HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-8-25 ~"p~ ~7rtl 1I~'lh'llt.tl/l,m,jllJilili! Geotechnical & Construcbon Services Page 1 of 1 Report of Inspection Services Weldin~/High-Strength Boltin~ Client Ms Kristen Karle St Vincent de Paul POBox 24608 Eugene, Oregon 97402 Project: St Vincent de Paul Retail/Warehouse Facility 4555 East Main St Spnngfleld, Oregon Date' Project No.' Report No . Inspector ID No.. Inspection of. High Strength Bolts Fabncator or Erector: NW Steel Structures Contractor. Melli Construction Shop: 0 Weather: BP No.: 08/25/06 2067065 E13969 M Postler 5232606-85 ICC Field: 0 Clear COM2005-01772 Performed tension venflcatlon on the 1 1/8" A325 high strength bolts uSing turn-of-the-nut method Three bolts were Installed to a snug-tight condition In a Skidmore-Wilhelm tension Indicator, marked and turned an additional 1/3 turn To the best of our knowledge, the bolts tested Will meet and/or exceed the minimum tension requirement of 56 kips per A I S C manual While on-site, verified the bolts at each beam to column are In snug-tight condition and were marked for the additional 1/3 turn Contractor was asked to notify our office when additional services are needed Respectfully, ~h~ Dale A Webber Structural Steel Supervisor c Melli Construction Branch Englneenng City of Spnngfleld DAWJw RECEIVED SEP 0 5 2006 This report and/or enclosed test data IS the confidential property of the client to whom It IS addressed and pertains to the specific process and/or matenal evaluated As such, Information contained herein shall not be reproduced In part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc 's wntten authonzatlon 750 NW Comell Avenue Corvallis, Oregon 97330 phone (541) 757-4698 fax (541) 757-2991 29540 B Airport Road Eugene, Oregon 97402 phone (541) 684-3849 fax (541) 684-3851 63050 Corporate Place, SUite 2 Bend, Oregon 97701 phone (541) 382-4844 fax (541) 382-4846