CITY OF SPRINGFIELD
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
AUTHORIZATION TO PROCEED AGREEMENT
THIS AGREEMENT is entered into this rOL1_ day ofL NY\;\0t\ J , l4d, by and
between the Ci ty of SPringfieldesa,mUnNJlal F.ou>orJti~h) ot the Sta te ~ Oregon,
hereinafter called City"and\. fY\ -\4'1..L&..~ , hereinafter called
the Applicant.' .,
YHEREAS, the applicant has applIed to the City Community~ervices Building
Division for issuance of certaiEl f9i1~U~n p.ermi~~ for dev~lopment
improvements to be located at III' "~\~>H\.LD.../ Springfield,
Oregon or within 'the City's Urban Gr j~r~aik 'onal Area~Lane County
Assessor's Map and Tax Lot number I (156JC.J n{'ft{J-\ .
-
~HEREAS, the applicant has asked the City to authorize the Applicant to
immediately commence development improvements ~ithout a completed plan revie~ or
subsequent approval as required by the Springfield Building Safety Code
Administrative Code section 303(a).
VHEREAS, the Applicant has submitted to the City a completed permit application,
3 ,(three) sets of construction drawings, specifications, and other data'required
for the City to complete the necessary plan review of the proposed development
improvement.
VHEREAS, the intended development improvement is of a nature that requires no
other review approval from other State or local agencies and is exempt from the
criterin established by the Building Safety Division, attached as Exhibit A of
this Agreement.
YHEREAS, the City has not reviewed or approved the submitted materials for the
development improvement, the City is therefore unable to confirm at this time
whether the permit applicati~~ submitted will be approved, and whether the
~equired construction permits can be issued.
VHEREAS, the applicant has requested the City to provide expedited authorization
to proceed ~ith certain phases of construction prior to the completion of the
City's review of the permit application.
~HEREAS, the City'S fee for the administrative services rendered in providing
expedited authorization is $150.00.
.
NO~, THEREFORE, in consideration of the foregoing recitals and of the mutual
promises contained herein, the City authorizes immediate commencement of the
development improvement specified in the permit application subject to the
follo~ing terms and conditions:
~.
.
.
Authorization to Proceed Agreement
Page 2.
1. City agrees that the Applicant may immediately commence with the
development improvements set forth in the permit application. City's
authorization to proceed is conditione~ however, upon Applicant's agreement
that the project will be constructed as set forth in the attached submitted
drawings and specifications, except as may be modified' by City, and ~ill
comply with all applicable la~s and ordinances, Applicant's immediate
commencement of construction is at Applicant's own risk. The City makes no
assurance that the development or construction improvements vi~~ be approved
or the required construction'oermits viII later be issued.
2. City agrees to review Applicant's permit applicatiDn in the normal revie~
process and to thereafter: .
a) issue Applicant the appropriate construction permits; or
b) advise Applicant of deficiencies in the proposed construction which
must be remedied before permits can be issued; ,or
c) advise Applicant of any statutes, ordinances or code provisions with'
which Applicant must comply ~ith before City can issue the permit.
3. Applicant agrees that if City finds Applicant's permit application and
submitted materials inadequate or deficient ln any manner including but not
limited to, the application or the proposed construction do not comply with
all applicable statutes, ordinances or code provisions, ,Applicant will
expeditiously cure the deficiencies so that the City may issue the required
permits. Should Applicant fail to expeditiously correct submitted materials,
or should correction prove impossible, City may in it's discretion, take any
or all of the following actions:
a) stop all further construction of the project in the manner prescribed
in the Springfield Building Safety Code Administrative Code (BSCAC),
-SECTION 201 (d)
b) order disconnection of serving utilities in a manner as prescribed in
BSCAC, SECTION 201 (f)
c) issue a NOTICE l~D ORDER for removal of all such ~ork in a manner as
prescribed in BSCbC, SECTION 204. ABATEMENT OF UNSAFE, SUBSTANDARD OR
DANGEROUS BUILDINGS, STRUCTURES OR BUILDING SERVICE EQUIPMENT. Upon
receipt of such notice"Applicant shall immediately remove the work
specified in the Notice and Order.
4. Applicant agrees, if the issuance of the permit is denied:
..
a) to remove, at the Applicant's sole cost and expense, all completed
construction or improvements; and
b) to restore the site or structure to it's pre-agreement condition and
free of all hazards
~,
.
.
Authorization to Proceed Agreement
Page 3.
5. Applicant agrees that until Applicant's permit application is approved,
construction vill not to proceed beyond the point of authorization approved
~~~~': Bu~lding Official. Appliyan~ Point of Authorization is ___
.9~fiY ~., '?/~ ?/7'A.///-=-=- .
6. Applicant agrees that all ~ork performed under this agreement shall be
accessible and exposed for inspection purposes and that neither the Building
Official n6r'City shall be liable for the expense entailed in the removal or
replacement of any material necessary to allov inspection.
