l-!~;1. Information
~~. .To Build On
Engineering. Consulting. TestingOAIL Y FIELD REPORT
Date Performed: September 1, 2006 Report Number: 722-60303-4
Client: Spnngfleld School Dlstnct #19 Project Name: A3 Academy of Arts & Academics
1890 N 42nd Street
Spnngfleld, OR 97477 Project Location: 611/615 Main Street
Spnngfleld, Oregon
P.O. No.: Permit No.: COM 2006-00836
Type of Structure: ReinforcIng Steel Weather: InsIde
Type of Inspection: Reinforced Concrete
Field Observations and Comments
. Performed visual inspection of reinforcing steel In the following location cut-out slab area for new restrooms.
Reinforcing steel was checked for grade, Size, lap, placement and clearances where applicable Reinforcing steel was
secured uSing tie wire and supported on concrete dobre blocks Reinforcing steel was placed In accordance wIth
approved design drawl'lgs and specifications Performed visual Inspection dunng placement of concrete In the locations
listed above Concrete was placed by truck and hand screeded. Cast one set offour (6x12) concrete test cylinders To
the best of our knowledge, the work Inspected above was In accordance With the bUilding department approved design
drawings, specifications and applicable workmanship provIsions of the International BUilding Code The Contractor was
asked to notify our office when additional services are needed
Iy~e of Material Concrete
Supplier Morse Bros
Mix # 40-1 KO
Slump 31/2"
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yardage Placed
Inspector: Greg Boehland
870
820
2.30 PM
4000
4 (6x12)
6
If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649
Respectfully Submitted,
Professional Service Industries, Inc.
~f~
J n erTran
De~ ment Manager
c 2G Construction-Mike Kimball
Spnngfleld School Dlstnct # 19-John Saracono
City of Spnngfleld
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS. EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
Professional SeNlce Industrres, Inc. 1040A Shelley St . Sprrngfleld, OR 97477. Phone 541/746-9649. Fax 541/746-7163
l."~;l Information
~.,. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed: August31,2006 Report Number: 722-60303-3
Client: Springfield School District # 19 Project Name: A3 Academy of Arts & Academics
1890 N 42nd Street
Springfield, OR 97477 Project Location: 611/615 Main Street
Springfield, Oregon
P.O. No.: Building Permit No.: COM 2006-00836
Type of Structure: Weather: Inside
Type of Inspection: Epoxy
Field Observations and Comments
Performed continuous inspection dUring the installation of #4 epoxied rebar dowels In the following locations (50) #4
rebar dowels at 1 '-4" on center Rebar dowels are located In eXisting floor slab, In the far South East room of the
construction site Rebar dowels Installed as per engineers specifications to detail 2/S2 Prior to installation the predrllled
hole were cleaned uSing a nylon brush and compressed air Verified minimum embedment depth of 4 Inches The
above listed epoxy anchors were Installed uSing Simpson Set 22 epoxy with ICC# 5279 The epoxy anchors were
Installed In accordance with approved Job-site plans, the manufacturer's directions and the latest reVISions dated July 17.
2006, In addition tere was the presence of an oily residue on the rebar dowels, the contractor however cleaned most of
the 011 off of the qowels before installing them To the best of our knowledge, the work Inspected above was In
accordance With the building department approved deSign draWings, specifications, and applicable workmanship
provIsions of the International BUilding Code Contractor was asked to notify our office when additional services are
needed
Inspector: Wesley Brown
If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649
Respectfully Submitted,
Profe sional Service Industries, Inc.
_r:~
c' 2G Construction-Mike Kimball
Springfield School District # 19-John Saracono
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
ProfeSSional Service Industries, Inc' 1040A Shelley St . Springfield, OR 97477' Phone 541/746-9649' Fax 541/746-7163
l-"~;' Infor71U1tion
~.,. .To Build On
Engineering. Consulting. Testing DAILY FIELD REPORT
Date Performed: August25,2006 Report Number: 722-60303-2
Client: Spnngfleld ?chool Dlstnct # 19 Project Name: A3 Academy of Arts & Academics
1890 N 42nd Street
Spnngfleld, OR 97477 Project Location. 611/615 Main Street
Spnngfleld, Oregon
P.Q, No.: Permit No.. COM 2006-00836
Type of Structure: Weather: Clear
Type of Inspection' Reinforced Concrete
Field Observations and Comments
I Performed visual inspection of reinforcing steel In the following location footing for shear walls along gndllnes C and B .
Reinforcing steel was checked for grade, Size, lap, placement and clearances where applicable Reinforcing steel was
secured usmg tie wire and supported on concrete doble blocks Reinforcing steel was placed In accordance with
approved deSign draWings and specifications Performed visual inspection dUring placement of concrete In the locations
listed above Concrete was placed by pump and mechanically consolidated Cast one set of four (6x12) concrete test
cylinders To the best of our knowledge, the work Inspected above was In accordance with the bUilding department
approved deSign draWings, specifications and applicable workmanship provIsions of the International BUilding Code
The Contractor was asked to notify our office when additional services are needed
Tvpe of Matenal Concrete
Supplier Morse Bros
Mix # 40-5
Slump 5"
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi)
Number of Samples
Total Yardaqe Placed
Inspector: Greg Boehland
73
78
10 50 AM
4000
12 00 AM
10
If you have any questions regarding this report, please feel free to contact us at 541-746-9649
Respectfully Submitted,
grof, sional Service Industries, Inc.
, _ f-r::-
Jen r Tran
ment Manager
c 2G Construction-Mike Kimball
Spnngfleld School Dlstnct # 19-John Saracono
City of Spnngfleld
THIS REPORT IS PROVIDED FOR THE INFORMA TION OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
; ~~j J-t." .~~'Ct:FT IlV "'01..1.., VVI-I-I"IULl~rtl-'--/-C:'-~.:ifOIV or F"ROn=-~:;,v/"t;~ ';~.rivfCC 1I~'C,j, ,.; r-rtUrllCII cu
Professional Service Industries, Inc. 1040A Shelley St . Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163
l-" ~ ., Information
~~. .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed: August23,2006 Report Number: 722-60303-1
Client: Spnngfield School Dlstnct # 19 Project Name: A3 Academy of Arts & Academics
1890 N 42nd Street
Spnngfield, OR 97477 Project Location: 611/615 Main Street
Spnngfleld, Oregon
P.O. No.: Building Permit No.: COM 2006-00836
Type of Structure: Weather: Inside
Type of Inspection: Epoxy '--
Field Observations and Comments
Performed continuous Inspection dunng the installation of #4 epoxied rebar dowels In the following locations (120) rebar
dowels In two locatrons (60 dowels per location) from eXisting concrete slab to wall footings Dowels were placed at 1 '-4"
on center, as per detail 2/S2 of contract draWings Pnor to installation the prednlled hole were cleaned uSing a nylon
brush and compressed air Verified minimum embedment depth of 4 Inches The above listed epoxy anchors were
Installed uSing Simpson Set 22 epoxy with ICC# ES-ER-5279 The epoxy anchors were Installed In accordance with
approved Job-Site plans and manufacturer's directions To the best of our knowledge, the work Inspected above was In
accordance with the bUilding department approved deSign draWings, speCifications, and applicable workmanship
prOVIsions of the Internatronal BUilding Code Contractor was asked to notify our office when additional services are
needed
Inspector: Wesley Brown
If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649,
c: 2G Construction-Mike Kimball
Spnngfield School Dlstnct # 19-John Saracono
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
ProfeSSional Service Industnes, Inc. 1040A Shelley St . Spnngfleld, OR 97477. Phone 541/746-9649. Fax 541/746-7163