Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-11-14 l.'!~-l Information ~..". .To Build On Engineering. Consulting. Testing DAILY FIELD REPORT Date Performed: November 14, 2006 Mr Enc Patterson Lrthla Toyota 360 East Jackson Street Medford, Oregon 97501 Report Number: 722-60359-11 Client: PrOject Name: Llthla Toyota - BUIlding AdditIOn 863 Main Street Spnngfleld, Oregon PrOject Location.: B.P. No.' Type of Inspection: , COM 06-0868 Soils Observation Weather: Partly Cloudy Field Observations and Comments As requested a representatIVe of PSI was on-site to observe exposed subgrade conditions for the footing line west of the eXisting bUilding The contractor excavated approXimately 1 foot of matenal 3 feet Wide between 30 and 60 feet north of the south alley way SOil probe penetrations ranged from 4 to 6 Inches In the exposed subgrade matenal Indicating a relatively stable subgrade at thiS time Informed by the contractor that they will be excavating the footing adjacent to the eXisting bUilding In sections (20 to 30 feet) and replacing Immediately with crushed rock SOils pnmanly consist of a dark clayey Silt and a qray-blue Silty clay Inspector: Anthony Deluca If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649 Respectfully Submitted, Professional Service Industries, Inc. ~an(~ '7 Department Manager c City of Spnngfleld John Hyland Construction Doug Snider Architect " THIS REPORTlS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITEO ProfeSSional Service Industries, Inc. 1040A Shelley St . Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163