HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-9-29
l....~.l Information
K.... 7bBuildOn
..."....,... . CwI8uIWIng . ........
Client:
Address:
Mr John Helander
Essex General Construction
4284 West 7th Avenue
Eugene, Oregon 97401
Placement Data.
6" S 0 G for basketball court
Matenal'
Location Sampled At
B 5/7
Date Cast 08/24/06 Date Rec'd, 08/25/06
Ticket No.: IMIX No : Weather
2550297 081-40N0500C Overcast
Desij:m Stren~th (psi): required 2,500
Cylmder No Test Date Age (days) , Field Cure Lab Cure
(days) (days)
06-2607 8/31/006 7 6
06-2608 9/21/2006 28 27
06-2609 9/21/2006 28 27
06-2610 Hold Hold Hold
722-60145-39
Regional Sports Center, Ph 2
Basketball Building
200 South 32nd Street
Springfield, Oregon
SPRINGFIELD OFFICE'
1040 - A Shelley Street -
,.
Springfield, Oregon 97477
(541)746-9649 ph - (541)746-7163 fax
Date: September 29, 2006
B.P. No.:
P.O. No.:
Cast By: Jerry Adams
COMPRESSION REPORT
Project No.:
Project Name:
Location:
Concrete
Load:
Total:
Supplier,
Yardage
34
348 00
Morse Bras
Slump (in.). ASTM C143
Max Aggr. Size:
Air Content. ASTM C231
Air Temperature (F)
Matenal Temp, (F): ASTM C1064
Max Temp (F).
Mm TemD (F):
Specimen Size:
Umt Weight (pct) ASTM C138
Time Cast:
Additives:
Results Reported To.
Field Test Data
4 3/4
1-1/2"
17%
67
75
6x12
Cunng Conditions,
ASTM C31
Contractor
I
Compressive Strength Data ASTM C39
placed 4,,000
Diameter or Cylinder WT Camp Strength F t T .. Capping Method
Dimensions Cross Sect Area (s I ) (Ibs) Max. Load (Ibs ) (psi) rac ure ype Test Time
(Inches) C617-ll3 C1231-03
600 2827 292 113,915 4,030 3 1031 AM I X
598 2811 293 141,750 5,040 5 421 PM X
597 2801 293 148,970 5,320 5 4'17 PM X
~
3 - Columnar 4 - Diagonal wIno craklng at ends
.. 1 - Cone (both ends) 2 - ConeNertlcal Cracks (one end)
Remarks: Set 4 of 5
c City of Springfield
Solarc Architecture - Galen Ohmart
Roy Gray
Branch Engineering - Rene Fabricant
Morse Bros
I I
5 - Side fractures (at top of bottom)
6 - Top fractures (same as #5 but end of cylinder IS pOlntec)
Re*~tfUIlY Submitted,
PI, ~~~s Industries, Inc.
SteVen E Wilder
Laboratory Supervisor
./
THIS REPORT IS PROVIDED FOR THE INFDRMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
r
V)
,
-
:J
V
l'.H.:~' ;lIrifOj n1alion
1:1:."'. To Build On
......"....1ntI · c...uflIfng · ......
Client:
Address:
Mr. John Helander
Essex General Construction
4284 West 7th Avenue
Eugene, Oregon 97401
Placement Data:
6" S,O G for basketball court
Material:
Location Sampled At:
7 3/B 5
Date Cast: 08/24/06 Date Rec'd: 08/25/06
Ticket No,: MlxNo Weather
2617500 081-40N0500C Overcast
Design Stren~th (psi): required 4,000
Cylinder No Test Date Age (days) Field Cure Lab Cure
(days) (days)
06-2611 8/31/006 7 6
06-2612 9/21/2006 28 27
06-2613 9/21/2006 28 27
06-2614 Hold Hold Hold
COMPRESSION REPORT
Project No.:
Project Name:
Location:
Concrete
Load:
Total:
Supplier:
Yardage
17
172 00
Morse Bras
722-60145-40
Regional Sports Center, Ph 2
Basketball Building
200 South 32nd Street
Springfield, Oregon
Slump (m ): ASTM C143
Max, Aggr. Size:
Air Content ASTM C231
Air Temperature (F):
Material Temp (F): ASTM C1064
Max Temp (F).
Mm Temp (F):
Specimen Size.
Umt Weight (pcf): ASTM C138
Time Cast: 6 45 AM
Additives'
Results Reported To:
c
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 ph - (541)746-7163 fax
. Date: September 29, 2006
B.P. No.:
P.O. No.:
Cast By: R Hawkins
Field Test Data
5
1-1/2"
58
71
r 6x12
Contractor
Curmg Conditions:
ASTM C31
Compressive Strength Data ASTM C39
placed 4,000
Diameter or Cylinder WT, Comp Strength F t T ..
