Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-7-10 (2) l"'~;l InfomUltion ~~. .ToBuildOn Engineering. Consulting · Testing DAILY FIELD REPORT Date Performed: July 10,2006 Report Number. 722-60170-13 Client. Mr Dennis Dille Project Name: Chip Handling Project Weyerhaeuser 1300 SW 5th Ave, SUite 500 Project Location: 785 North 42nd Street Portland, OR 97201 Spnngfield, Oregon P.O. No.: Permit No.: COM~Ov; --00:3 DO Type of Structure: Weather: Overcast Type of Inspection: Reinforcing Steel Field Observations and Comments 'Performed continuous Inspection of reinforcing steel In the follOWing locations wheel ring foundation sections 5 through 8 for pours 3 and 4 see detail A/50040 Reinforcing steel was checked for grade, Size, lap, placement, and clearances where applicable Reinforcing steel was secured uSing tie wire and supported on concrete doble blocks Reinforcing steel was placed In accordance with approved design drawings, speCifications, and latest reVISions dated May 10, 2006 Note not all forms are In place, clearances Will be checked prior to pour To the best of our knowledge, the work Inspected above was In" accordance With the bUilding department approved design drawings, speCifications and applicable workmanship proVISions of the International BUilding Code Contractor was asked to notify our office when additional services are needed Inspector: David Smith, ICC# 0877340-88 If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649 c City of Springfield Solarc Architecture - Galen Ohmart Broad Base - Roy Gray Branch Engineering - Rene Fabricant THIS REPORT IS PROVIDED FOR THE INFORMA TION OF THE CLIENT ONL Y THE REPROOUCTION OF THIS REPORT, BY ANY METHOD, ANO ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES IS PROHIBITED ProfeSSional Service Industnes, Inc' 1040A Shelley St . Spnnglield, OR 97477' Phone 541f746-9649' Fax 541f746-7163 ---