Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-10-17 I' "~rp ii ...~ttJ U~~llllll!.411~~~UI'!iIll'l'!rl Geotechnical & ConstructJon Services October 17, 2006 , Project No 2067229 Report No E14725 Mr Ron Bronner Ron Bronner Construction 37240 Wheeler Road Pleasant HIli, Oregon 97455 " ,^ FINAL SUMMARY REPORT Subway 551 Centennial Blvd. Springfield, Oregon Building Permit No. COM2006-01027 Dear Mr Bronner,. This letter confirms that FEI Testing & Inspection, Inc performed special Inspection services In accordance wIth IBe and as dIrected by our chent for the above-referenced project. We were employed to provide continuous or periodiC Inspection on speCifiC dates, as documented per our special Inspection reports for Dearthwork Dstructural masonry Depoxy dowels/wedge anchors Drelnforced concrete Dbolts Installed In concrete Dstructural welding (shop/field) Dhlgh-strength bolts 0drop-ceillng gnd Installation Based upon our observations and written reports of this work, It IS our judgment that the Inspected work was performed, to the best of our knowledge, In accordance with the approved plans, speCifications" change orders and/or structural engineer's instructions, and applicable prOVIsions of Chapter 17 of the International BUilding Code, unless otherwise noted or referenced above. Respectfully, /1/ /!///l~/ Michael L Meyer Technical Manager, c City of Springfield MLM JW . I ) This report and/or enclosed test data IS the confidential property of the client to whom It IS addressed and pertains to the speCifiC process and/or matenal evaluated As such, information contained herein shall not be reproduced In part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc 's written authonzatlon 7f:IJ NVV Comell Avenue Corvallis, Oregon 97330 phone (541) 757-4698 fax (541) 757-2991 ,?QC\dnRAuTvvtR"",n I=lIro:>r1'::> r'io::>rvvlQ7M1? nhnn,::>{t:;d1\RA.1-~Q bv{t;41\AA<L~t:;1 . GfEI Page 1 of 1 11:l.'lllirl:411~.,~:..qlliJt_ Geotechnical & Construcbon SeMC8S Daily Field Report Client: ~ , Mr Ron Bronner Project. Ron Bronner Construction 37240 Wheeler Road Pleasant HIli, Oregon 97455 Subway 551 Centennial Blvd Spnngfleld, Oregon Date Project No.. Report No.' Inspector. ID No.. 11-1 7 -06 2067229 E14724 M Meyer Inspection of: Ceiling Gnd Weather: Inside Contractor: Ron Bronner Construction BP No , COM2006-01027 Continuous Inspection: D Periodic Inspection: [{I \ / Performed Inspection on the completed drop-ceiling gnd Installation The Armstrong TEE suspension system for the 2' x 2' ceiling tiles was anchored to the 7/8" wall moulding with BERC 2 clipS secured along two (2) adjacent walls at approximately 4' on center Unsecured BERC 2 clips were Installed on opposite walls Support wires are also Installed at each T-Intersectlon within 8" of wall faces around penmeter of room 3/4" metal conduit seismiC struts are anchored to gnds and roof components at :t12' on center To the best of our knowledge, the work Inspected was In accordance wIth IBC Installation ReqUIrements by Armstrong World Industnes provided by contractor, except If noted above Contractor was asked to notify our office when additional services are needed Respectfully, (1/ 111$ 0~ / 1Vilc~e; L Meyer Technical Manager " c City of Spnngfleld MLMJw This report and/or enclosed test data IS the confidential property of the client to whom It IS addressed and pertains to the specific process and/or matenal evaluated As such, Information contained herein shall not be reproduced In part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc 's wntten authorization- 7fIJ NN Cornell Avenue Corvallis, Oregon 97330 phone (541) 757-4698 fax (541) 757-2991 29540 B Allport Road Eugene, Oregon 97402 phone (541) 684-3849 fax (541) 684-3851