocation: 200 amps or less 201 amps to 400 amps 401 amps to 600 amps 601 amps to 1000 amps Over 1000 amps/volts Reconnect Only I 1- PJ5 Jd) $ 85.00 $ 15.00 $ 40.00 $ 50.00 $ 60.00 $100.00 $130.00 $300.00 $ 40.00 C. Temporary Services or Feeders Installation, Alteration or Relocation of Supervising Elec~ Owners Name The installation is being made on property I own which is not intended tor sale, lease or rent, Ovners Signa7reu^/ 'i~_--L'PTo;,. .------ RECEIi"i 11: II J,~ I RECEIVED BY: \.1\00 ~ 200 amps' 'or less $ 40.00 201 amps to 400 amps $ 55.00 Over 401 to 600 amps $ 80:00 Over 600 amps or 1000 volts see "B" above D. Branch Circuits .' New, Alteration or Extension Per Panel One Circuit Each Additional Circuit or with Service or Feeder Permit $ 35.00 $ 2.00 not'included) Miscellaneous (Service/feeder -Each installation Pump or irrigation Sign/Outline Lighting Limited Energy/Res Limited Energy/Comm E, 5, SUBTOTAL OF ABOVE 5% State Surcharge 3% Administrative Fee TOTAL $ $ $ $ 36.00 ~~~, J -t.:~ "J\g 40.00 40.00 20.00