Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-30 (7) Carlson Testing, Inc. Main Office POBox 23814 Tlgard, Oregon 97281 Phone (503) 684-3460 Fax (503) 684-0954 Salem Office 4060 Hudson Ave, NE Salem, Oregon 9730 I Phone (503) 589-1252 Fax (503) 589-1309 Bend Office POBox 7918 Bend, Oregon 97708 Phone (541) 330-9155 Fax (541) 330-9163 Daily Report of Reinforced Concrete Client: BURT WALTER _____ _ _ Project: _ BAYBERRY COMMONS - SPRINGFIELD Address: ~211 LAURA STREET - SPRINGFIELD, OR CTI representative C BIDWELL was on site this date Jun. 30, 2006 Penmt COM2005-01685 _~_ ____ __ cn Job #: Jurisdiction: SPRINGFIELD S0604278 to perform Special Inspection for DFS #(s) SCOPE OF INSPECTION 1 Checked m WIth supenntendent or clIent representatIve Name BURT Company BURT WALTER CONSTRUCTION 2 Type of work GJ Concrete 0 Remforcmg 3 Work mcluded [X] SamplIng D InspectIOn 4 InspectIOn was 'IBC' GJ Contmuous 0 PenodIc 5 Work performed GJ In the field 0 At precast shop PO Number: CONCRETE 1 MIX DesIgn approved? GJ Yes 0 No 0 N/A 2 Momtored loads arrIvmg at Job SIte for correct MIX# 2144 Slump 4" % AIr 3 Type of samples made? 6 X 12 CONCRETE CYLINDERS Number of sets 6 Samples per set 3 4 Inspected placmg and consolIdation of appro X 600 CUbIC yards of concrete Yes No N/A LocatIOn of concrete placement [to mclude gnd lInes, elevations (floors) and drawmg detaIls] X FOOTINGS AND FOUNDATION SLAB ON GRADE 1-31 @ A-W X REINFORCING ,/ I ReVIewed prevIOUS mspectIOn reports? 2 Forms clear of debns? 3 Type, grade, SIze, quantity, spacmg and condItIon conform? 4. Venfied forms WIll nommally result m hardened concrete of the reqUIred cross-sectIOnal dimensIons 5 Venfied location of remforcmg steel, pIpes, condUIts and sleeves WIth respect to rmmmum concrete cover 6 Venfied type and locatIon of splIces, length of contact laps, and mIn dIameter of bends 7 Venfied support & anchorage of remforcIng steel In the forms 8 Venfied structural embedments In the forms WIth regard to fabncatIOn, qualIty and type 9 Venfied structrual embedments m the forms WIth regard to weld mspectIon, quantIty, and penmts Issued 10 Venfied cast In place anchors DescnptIOn of structure mspected [to Include gnd lInes, elevations (floors) and drawmg detaIls] X X X X After samples are tested, results Will follow on break report X REPORT SUMMARY Work Inspected was GJ Completed 0 In progress 2 Completed work Inspected was m complIance WIth [X] Approved plans and speCIfications 0 Shop drawmgs o RFI 0 DeSign change 0 Subrmttal 0 N/ A X X Ix Document #(s) PLANS Dated .11- 09- 05 3 NoncomplIance Item(s) were noted thiS date, detaIls on follOWIng page(s) 0 Yes 0 No GJ N/A 4 NoncomplIance Item(s) were remspected tIns date, detaIls on followmg page(s) 0 Yes 0 No GJ N/A o Conform 0 Remam m progress Report( s) findmgs were dIscussed and left WIth BURT of BURT WALTER CONSTRUCTION Based on the Code, approval IS reqUIred from the BUlldmg OffiCial before the SPECIAL INSPECTED Items noted above can be covered Carlson TestIng has no authonty to direct work of contractors or subcontractors o See addItIOnal report page(s) 0 DIstrIbute attachments Page _____1.... of ___..L Daily Report of Reinforced Concrete For: _ _~L~J2L2~Q~ CTI Job #: ~og~PJL _ ___ n Project: BAYBERRY COMMONS - SPRINGFIELD Notes: In some cases more than one box may be checked for a gIVen Item on the front page Our reports pertam to the matenal tested/mspected only. InformatIon contamed herem IS not to be reproduced, except m full, wIthout pnor authonzatIon from thIS office If there are any further questIOns regardmg thIS matter, please do not hesItate to contact thIS office Respectfully submItted, CARLSON TESTING, INe. dn ~ rV WfjJ-- Steven Dugger Manager CMB/LND CC: CITY OF SPRINGFIELD DIAMOND ENGINEERING TONY KOACH ARCHITECT