Dimensions Cross Sect. Area (s I ) (Ibs) Max Load (Ibs ) (pSI) rac ure ype Test Time
(Inches)
602 2846 292 - 112,152 3,940 5 10 24 AM
596 2792 292 153,005 5,480 3 347 PM
598 2811 291 128,905 4,590 5 3 44 PM
, \ ,
.. 1 - Cone (both ends) 2 - ConeNertlcal Cracks (one end) 3 - Columnar 4 - Diagonal wIno craklng at ends
Remarks: Set 2 of 5
c City of Spnngfleld
Sol arc Architecture - Galen Ohmart
Roy Gray
Branch Englneenng - Rene Fabncant
Morse Bras
Capping Method
C617-o3
C1231-o3
x
X
X
5 - Side fractures ,at top of bottom) 6 - Top fractures (same as #5 but end of cylrm er IS pOlntel )
R~;~~tfUIlY Submitted,
PI 1 i;on~es Industries, Inc.
sliven ~lIder
Laboratory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES I
l.'~;l: lriformiltion
~~. ~To Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed: September 15, 2006 Report Number: 722-60145-45
Client: Mr John Helander Project Name: Regional Sports Center, Ph 2
Essex General Construction Basketball Building
4284 West 7th Avenue Project Location: 200 South 32nd Street
Eugene, OR 97401 Spnngfleld, Oregon
P.O. No.: Permit No.:
Type of Structure: Weather: Overcast
Type of Inspection: Structural Masonry
Field Observations and Comments
. Performed visual Inspection of reinforcing steel In the following locations top out IIft-gndllne A/5-12, second IIft-gndllne
A/12-17 Reinforcing steel was Inspected for Size, grade, lap, placement and clearances where applicable
Reinforcing steel was placed In accordance with approved deSign draWings and speCifications as well as detail 07/04,
All cells were relatively clean and 'mortar projections are within the limits of the International BUilding Code Performed
continuous Inspection dUring placement of grout In the locations listed above, Grout was placed by pump and
mechanically consolidated Only cells containing reinforcing steel were grouted solid Empty cells were filled with wire
mesh Note one set of solid and one set of hollow prisms were picked up for compression strength testing To the best
of our knowledge, the work Inspected above was In accordance with the bUilding department approved deSign
draWings, specifications and applicable workmanship prOVISIons of the InternatIonal Building Code Contractor was
asked to notify our office when additional services are needed
Tvoe of Material Grout
Supplier Morse Bros
Mix # 247KG3ROOO
Slump 8-3/4"
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (PSI)
Number of Samples
Total Yardage Placed
Inspector: Jennifer Tran, ICC# 5282553-84
If you have any questions regardIng thIS report, please feel free to contact us at 541-746-9649
700
770
12 45 PM
2500
4 yds
Respectfully Submitted,
Profess n~~ustries, Inc.
, ~ II-
ran
nt Manager
c City of Springfield
Sol arc Architecture - Galen Ohmart
Roy Gray
Branch Engineering - Rene Fabricant
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY MHHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
ProfeSSIonal ServIce Industries. Inc - 1040A Shelley SI . Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163
l ra~.l Info. ..1ation
I:!!...,. To Build On
...."....Ing . Con8uff.fng . 1IMtfng
Client:
Address:
Mr John Helander
Essex General Construction
4284 West 7th Avenue
Eugene, Oregon 97401
Placement Data:
6" S 0 G for basketball court
Material:
Location Sampled At
Near Lines 9 5/B 8
Date Cast 08/24/06 Date Rec'd, 08/25/06
Ticket No, MixNo Weather'
2550266 081-40N0500C Overcast
Desi~n Stren~th (psi): reauired 2,500
Cylinder No Test Date Age (days) FIeld Cure Lab Cure
(days) (days)
06-2607 8/31/006 7 6
06-2608 9/21/2006 28 27
06-2609 9/21/2006 28 27
06-2610 Hold Hold Hold
COMPRESSION REPORT
Project No.:
Project Name:
location:
Concrete
Load:
Total'
Supplier,
Yardage
3
3000
Morse Bras
722-60145-38
Regional Sports Center, Ph 2
Basketball Building
200 South 32nd Street
Springfield, Oregon
Slump (in ): ASTM C143
Max, Aggr. Size:
Air Content: ASTM C231
Air Temperature (F).
Material Temp, (F)' ASTM C1064
Max Temp (F):
Mm Temp !F):
Specimen Size'
Umt Weight (pct), ASTM C138
Time Cast. 5 20 AM
Additives:
Results Reported To,
SPRINGFIELD OFFICE
1040 - A Shelley Street.
Springfield, Oregon 97477
(541)746-9649 ph - (541)746-7163 fax
Date: September 29, 2006
B.P. No.:
P.O. No.:
Cast By: R Hawkins
Field Test Data
4 3/4
1-1/2"
58
73
6x12
Curing Conditions:
ASTM C31
Contractor
.
Compressive Strength Data ASTM C39
placed 4,,000
Diameter or Cylinder WT Comp Strength F t T .. CapPing Method
Dimensions Cross Sect Area (s i ) . (Ibs) Max Load (Ibs ) (pSI) rac ure ype Test Time
(Inches) C617-03 C1231-03
602 2846 292 120,055 4,220 5 10 44 AM X
599 2821 293 159,470 5,650 2 3 37 PM X
600 2827 295 152,810 5,400 2 3 40 PM X
\ I I
** 1 - Cone (both ends) 2 - ConeNertrcal Cracks (one end) 3 - Columnar 4 - DIagonal wIno crakrng at ends
Remarks: Set 1 of 5
C' City of Spnngfleld
Solarc Architecture - Galen Ohmart
Roy Gray
Branch Englneenng - Rene Fabricant
Morse Bras
5 - SIde fractures (at top of bottom) 6 - Top fractures (same as #5 but end of cylinder IS porntec)
Re)f~~~~"Y Submitted,
p, i ~~ndustries.lnc.
S~~en E Wilder
Laboratory Supervisor
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES