Loading...
HomeMy WebLinkAboutPermit Building 2002-7-11 '. . I Job# 01-01420-01 I . . . 'ti> Page 1 of 5 TRANS#:01-0009901 DATE:JUL 11 2002 AMT RECD:2 $ 231.15 CHANGE: CASHIER: 061 CITY OF SPRINGFIELD, OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 01-01420-01 225 Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Tax Lot #: 03200 Subdivi-^~' Levi Landing ;J.~ Owner: Tom Wirfs Enterprises Inc Phone Number: ~~~04 Address: Po Box 237 CitY/State/ZiP:~~~~, OR 97477 Scope Of Work: Single Family Residence New <$>.~ q,s>~alue: $147,414 -? ~~ S>~ SFR - same as 3320 Watermark #01-008,17-OJ". if ~<<: -6 ~~ ~..". ~f.:>.'Sf;;;J'<" ~' Contractor Type Contractor ~ ~~~.~a~ # Expiration Date General Contr Tom Wirfs Enterprises Inc ~~.:I? t--~~~~ 6/28/2004 541-747-8704 Po Box 237, Springfield, OR 97477 .;ji>,,~ ....<o~ :-? , ~" ,.\" 0" .~, "" Bills Electric -"M351 4/28/2004 "~~,,. ,,541;687-1851 ~ ,of) ~ rl;- "'.;) .\ 3170 West 11th Street, Eugene, OR ;it' ~ 0<:; ,!Jj" ~'Q"" ,b ,,\<<1 ~ 'liJ .,<<1 Mechanical Contr Home Comfort Heating & Air Conditio 84164 6/25/2003,J,,,0.,'7" ,So ,.541<345;2838 ~ ~y "~Ol- .'C.I -s;.v'~ PO Box 24205, Eugene, OR 97402 S-':o:>""'" 0\-::; ~ ':;,'S' ",0~ .d~ ;-'.0 ,,OJ .~.." ~o ,<<I_~ Home Comfort Heating & Air Conditio 84164 .' ~.,2~/200..~P O<l'.'S'0 5.4;!p.~45-2838 PO Box 24205. Eugene, OR 97402 .,~'<:r'/)-lj ~0"r;:"r;:,',$'G_,o,0'v$\n;r, .,' "-'" cP-o .lJ ,'l)- ~- ~ n'J, 103570..' \\".0'" 13'15/20E}' ~O lf '541-895-3758 , ~:} <f! ~'1: .co.i!'> 0~ O\'li 'lJ'S .....0 .::~:~v ^ OJ .......,.. 0',0 ~....0 ,.a'; ~v- Y"T~'" '\:' ~.... ~.. Office Use ,,~o "r;:,' ~~~ &,0 if:-0 " r-\'J ~ -r.,0 r~ Single Family Dwelling> "'~# Of'Buildings: 1 LDR <" Occupancy Group: Dwelling 3 Heat Source: Sq. Footage: 1595 Location Of Proposed Site: 6679 Assessors Map#: 17023411 Lot: 110 Block: Jacob Ln Spr Addition: 2 Phone Electrical Contr Plumbing Contr Plumbing Contr Brenda Marlene Currier 648 W Oregon Ave, Creswell, OR 97426 Quad Area: # Of Units: Constr. Type: Water Heater: 4RNE 1 (VN) Wood Frame Land Use: Zoning Code: Bedrooms: Range: To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day. inspections requested after 7:00 a.m. will be made the following working day. Site Verify Ground Rod Footing Foundation Post and Beam Floor Insulation Required Inspections I Buildinll I - To be made after excavation but prior to setting forms. -Install ground rod at footing, and call for inspection in conjuction with footing andlor foundation ir -After trenches are excavated. -After forms are erected but prior to concrete placement. -Prior to floor insulation or decking. -Prior to decking. Street Improvement: Fully Improved Curb Cut?~ Improvement Agr.?D San Sewer Depth (Ft): 6 4 Storm Sewer Available? ~ Special Req.: Security Required: Bond Begin DateTime: Special Instructions: Other Utilities: . , Ceiling Insulation Shear Wall Nailing Framing Wall Insulation Drywall Special Bolts installed in concrete Hold Downs Installed Final Building Temporary Power Verify Ground Rod Rough Electrical Electrical Service Final Electrical Underfloor Plumbing Rough Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Final Plumbing Underfloor Mechanical Rough Gas Rough Mechanical Gas Service Insert Final Gas Final Mechanical SW-Curbside CC-Overwidth CC-Standard Project Supervisor: . . I Job# 01-01420-01 I Required Inspections Building Page 2 of 5 - Prior to cover. . Before covering sheathing with finish materials. - Prior to cover. - Prior to Cover - Prior to taping. -See Plan Review andlor Inspectors Notes, or prior to cover if applicable. - To be done by a State Certified Special Inspector. Provide inspection test reports to City Buildin! - When all required inspections have been approved and the building is complete. I Electrical I -Approval required prior to SUB energizing pole. -Install ground rod at footing, and call for inspection in conjuction with footing andlor foundation ir - Prior to cover. - Must be approved to obtain permanent power. - When all electrical work is complete. I Plumbing - Prior to insulation or decking. - Prior to cover. - Prior to filling trench. -Prior to filling trench. -Prior to filling trench. -When all plumbing work is complete. I Mechanical - Prior to insulation or decking. -After line is installed and capped if not attached to an appliance. - Prior to cover. .After line is installed and line has been connected to a minimum of one appliance. Pressure tes -After installation. -When all gas work is complete. -When all mechanical work is complete. I Public Works I -After forms are erected but prior to placement of concrete -After forms are erected but prior to placement of concrete -After forms are erected but prior to placement of concrete Sidewalk Type: Additional ROW? Size Of Line (in): Downspouts/Drains: Enchroachment Permit: , Curbside - 5' o 8 To Curb and Gutter San Sewer Tee (In): 6 0010010000 00:00:00' Bond End DateTime: 001001000000:00:00 . NO OCCUPANCY OR SEWER HOOKUP UNTIL CITY ACCEPTS INFRA~ Types Of Warning Devices Reqd. .' . I Job# 01-01420-01 I . Z6'ning: LDR FloodPlain? 