September 1, 2006
S0604278.CTI
Permit No COM2005-01685
C-'Q - ,v<6tQ
FIELD INSPECTION REPORT
DATES COVERED: August 16th, 2006
PROJECT. Bayberry Commons - Springfield
ADDRESS: 2211 Laura Street - Springfield, OR
INSPECTOR: G. Keene OBOA #698
08/16/06: As requested CTI representative was on site this date for epoxy anchor
Installation for seismic holddowns (PHD2 & PHD5). Contractor installed 5/8" all thread with 6"
embedment into slab on grade. Contractor used Hllti Hy-150 Max batch #003219L4 expiration
2/2007, nylon brush and forced air used to clean holes, Contractor to re-drill (4) holes that did
not meet embedment reqUIrement, (2) In east wing & (2) in south wing tracked on NCL Item #3.
Note, holes at entryway for PHD15 appear to be diamond bit cored and the anchors are not yet
installed.
*** CHECK ONE BOX ONLY ***
1 This IS a preliminary inspection only - OR -
2 The work Inspected conforms to acceptance cntena listed above, If "No,' the portions of the
work that are non-conforming items are clearly stated above and Will be ad ded to the NCL.
Remaining portions of the work, which are not preliminary In nature, are to be considered-as
conforming ."""
YES NO
o
o ~
Our reports pertain to the matenal testedlinspected only. Information contained herein IS not to
be reproduced, except in full, without prior authorization from this office
If there are any further questions regarding this matter, please do not hesitate tOjJont this
office
Respectfully submitted, ~ ~
CARLSON TESTING, INC. "\
j
4L.~
Steven L. Dugger ~
Salem Branch Manager
GKlls
cc:
Burt Walter
City of Springfield
Diamond Engineering
Tony Koach Architect
RECEIVED
S(p 0 8 1006
Sep 06, 2006
80604278.
Carlson Testing, Inc.
Incompleted Items List (NCL)
PrOject Name
Project Address'
Pemnt No
PO No,
BAYBERRY COMMONS - SPRINGFIELD
2211 LAURA STREET - SPRINGFIELD, OR
COM2005-01685
Item # Insp.
Date
Item Description
Compliance
cn Sign-Off
1 JR 06/23/2006 MIX DESIGN 2144 NOT APPROVED
2 JR 07/19/2006 MIX DESIGN #4184 NOT APPROVED
3 GK 08/16/2006 INSTALLATION OF SEISMIC ANCHORS, (4) HOLES NEED
TO BE RE-DRILLED TO PROPER EMBEDMENT DEPTH (2)
EAST WING & (2) SOUTH WING,
CC BURT WALTER
CITY OF SPRINGFIELD
DIAMOND ENGINEERING
TONY KOACH ARCHITECT
PrOject Manager
S, DUGGER
Date
Corrected
Page 1