HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-20 (2)
l"'~ ;l Information
~~. ~To Build On
Engineering. Consulting. Testing
co (V\ 1.- eo ~ - 6 () '2.-1>'2..
DAILY FIELD REPORT
Date Performed:
June 20, 2006
Ms Julie Daniels
Bring Recycling
POBox 885
Eugene, OR 97440
Report Number:
722-60111-35
Client:
Project Name:
Planet Improvements Center, Ph 1
PrOject Location:
4446 Franklin Blvd
Springfield, Oregon
P.O. No.:
Type of InspectIOn:
F abncator/Erector:
Contractor:
Welding Inspection
Permit No :
Weather:
Shop or Field'
Clear
Field
Morns Keilty
Field Observations and Comments
Performed arbitration Inspection of the 3/4" A-325 high strength bolts In bUilding #3 beam to beam and beam to column
connections Bolts were previously tensioned prior to arnvlng on-site A sample of 3/4" high strength bolts were
Installed In a Skidmore Wilhelm tension indicator USing a calibrated torque wrench established a value of 330 pounds
In place bolts were checked and found to meet and/or exceed minimum value of 28 kips for (3/4) A-325 bolts
Arbitration performed as per AISC manual
Inspector: DaVid Smith, ICC# 0877340-85
If you have any questions regarding this report, please feel free to contact us at 541-746-9649
Respectfully Submitted,
professlona1j;rvlce Industnes, Inc
~~,~
Chnstopher Thomason
Structural Steel Field Supervisor
c TBG Architects & Planners
City of Springfield
Morns Kielty Construction
HOHBACH-LEWIN,INC
THIS REPORT IS PROVIDED FOR THE INFORMA T10N OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES IS PROHIBITED
ProfeSSional Service Industnes, Inc. 1040A Shelley St . Spnngfleld, OR 97477. Phone 541/746-9649. Fax 541/746-7163