Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-20 (2) l"'~ ;l Information ~~. ~To Build On Engineering. Consulting. Testing co (V\ 1.- eo ~ - 6 () '2.-1>'2.. DAILY FIELD REPORT Date Performed: June 20, 2006 Ms Julie Daniels Bring Recycling POBox 885 Eugene, OR 97440 Report Number: 722-60111-35 Client: Project Name: Planet Improvements Center, Ph 1 PrOject Location: 4446 Franklin Blvd Springfield, Oregon P.O. No.: Type of InspectIOn: F abncator/Erector: Contractor: Welding Inspection Permit No : Weather: Shop or Field' Clear Field Morns Keilty Field Observations and Comments Performed arbitration Inspection of the 3/4" A-325 high strength bolts In bUilding #3 beam to beam and beam to column connections Bolts were previously tensioned prior to arnvlng on-site A sample of 3/4" high strength bolts were Installed In a Skidmore Wilhelm tension indicator USing a calibrated torque wrench established a value of 330 pounds In place bolts were checked and found to meet and/or exceed minimum value of 28 kips for (3/4) A-325 bolts Arbitration performed as per AISC manual Inspector: DaVid Smith, ICC# 0877340-85 If you have any questions regarding this report, please feel free to contact us at 541-746-9649 Respectfully Submitted, professlona1j;rvlce Industnes, Inc ~~,~ Chnstopher Thomason Structural Steel Field Supervisor c TBG Architects & Planners City of Springfield Morns Kielty Construction HOHBACH-LEWIN,INC THIS REPORT IS PROVIDED FOR THE INFORMA T10N OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES IS PROHIBITED ProfeSSional Service Industnes, Inc. 1040A Shelley St . Spnngfleld, OR 97477. Phone 541/746-9649. Fax 541/746-7163