October 17, 2006
,
Project No 2067229
Report No E14725
Mr Ron Bronner
Ron Bronner Construction
37240 Wheeler Road
Pleasant HIli, Oregon 97455
"
,^
FINAL SUMMARY REPORT
Subway
551 Centennial Blvd.
Springfield, Oregon
Building Permit No. COM2006-01027
Dear Mr Bronner,.
This letter confirms that FEI Testing & Inspection, Inc performed special Inspection services
In accordance wIth IBe and as dIrected by our chent for the above-referenced project. We
were employed to provide continuous or periodiC Inspection on speCifiC dates, as documented
per our special Inspection reports for
Dearthwork
Dstructural masonry
Depoxy dowels/wedge anchors
Drelnforced concrete
Dbolts Installed
In concrete
Dstructural welding (shop/field)
Dhlgh-strength bolts
0drop-ceillng gnd Installation
Based upon our observations and written reports of this work, It IS our judgment that the
Inspected work was performed, to the best of our knowledge, In accordance with the approved
plans, speCifications" change orders and/or structural engineer's instructions, and applicable
prOVIsions of Chapter 17 of the International BUilding Code, unless otherwise noted or
referenced above.
Respectfully,
/1/ /!///l~/
Michael L Meyer
Technical Manager,
c City of Springfield
MLM JW .
I
)
This report and/or enclosed test data IS the confidential property of the client to whom It IS addressed and pertains to the speCifiC process and/or matenal
evaluated As such, information contained herein shall not be reproduced In part or full and/or any part thereof be disclosed without FEI Testing &
Inspection, Inc 's written authonzatlon
7f:IJ NVV Comell Avenue Corvallis, Oregon 97330 phone (541) 757-4698 fax (541) 757-2991
,?QC\dnRAuTvvtR"",n I=lIro:>r1'::> r'io::>rvvlQ7M1? nhnn,::>{t:;d1\RA.1-~Q bv{t;41\AA<L~t:;1
.
GfEI
Page 1 of 1
11:l.'lllirl:411~.,~:..qlliJt_
Geotechnical & Construcbon SeMC8S
Daily Field Report
Client:
~
,
Mr Ron Bronner Project.
Ron Bronner Construction
37240 Wheeler Road
Pleasant HIli, Oregon 97455
Subway
551 Centennial Blvd
Spnngfleld, Oregon
Date
Project No..
Report No.'
Inspector.
ID No..
11-1 7 -06
2067229
E14724
M Meyer
Inspection of: Ceiling Gnd Weather: Inside
Contractor: Ron Bronner Construction BP No , COM2006-01027
Continuous Inspection: D
Periodic Inspection: [{I
\
/
Performed Inspection on the completed drop-ceiling gnd Installation The Armstrong
TEE suspension system for the 2' x 2' ceiling tiles was anchored to the 7/8" wall
moulding with BERC 2 clipS secured along two (2) adjacent walls at approximately 4'
on center Unsecured BERC 2 clips were Installed on opposite walls Support wires
are also Installed at each T-Intersectlon within 8" of wall faces around penmeter of
room 3/4" metal conduit seismiC struts are anchored to gnds and roof components at
:t12' on center
To the best of our knowledge, the work Inspected was In accordance wIth IBC
Installation ReqUIrements by Armstrong World Industnes provided by contractor,
except If noted above Contractor was asked to notify our office when additional
services are needed
Respectfully,
(1/ 111$ 0~ /
1Vilc~e; L Meyer
Technical Manager
"
c City of Spnngfleld
MLMJw
This report and/or enclosed test data IS the confidential property of the client to whom It IS addressed and pertains to the specific
process and/or matenal evaluated As such, Information contained herein shall not be reproduced In part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc 's wntten authorization-
7fIJ NN Cornell Avenue Corvallis, Oregon 97330 phone (541) 757-4698 fax (541) 757-2991
29540 B Allport Road Eugene, Oregon 97402 phone (541) 684-3849 fax (541) 684-3851