Daily Field Report
Client: Ms Kristen Karle Project: St Vincent de Paul Date: 08/03/06
St Vincent de Paul Retall/Warehouse Facility Project No . 2067065
POBox 24608 4555 Main Street Report No.: E13761
Eugene, Oregon 97402 Springfield, Oregon Inspector: D Delatte
ID No.: 1080867 -84
ICC
Inspection of: Masonry Weather. Clear Contmuous Inspection: 0
Contractor Melli Construction BP No.: COM2005-01772 Periodic Inspection 0
Performed Inspection on reinforcing steel on 8" CMU sound wall along south property
line (4'0" to top) Reinforcing steel was checked for grade, Size, lap, placement and
clearance, where applicable Cells were relatively clean and free of excessive mortar
projections Observed the placement of 7 50 cu /yds of MBI 7 sack grout In wall noted
above Grout was placed by pump and was mechanically consolidated Wall was
grouted solid Grout slump - :1:9", grout temperature - 70F, air temperature - 66F
To the best of our knowledge, the work Inspected was In accordance With plans and
applicable workmanship provISions of the I B C , except If noted above Contractor was
asked to notify our office when additional services are needed
Respectfully,
;Jt.~;~
Michael L Miler
Technical Manager
c Melli Construction
Branch Engineering
City of Springfield
MLMJw
ThiS report and/or enclosed test data IS the confidential property of the client to whom It IS addressed and pertains to the speCifiC
process and/or matenal evaluated As such, Information contained herein shall not be reproduced In part or full and/or any part
thereof be disclosed Without FEI Testing & Inspection, Inc 's wntten authonzallon