Coakley Engineering Inc.
. 3669 Sanders. Eugene, OR 9~404
PO'3l~H:" t.r;.md fax transmittal memo 7671 1/1 of page$' to I
-From
R,../? r "'""-"I'
Co,
(503) 689-83'l~
ITO J1L.JIG-- JltS /JpI!I/A
Ico'
fle,lin,r ).II) <j (00..9
:Oepl. ,
: ,,7tt Ivev<,n.
\FO," 7.,,:; (~v<;
Phone 1/
'8'7 '?J7'J
6 8,,) S-.3 79
April 17, 1995
Fax I;
Marv La Vasseur
Heirloom Construction
1705 Minda Drive
Eugene, OR 97401
flef: Springfield Building ~errniUl50p39
Address:,/"679~l~)' Stre~t_.- ,j
~-
Marv:
I have inspected your building site, forms, fill and compaction.
.
I have no concern with the quality of the fill material, with the quality of the rock or wltll
the compaction. The outside of the footing seems to be a little close to the edge of the'
leveled pad along the west wall and the south wall and the slope of the bank is quit.,
steep, These problems will be taken care of after you pour the footings, when you add
the additional fill to provide 12 inches of cover over the bottom of the footing conCltlte
This is required by the Building Code and Is shown on the print. The northwest COrriN
is of particular concern.
Per our discussion you are going to pour the floor oVer the top of the footing. The floo,
will be tied to the footing with No.4 rebar on 12" to 24" centers and you are going to use
a NO.4 rebar mat in the floor In place of the wire mesh specified on the print. This will
also stabilize the footing along the north and west wall.
Thanks
~~
Robert Coakley I' F
Coakley Engineering, Inc.
RC/pa
~.
- ~