Daily Field Report
Client: Mr Keith Lockhart Project. SUB Emergency Generator Date' 08/22/06
Springfield Utility Board 250 A Street Project No . 2067170
223 A Street-STE B Springfield, Oregon Report No.. E13924
Spnngfleld, Oregon 97477 PO #0800000034 Inspector A Fenstermacher
10 No.. 5258882-49
Inspection of' Epoxy Anchors Weather' Overcast Continuous Inspection: 0
Contractor: Harvey & Pnce BPNo.: COM2006-00411 Periodic Inspection: 0'
Performed continuous Inspection dUring the InstallatIon of four (4) 1/2" x 6" stainless
steel all-thread anchors Into slab for generator anchorage Prior to Installation the pre-
drilled holes were cleaned With compressed air and a brush Verified embedment
depth of 4 Inches Anchors were secured With Simpson AT epoxy (ICBO ER 5791,
expiration 03/07) Contractor stated that epoxy would be allowed to cure before nuts
would be tightened
To the best of our knowledge, the work Inspected was In accordance With plans dated
05-09-06 and applicable workmanship prOVIsions of the I B C , except If noted above
Contractor was asked to notify our office when additional services are needed
Respectfully,
A .';( IL_____
Michael L Mefer
Technical Manager
c City of Spnngfleld
MLMJm
This report and/or enclosed test data is the confidential property of the client to whom It IS addressed and pertains to the specific
process and/or matenal evaluated As such, Information contained herein shall not be reproduced In part or full and/or any part
thereof be disclosed Without FEI Testing & Inspecl1on, Inc 's wntten authonzal1on
7ffJ NI/V Cornell Avenue CorvalliS, Oregon 97330 phone (541) 757-4098 fax (541) 757-2991
29540 B AIrport Road Eugene, Oregon 97402 phone (541 ) 684-3849 fax (541 ) 684-3851