Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-9-15 l."!:.' Iriformation ~..". .To Build On Engineering. Consulting. Testing DAILY FIELD REPORT Date Performed: September 15, 2006 Report Number: 722-60303-8 Client: Springfield School Dlstnct # 19 Project Name: A3 Academy of Arts & 1890 N 42nd Street Academics Sprrngfleld, OR 97477 Project Location: 611/615 Main Street Springfield, Oregon Contractor: Building Permit No.: COM 2006-00836 Fabricator: Gibson Steel Shopl Field: Shop Type of Inspection: Welding Weather: Inside Field Observations and Comments Performed continuous visual Inspection of the follOWing Items. In-progress and final visual of multiple pass CJP weldments to 8" x 6" x 3/4" angle (window lintel) per MR Richards approved sketch (on-file) Fit-up of weld JOints were Inspected for workmanshIp In-progress weldIng was monItored to the fabrrcators FCAW welding procedure specifications Weldments were Inspected for Size, length, profile and locations To the best of our knowledge, the work Inspected IS In conformance with approved drawIngs, specifications and applicable AWS D1 1 codes Contractor was asked to notify our office when additional services are needed . Inspector: Chris Thomason, ICC #5069949-85 If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649 Respectfully Submitted, Professional Service Industries, Inc. Chns Thomason Structural Steel Field Supervisor c 2G Construction-Mike Kimball Spnngfield School Dlstnct # 19-John Saracono City of Springfield THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED ProfeSSional Service Industries, Inc. 1040A Shelley St . Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163