HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29
l.... te- ;llnfiJrmation
~_. .ToBuildOn
2ng1neerlng · eon.uttIng · Te.tlng
Client
Address'
Ms Julie Daniels
Bnng Recycling
PO Box 885
Eugene, Oregon 97440
Placement Data
BUilding 7 monolithic slab
Location Sampled At
same
Date Cast 06/15/06
Ticket No MIX No
2615019 2430NIEOVM
Design Strength (pSI):
Cylinder No Test Date
06-1554 6/22/2006
06-1555 6/22/2006
06-1556 7/13/2006
06-1557 7/13/2006
06-1558 7/13/2006
SPRINGFIELD OFFICE
COMPRESSION REPORT
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
June 29, 2006
COM 2006-00202
PrOject No,' 722-60111-36
Proj, Name Planet Improvements Center, Ph I
Location: 4446 Franklin Blvd
Spnngfleld, Oregon
Date:
B,P, No.'
PO. No
Cast By:
David Smith
Field Test Data
Matenal Concrete
Date Rec'd
Weather
06/16/06
Slump (m) ASTM C143
. Max Aggr SI2;e
Air Content ASTM C231
Air Temperature (F)
Matenal Temp (F) ASTM C1064
5"
3/4"
18%
67
71
Overcast
required 3,000
Age (days)
Field Cure
(days)
Lab Cure
(days)
Yardage
Max Temp (F)
Mm Temp (F)
Specimen Size 6 x 12
Unit Weight (pct) ASTM C138
Time Cast 2 40 PM Cunng Conditions
Additives Midrange super
Results Reported To Contractor
ASTM C31
7
7
28
28
28
6
6
27
27
27
Load
Total
Supplier
Morse Bras
1
5 1/2
Compressive Strength Data ASTM C39
placed 3,000
Diameter or Cross Sect Area Cylinder WT Comp Strength
Dimensions Max Load (Ibs ) Fracture Type ** Test Time
(Inches) (s I ) (Ibs) (pSI)
601 2837 284 93,195 3,280 3 9 23 AM
600 2827 286 93,645 3,310 9 27 AM
Capping Method
C617 -03
C1231-03
x
X
** 1 - Cone (both ends) 2 - ConelVertlcal Cracks (one end) .j - Columnar 4 - Diagonal wino craklng at ends
Remarks'
c. TBG Architects & Planners
City of Spnngfleld
Morns Kielty Construction
Morse Bras
\
5 - Side fractures (at top of botlom)
6 - Top fraclures (s~me as #5 but end of cylinder IS po,ntech '
Re :4::tfU~~f~~~ltted,
pr(i,~~'17\:ces Industnes, Inc
Ste^-Jen E Wilder
Laboratory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES