HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-9-15
l."!:.' Iriformation
~..". .To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed: September 15, 2006 Report Number: 722-60303-8
Client: Springfield School Dlstnct # 19 Project Name: A3 Academy of Arts &
1890 N 42nd Street Academics
Sprrngfleld, OR 97477 Project Location: 611/615 Main Street
Springfield, Oregon
Contractor: Building Permit No.: COM 2006-00836
Fabricator: Gibson Steel Shopl Field: Shop
Type of Inspection: Welding Weather: Inside
Field Observations and Comments
Performed continuous visual Inspection of the follOWing Items. In-progress and final visual of multiple pass CJP
weldments to 8" x 6" x 3/4" angle (window lintel) per MR Richards approved sketch (on-file) Fit-up of weld JOints were
Inspected for workmanshIp In-progress weldIng was monItored to the fabrrcators FCAW welding procedure
specifications Weldments were Inspected for Size, length, profile and locations To the best of our knowledge, the work
Inspected IS In conformance with approved drawIngs, specifications and applicable AWS D1 1 codes Contractor was
asked to notify our office when additional services are needed
. Inspector: Chris Thomason, ICC #5069949-85
If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649
Respectfully Submitted,
Professional Service Industries, Inc.
Chns Thomason
Structural Steel Field Supervisor
c 2G Construction-Mike Kimball
Spnngfield School Dlstnct # 19-John Saracono
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
ProfeSSional Service Industries, Inc. 1040A Shelley St . Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163