Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-7-20 1~"~tP!: ~ ~I ::.1 Page 1 of 1 11~'II~IIUII~'mIIIJ~m Geotechnical & Construcbon Sel'Vlces Daily Field Report Client: Ms Kristen Karle ProJect: St Vincent de Paul Date: 07/20/06 St Vincent de Paul Retail/Warehouse Facility Project No . 2067065 POBox 24608 4555 E Main St Report No.: E13326 Eugene, Oregon 97402 Spnngfleld, Oregon Inspector: M Meyer ID No.: 0877905-88 ICC Inspection of: Epoxy Dowels Weather' Clear Continuous Inspection: lJ Contractor: Melli Construction BP No: COM 2005-01772 Periodic Inspection 0' Performed continuous inspection dunng the Installation of three (3) #5 x 35" replacement vertical dowels In floor slab as follows one (1) at wall end near lines F4 and two (2) In pier at E6 3 Pnor to installation, the prednlled holes were cleaned With a brush and compressed air Venfled minimum embedment depth of 5" Dowels were secured With Simpson Set 22 epoxy (ICC ES ER5279, expiration date 11/07) To the best of our knowledge, the work Inspected was In accordance With EOR verbal Instructions and applicable workmanship proVIsions of the I B C , except If noted above JR (Melli Construction) was asked to notify our office when additional services are needed Respectfully, JJJ. ~~ Michael L Me~ Technical Manager c Melli Construction Branch Engineering j City of Spnngfleld MLMJw ThiS report and/or enclosed test data IS the confidential property of the client to whom It IS addressed and pertains to the specifiC process and/or matenal evaluated As such, information contained herein shall not be reproduced In part or full and/or any part thereof be disclosed Without FEI Testing & Inspection, Inc 's wntten authonzalion 7fIJ NVV Cornell Avenue Corvallis, Oregon 97330 phone (541) 757-4698 fax (541) 757-2991 29540 B Airport Road Eugene, C"::;~Ul r 97402 phone (541) 684-3849 fax (541) 684-3851