HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-10-19 ~fEI Page 1 of 1 11~'lh'llt.tII.'~~'IlIJ~_ Geotecllnlcal & Cui ~~ ucbon SeI'VlCSS Daily Field Report Client: Ms Knsten Karle Project: The Royal BUlldmg Date: 10-19-06 St Vincent de Paul 501 Mam Street Project No.: 2067145 POBox 24608 Spnngfleld, Oregon Report No.: E14454 Eugene, Oregon 97402 Inspector: E MarJama ID No.: 5235029 Inspection of: Reinforced Concrete Weather: Light Rain Continuous Inspection: 0 Contractor: Melli Construction BP No.: COM2006-00624 Periodic Inspection: 0" Performed fmal mspectlon of reinforcing steel at the fOllowmg locations contmuous footmgs - along line 6, from lines D 9 to G, on D 9, from 6 to 5 9, on 5 9, from D 4 to D 9, on D 4, from 5 4 to 5 9, on 5 4, from D 1 to D 4, on D 1, from 5 4 to 6, on 6, from D 1 to A, and on A, from 35 to 6 Column footmgs - at lines A4, A5, A6, C6, D4, D5, D6, E4, E5, E6, F2, F3 and F5 Stairwell footmg around elevator pit - on lines 2 3, from Imes E 2 to E 5, on E 5, from 23 to 3 7, on 37, from D 6 to E 5, and step footing along line E 2, from stairwell footing to elevator pit Relnforcmg steel was checked for grade, Size, lap, placement and clearance Rebar was secured with tie-wire and supported above grade Observed the placement of eighty-one (81) yards of MBI 3500 pSI concrete (mix 35-1 KV) at the above noted locations Concrete was placed by pump and consolidated by mechanical vibration Cast one (1) set of four (4) 6" x 12" concrete test cylinders Curt (Melli Construction) was notified of the fOllowmg on-site test results concrete temperature 620F, air temperature 530F, and slump 3 1/2" Corrections of previously-listed items and uncorrected previously-listed items as per report E 14405, dated 10-13-06, at area of step m footing line 3 6 from D 5 to E 5, bent bars were m place Second set of diagonal bars not Installed Curt from Melli Construction stated he had verbal okay from EOR to omit bars Wntten authorization pendmg To the best of our knowledge, the work Inspected was m accordance with plans dated 05-30-06 and Farwest Steel plans dated 09-26-06 and applicable workmanship provIsions of the I B C , except If noted above Curt (Melli) was asked to notify our office when additional services are needed Respectfully, A. t'. ~ Michael L M~r Technical Manager c Melll,Constructlon Bergsund Delaney Architecture & Planning Hohbach-Lewm Structural Engmeers City of Springfield MLMJm This report and/or enclosed test data IS the confidenllal property of the client to whom It IS addressed and pertains to the specific process andlor matenal evaluated As such, Information contained herein shall not be reproduced In part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc 's wntten authonzatlon 700 NVV Cornell Avenue Corvallis, O'egon 97330 phone (541) 757-4698 fax (541) 757-2991 29540 B Airoort Road Euaene. Oeaon 97402 ohone (541) 684-3849 fax (541) 684-3851