0 Wetlands? 0 Journal numbers 1: 1997-06-0142 2: 3: Comments:City determined flood plain - FEMA elevation cert. required Planner: Jim Donovan Urban Growth Boundary?D Glenwood Area? 0 Quantity Of Fill: Supplier: Drainage: Floodway FEMA: See Above Construction Types:(VN) Wood Frame Occupancy Groups: Dwelling # Of Buildings: 1 # Of Bedrooms: 3 Handicap Access? 0 ,Area (Sq. r ,~1) I Main: 1595 Accessoryl450 Fee Hourly Plan Review Total Plan Check Building Permit Building Permit State Surcharge For Building Permit State Surcharge For Building Permit 8% Building Administrative Fee 8% Building Administrative Fee Total Building Minimum Electrical Permit Fee Wiring Footage 1,000 Sq Ft or Less Wiring Footage Each Add'l 500 Sq Ft Temporary: 200 Amps or Less State Su rcharge - Electrical 8% Admin Fee - Electrical Total Electrical Two Bathrooms State Surcharge - Plumbing 8% Administrative Fee - Plumbing Total Plumbing Hood and Exhaust One to Four Outlets Minimum Mechanical Permit 8% Administrative Fee - Mechanical Overlay District: Floodplain Overlay # of Street Trees: 2 Additional Requirements: Required Attachments: Source Locn: Material: Flood Plain FEMA: Page 3 of 5 Land Use: Single Family Dwelling Pave Driveway? 0 Private Garage/Carp/Stor # Of Stories: 1 Height (feet): 18 Current Units: Proposed Units:1 Census Code: New SF - detached Total:2045 Paid On Receipt# Value/Quantity I Plan Check I 12/26/2001 7609 2 Buildin!! 01/18/2002 7828 07/11/2002 9901 01/18/2002 7828 07/11/2002 9901 01/18/2002 7828 07/11/2002 9901 Electrical 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 Plumbin!! 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 Mechanical 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 Fee Amount $90.00 $90.00 125,590 21,824 $650.15 $201.00 $45.51 $14.07 $52.01 $16.08 $978.82 1 3 1 $.00 $106.00 $57.00 $50.00 $14.91 $17.04 $244.95 1 $254.00 $17.78 $20.32 $292.10 1 3 $9.00 $4.00 $.00 $4.64 . . Fee Less than 100,000 BTU Vent Fan to One Duct Gas Fireplace Dryer Vent Mechanical Issuance State Surcharge - Mechanical Total Mechanical New Sidewalk New Curbcut 2nd Driveway/Overwidth Appl Fee Multiple Permit Discount - 2nd Permit Total Public Works Residential - Single Family - Storm Residential Improvement MWMC MWMC Administrative Fee SDC Administrative Fee Residential Sanitary MWMC Residential - Improvement Residential. Reimbursement Sanitary Sewer SDC Reimbursement Sanitary Sewer SDC Improvement Total System Development S.F. Residence - Willamalane Total Willamalane SDC Planning Plan Review Total Planning Address Assignment Total Permits w/o Srchg Grand Total Plan Check Type Checked By Initial Review-Res Lisa Hopper Steve Templin Engineering-Res Planning-Res Liz Miller Structural-Res Bob Barnhart Job# 01-01420-01 Paid On Receipt# r-- Mechanical 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 . Page 4 of 5 Value/Quantity Fee Amount 1 3 1 1 $12.00 $18.00 $9.00 $6.00 $10.00 $4.06 $76.70 Public Works 01/18/2002 7828 01/18/2002 7828 04/29/2002 8756 01/18/2002 7828 90 1 1 1 $65.00 $65.00 $30.00 $-30.00 $130.00 System Development 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 01/18/2002 7828 3,621 1 1 $988.40 $34.83 $10.00 $144.78 $332.86 $659.76 $155.13 $406.03 $308.56 $3,040.35 1 1 1 19 19 Willamalane SDC 01/18/2002 7828 1 $1,000.00 $1,000.00 Plannin!l 01/18/2002 7828 1 $50.00 $50.00 Permits w/o Srch!l 01/18/2002 7828 1 $8.00 $8.00 $5,910.92 Date Completed Comment 12/31/2001 01/09/2002 NO OCCUPANCY OR SEWER HOOKUP UNTIL CITY ACCEPTS INFRASTRUCTURE. 24' MAXIMUM DRIVEWAY THROAT WIDTH Called Tom Wirfs to determine if LDAP needed. FEMA Elevatin certificate required. 01/08/2002 01/08/2002 . . I Job# 01-01420-01 I . Page 5 of 5 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property. and the ;; approved set 0~3~ will remain on the site at all times during construction. / J./C?::? 7 (( /0 L Signature Date! I