Loading...
HomeMy WebLinkAboutPermit Building 1992-7-1 COMMERCIAL/INDUSTRIAL. PERMIT APPLICATION ~ . JOB NUMBER Q'2Q2ZL 225 Fifth Street, Springfield, Oregon 97477 INSPECTION LINE: 726.3769 OFFICE: 726,3759 LOCATION OF PROPOSED WORK' ~Ob lU, t=.Al~VI(;-W S, ASSESSORS MAP' !~I!] 2."1 4/ OWNER:~:o.. ,f, (GoJ. ,]j,}('" L"1I b.'~ ADDRES!'" 7.7~1 p.. . J1~--r- CITY: S~('"_i=-/t:...,_J-, ---- '-""rF-!oJc~r=",:;. L ,i') TAX LOT: /e/ PHON'" 74-7 . ZA'7~C; STATE: c)'!? ZIP: ~74-f7 " MrTNiLJA,f). ~.e..T~Rl~ ('i, VALUE: IO./~ ,Mr. I DESCRIPTION OF WORK: (Jill IT'( ~lJ.. NEW I-- REMODEL ADDITION "':"c> Cn:..,.I~ "":<'- DEMOLISH OTHER NAME ADDRESS ARCHITECT: .1&.=-"1 ( 5r~Ul j7 i C7<=-<:,~_ (-:;,9 fA)' 1"Z.-n-\ f=:u,-;.r;;W'''' I CONST, CONTRACTOR'S NAME ADDRESS CONJl1ACTOR # GENERAI'hP'~~tr'~A~.c-~._ ~~~4I''-J";> S~ PLUMBING' PHONE "":>M ,-,~ ~ EXPIRES PHONE 7-7/-"'" "'5 V7'-;;>/7'? ... i MECHANICAL' ELECTRICAL' I PLUMBING I NO, FEE CHARGE I Single Fixlure I Relocated Bldg, {new fix, addtll I /7'~ / Water Service 710 II. 1/ ;?&I Sanitary Sewer ya II. I~I Storm Sewer 7t' II. I Backftow Device MECHANICAL "'n cc" I , ("HARG, Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit healer Appliance Vent separate Stal ionary evap. cooler Vent Fan/Single duct Vent System apart from AC or hlg, Mechanical exhaust hood and duel Permit Issuance $10,00 TOTAL PERMIT /1?t:? Q::> TOTAL PERMIT OUAD ~REA: ~n )( J) - OFFICE USE - LAND USE:~~q~ HANDICAP ACCESS: FLOOD PLAI~', - ZONING: vU) # OF BLDGS' # OF UNITF' OCCY GROUP' CONSTR, Type, LIGHTING POWER BUDGET: # OF STORIEF' HEAT SOURCE: WATER'HEATER' SO, FT, $/SO, FT, VALUE SO, FTG MAIN X SO, FTG ACCESS X ~ SO FTG OTHER ~/,~ /~~? OpC/ //cr;;:s; fJ\/'r TOTAL VALUE OF PROJECT-'/;;?,"? <::/'~ . PLAN CHECK FEE ---2/ ,~) RCPT# 4:!> II' DATE ~/ ~ '7 z.. BY ~ I BUILDING PERMIT 15% Stat.e SurcharQe I MECHANICAL 15% State SurcharGe I PAVI NG PLUMBING 1 "52:>, "e> 7. ?,D I DEMOLITION I I ~S",.r& ~kY~ I ~~-r - Z80 1 sliBTOTAL /~? c:'>-\ PERMITS 7',. /~ 1 SYSTEMS DEVELOPMENT 5% State SurcharQe FENCE VALUE $_ SIDEWALK 1 FT, 1 F.T, I. I CURBCUT TOTAL PERMIT FEES I EXCLUDING ELECTRICAL /y~ 7?' ~- . REQUIRED INSPECTIONS . It is the respo'nslbility of the permit holder to see that alllnspectlons are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, , ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these \..,. inspections have been made and approved. PAVING: After gravel is in place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made atter trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are In place but before any concrete is placed. FRAMING:To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P'S,L (306 a,1) STRUCTURAL WELDS: Performed on the job, (2722 f) y UNDERGROUND: 'Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be. made after'all' Insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied, ' FIRE & SEPARATION WALL: Located and constructed according to plans. ~IGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) SPRAYED ON FIREPROOFING: U,B.G. Standards 43-8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor I nsulatlon, decking or floor sheathing. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) ,FLOOR INSULATION & , VAPOR BARRIERS: To be made prio'r to installation of deckingor floor sheathing, LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any plastering Is applied or before gypsum board Joints, and fasteners are taped and finished, GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS, 25,10,11), ' POST & BEAM: To be made prior to installation of f/o'or insulation, decking or floor 'h sheathing. STRUCTURAL MASONRY: (306 a,7) MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415, ;:,3..~r,,\ ','~'; .f '<":i','t",ilOOF"SHEATHING AND :,\;'.} ., NAILING: Prior to installing any,roof cove~lng. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, .to be made after all excavating complete and form work and sub.base material in place. .. In addition to the inspec. tlons specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. ------------------------------------------------------- .' .. '. . FINAL PLUMBING FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting thIs inspection. FINAL BUILDING: Requested after the final plumbing, electrical, FINAL MECHANICAL mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division FINAL FIRE DEP~MENT .l.L (J. and posted on the premises, C\ AI\.... ........-lr- ADDITIONAL COMMENTS:U2.C\,~ -} \. ()l, \ \ \ ., pi ('\ f\nOr . N\ Q ')l l\.1U<:H ~j " d,... ~ L\ 2.:C<o, \ \?_J ~ ~J PLANS REVIEWED BY /~ ~~.--? DATE-6-22-q?~ r /r . ~./;/ By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times during constructl . , ./2./7 ~ SignaturQ;" ~:__..~~~ Date 7-/-9..::<.. RECEIPT .' /1/9: 7C::> ~// DATE PAID: RECEIVED BY: ~-/-q-::2-. ~- VALIDATION: AMOUNT RECEIVED: '\