Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-10-13 ~trtl ~~ ~ Il:l1Il:l.!U I,\~~ m.ll!lllll1! Page 1 of 1 Geotechnical & Construcbon SeMces Daily Field Report Client. Ms Knsten Karle St Vincent de Paul POBox 24608 Eugene, Oregon 97402 ProJect: The Royal Building 501 Main Street Spnngfleld, Oregon Date' Project No . Report No.: Inspector: ID No.' Inspection of: Reinforced Concrete Contractor. Melli Construction Weather Clear BP No.. COM2006-00624 Continuous Inspection: 0 PeriodiC Inspection: 0 Performed final Inspection on the reinforcing steel at the following locations continuous footings on line 1, C to G, line C, from 1 to 2, line 2, from A to C, line A, from 2 to 3 5, bottom of mat steel In elevator pit centered at lines 3E, stairwell footings along line C 9, from 38 to 28, line D 4, from 38 to 28, line 2 8, from C 9 to D 4, column footings at lines F1, E1, D1, C1, A 1, E2, D2, C2, A2, C3, C4, C5 and A3 Performed preliminary Inspection on the reinforCing steel for footings around elevator pit along lines 2 3, from E 1 to E 5, line E 5, from 2 3 to 3 6 and line 3 6, from D to E 5 ReinforCing steel was checked for grade, Size, lap, placement and clearance ReinforCing steel was secured with tie-Wire and supported above grade Observed the placement of 55 yards of MBI 4000 pSI (MIX 24F4NE5200) concrete In bottom of elevator pit Concrete was placed by 1 pump and was mechanrcally consolidated Cast one (1) set of four (4) 6" X 12" concrete test cyllnpers Slump 41/4", concrete temperature 61F, air temperature 54F Observed the placement of 500 yards of MBI 3500 pSI concrete (MIX 35-1 KV) In footings listed above except around elevator pit Concrete was placed by pump and was mechanrcally consolidate Cast one (1) set of four (4) 6" X 12" concrete test cylinders from load 2 Curt (Melli Construction) was notified of on-site test results slump 41/2", concrete temperature 59F, air temperature 56F Items requiring correction: In elevator pit footing on line 3 6, from D 5 to E 5, rebar In area of step IS missing bent bars and one (1) set of diagonal bars as shown on 7/S5 1 To the best of our knowledge, the work Inspected was In accordance With plans and applicable workmanship provIsions of the I B C , except If noted above Contractor was asked to notify our office when additional services are needed Respectfully, /1; -/. / Jl41r'----e __e ~ Michael L Meyef T echnrcal Manager c Melli Construction Bergsund Delaney Architecture & Plannrng Hohbach-Lewln Structural Engineers City of Spnngfleld MLMJw ThiS report and/or enclosed test data IS the confidential property of the client to whom It IS addressed and pertains to the speCifiC process and/or material evaluated As such, Information contained herein shall not be reproduced In part or full and/or any part thereof be disclosed Without FEI Testing & Inspection, Inc 's written authOrization 750 NW Comell Avenue CoNal/IS, Oregon 97330 phone (541) 7574698 fax (541) 757-2991 29540 B Allport Road Euqene, Oreqon 97402 phone (541) 684-3849 fax (541 ) 684-3851 10-13-06 2067145 E14405 E MarJama 5235029 ICC