7. Applicant agrees that any or all'deficiencies identified during the
necessary inspections viII be promptly remedied, at Applicant's sole cost
and expense before proceeding ~ith any further construction. Applicant also
agrees that these inspections do not replace the required plan reviev nor do
they imply any approval of the submitted materials.
8. Applicant agrees that no vork shall be done on any part of the building
or structure beyond the point indicated in each successive inspection
vi thout first obtaining the approval of' the Building Official. Such approval
sharI be given only after an inspection has been made of each successive
step in the ,construction as indicated on the attached Exhibit B.
9. Notvithstanding any other provisions of this Agreement, this Agreement
shall terminate upon issuance of a building permit or thirty (30) days from
the date of this Agreement, ~hichever first occurs. Applicant understands
that all vork on the project shall immediately cease vithout any notice from
the City if this Agreement terminates ~e a build~~E permit is issued.
This agreement shall terminate on VC _~~S/
, , ,- &'-1 tt\
10. Applicant agrees to defend, indemnify and hold elty harmless from any
and all costs (including 'attorney fees), liability or damages of any kind or
nature ~hatsoever, for personal injury and property damage arising from the
Applicant'S early commencement of construction and the ~ork undertaken or
completed. '
,11. The terms of this Agreement shall extend to and be binding upon the
parties hereto and t:,eir heirs, successors and assigns.
,
~
12. If any suit, action or other proceeding, or an appeal therefrom, is
instituted to obtain, establish, enforce, or compel any right or obligation
resulting from this Agreement, the,prevailing party shall 'be entitled to
recover from the adverse party, in addition to costs and disbursements, such
additional sums as the courts, both trial and appellate, may judge
reasonable attorney fees.
..
'---.1
.
.
Authorization to Proceed Agreement
Page 4.
BEFORE SIGNING THIS AGREEMENT, PLEASE READ AND UNDERSTAND THE MEANING OF EACH
PARAGRAPH OF THIS AGREEMENT. IT AFFECTS YOUR INTERESTS IN THE PROPERTY AND, IN
THE EVENT OF DEFAULT, IT PLACES YOU PERSONALLY AT RISK AND THE SUBJECT PROPERTY
AT RISK OF FORECLOSURE FOR COSTS AND EXPENSES INCURRED BY THE CITY IN ENFORCING
THE TERMS OF THIS AGREEMENT.' IN THE EVENT THAT YOU DO NOT UNDERSTAND ANY TERMS
OR CONDITIONS OF THIS AGREEMENT, PLEASE SEEK ANY LEGAL OR OUTSIDE OPINIONS YOU
MAY.DESIRE.
CITY
" APPLICANT
Contractor 13C~ L:'~/.&:"
Business Name ~/V~ ~~;z:> ~-f!. ~......~
~/,?~,.,f' ~~c::. ~~ ' _
Address ;' ~-:;.~...:-c L!P)iq -9:> ~
7 ,
CC Registration 1I ~"::>..:>...t., a--~ /.-/;' '/7'"
- , .
LAND/PROPERTY u."",,(S)
I/VE HAVE READ THE ABOVE AUTHORIZATION TO PROCEED AGREEMENT. I/VE UNDERSTAND
VHAT IT EXPRESSES AND THE RESPONSIBILITIES IT PLACES UPON US AS ,THE
LAND/PROPERTY OVNERS. I/VE AGREE TO BE BOUND BY ALL TERMS AND CONDITIONS OF THE
AGREEMENT. '\ {24
Name \~~ ,j ,
Address ( ImJ ~ :tP~
V8.t~e;1 a!-"9'7~-z--
,
~
6 F:EV;E\'J~[; [J~ f-.P?t=:C'VcD
~'~:~:~:~[',' j '--~t\.(
C/:i'E: h=-,~ V\. \ '\ '\ :::.
C::Fi:'::: c.~:- CITY ATTOhl"'~EY
C~-:-\.' :=.;: ~'~":::l:,~~:::-!~LD
..
--
.
.
EXHIBIT A
Purpose
Tne purpose of this agreement is to allow'certain development improvements to
occur prior to obtaining plan revie~ approval from the Springfield Community
Services Division.
Scope , '
Tne use of 'this 'agreement shall be limi ted to certain one and tvo-family
dwellings not complex in nature as determined by the Building Official and
minor alterations or modifications to existing commercial and industrial
buildings which are of a non-structural'type and do not adversely affect any
structural member of the building or any part of the building having fire
resistant construction.
One and two-family dwelling plans for structures that are complex in nature that
have been prepared'by an Oregon'licensed architect or engineer and accompanied
by a letter of review prepared by said architect or engineer, stating that the
submitted material is in compliance with the One and Two-Family ~elling
Specialty Code, may be considered eligible fo~ this agreement.
The following items include but are not limited to certain conditions of
development identified as ineligible for this agreement:
a) development requiring site approval which has not been obtained;
b) new development lo~ated on land with over six-percent slope;
t) lots having expansive (clay) soil;
d) development located within flood hazard areas;
e) development located within wetland areas;
f) pole buildings or other such type of structure that is not of conventional
construction.
,
,-
.