HomeMy WebLinkAboutPermit Building 1992-8-21
C~rJf&eRCIALlI N DUSTRIALa
PERMIT APPLICATION
· JOB NUMBER L18{)IJt}.L
INSPECTION LINE: 726.3769
pFFICE: 726,3759
MJ )(011)
SPRINGFIELD
1/)
J
TAX LOT'
OWNER' '\'\. ~0 ['L Q\, }: 1 I\ 01'\( \ ./
ADDRF"",d)c<) I i ~ \. ~ 0 0 1-
CITY' ,,~'J L J .rv.
. J\}
DESC~IPTJPN OF WORK\. Xi\ ()111 In ~
NEW \.11 REMODEL ADDITION DEMOLISH
I
rYJ \c,\
PHONE: 14\ -A40l5
STATE: {0J[';;zIP:-.9.(41t
(I V f) f)[Y l~ '"
OTHER
-
=fbLt ;VtJt'JZld.2L,
VALUE:
ARCHITECT:
CONTRACTOR'S ,NAI4.E
GENERAL: ~ jll )
&Rt;~(101~
;~~~A.q9'l' tlf~ tZl/' /
'ft'('):j / /0' . ~ 'IJ-7/1~
/J Dj
PLUMBING:
MECHANICAl'
Qi ~iV' ' ffiO~~, ~f' '
ELECTRICA' '
PLUMBING
MECHANICAL
I
I
I
I
I
I
I
I
I
I
I
NO,
NO
FEE
CHARGE
Single Fixture
Relocated Bldg,
(new fix. addtl)
Water Service
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
> 100,000 BTUs
ft.
Floor furnace and venl
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stat ionary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Sanitary Sewer.
Storm Sewer
It.
It.
Backflow Device
TOTAL PERMIT
I
I
I
I
I
TOTAL PERMIT
Permit Issuance
QUAD AREA\ ~J\ 1~
- OFFICs"UP-tr--,.
LAND US.' O~
...
I
"HARGi
I
I
I
I
I
I
I
I
I
$10,00 I
I
FLOOD PLAIN'
HANDICAP ACCESS:
. OF BLDGS'
. OF UNITS'
ZONIN'"
OCCY GROUP'
CONSTR. TYP.'
. OF STORIES: ,
HEAT SOURC.'
LIGHTING POWER BUDGET:
WATER HEATER'
SO, FTG MAIN
~ Ney\t:~(\Lx
ff)~rN)
$/SQ, FT,
SO, FTG ACCESS
x
SO, F~G OTHER
x
,z;,~ ___ OC)
TOTAL VALUE OF PROJECT _~,!~.r /.
PLAN CHECK F~ 2g. 93
RCPT'
OAT.
BY
I BUILDING PERMIT
5% State
SurcharQe
MECHANICAL
I PLUMBING
I DEMOLITION
-V7(S~
~_ Z 3'
5% State
Surcharoe
FENCE
VALUE $_
SIDEWALK
~~
I SUBTOTAL
PE RM ITS
I SYSTEMS
DEVELOPMENT
I' 5% State
Surcharae
I PAVING
FT,
CURBCUT
FT,
TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
9..,:7.~O
/~b. ?3
~?O
/~/b5:%
\,
<I' . REQUIRED INSPECTIONS . ,..,~~
, ,\ , . . '-)
it'ls the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will ~~ made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be ,,"
made after excavation, 'but'
prior to setup of forms.
\
\
UNDERSLAB PLUMBING,
, ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
'ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved. '
,~
PAVING: After gravel is in
place but~prior to placing
asphalt or concrete.
)(
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing insp~ctlon. ;)~\ ~;
_ 1'. ..,'
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special i~spector shall be employed
by the Owner! Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
, "
'STRUCTURAL CONCRETE: In
excess of 2500 F'S,I, (306 a,1)
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved:
STRUCTURAL WELDS:
Performed on the job, (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and reQui"red vapor
barriers are in place but
before any lath or gypsum
board interior wall covering Is
applied, .
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a,6)
SPRAYED ON
FIREPROOFING: u'se,
Standards 43.8,
UNDERFLOOR: Piumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing,
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a,11 &
Chapter 29)
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing,
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is In
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
finished,
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed, (2501 u'S,C,
STDS, 25.10,11),
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing,
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
X'
STRUCTURAL MASONRY: (306
a,7)
'~~''LP;'''0,Q'~~~ r
lL>.~".,,:'~
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
USC 2415,
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
.In addition to the inspec-
tions specified, the Building
Official may make or require
other Inspections of any
constructlon work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
X SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL ELECTRICAL
FINAL MECHANICAL
x
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Bui/ding Division
and posted on the premises.
Y FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS:
W~~0\'d 'DD.II R. -( J)\[)J\0\tt.. Jill1J ~t
, PLANS REVIEWED BY ~~'- ~- / DAF "R~-51=<
"// . /, - .
By signature, I state and agree, that I have carefully examined the complet~d appli~ation and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be u~ed on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the
street, that thfP mlt c~rd i located at the front of the property, and the a~p'roved set of plans wltl remain on the site at all
times during c tructlon. '. ~
Signaturp ~ ~ Dat.. &'1 If'/->
1\'1- I _' J
VALIDATION: ' v AMOUNT RECEIVED: (-5w,' /..:) DATE PAID: C::5 t)( .C.fW
RECEIPT ': ,~"Lf 8!..).. RECEIVED B~II ~
WG Pd
p, ,9-D.qr--#,-~71
",,'
. .OB NO. qZ.O'" I.
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
(COMMERCIAL & RESIDENTIAL)
NAME OR COMPANY: \<'11:>'7.!;- K, t-l l~c.. ,
....',
LOCATION: ~t")o \1.,,', ~A-\~,I\~~....I \-'0=-'2.1 '+1 - 0010 I
DEVELOPMENT TYPE: Q.c..., t-.lEJIJ MODU L-~IL 0-t..A4he.oO "^~
"" '-t> (, Va l>-G+\
BUILDING SIZE: (.,0.,(4"2- 1?11"Z. LOT SIZE
1. STORM DRAINAG~
IMPERVIOUS SQ. FT. . -z.<.o \ C:. X $0.192 PER SQ. FT.
:SQ. Ft.
c-"50'L 1-J)
'''-- -
2. ~ANITARY SEWER-CITY
NO. OF PFU' S ~ '2- X $39.78 PER PFU
(See Reverse)
~'b1'2-q;;
"-- ---
3. TRANSPORTATION
NO OF UNITS X TRIP RATE X COST PER TRIP
X $401. 05
~1<tf>~
"-. .-
$
\ ."i'!>'1- X Ib
X
X $401.05
X
X $401.05 $
SUBTOTAL (ADD ITEMS 1,2, & 3) $ q ?Z:~ ~
4. ADMINISTRATIVE FEES
BASE CHARGE (SUBTOTAL ABOVE) X .05
c:;- '41(" I!)
-----
TOTAL-CITY SDC $ Cj9<=19~
5. SANITARY SEWER-MWMC
NO. OF PFU'S \J,A. x $13.62 PER PFU + $10 MWMC ADMIN. FEE $
(Use PFU Total From Item 2 Above)
~
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
~~LvL
G Ki P Burdi ck
SDC Coordinator
9:, I, '0 /4'/..-
I
$
TOTAL-MWMC SDC~~ ~
, ---
TOTAL SDC $ 9~qq1~
FIXTURE UNIT CALCULATI! TABLE: Number of New Fixtures X u.qUivalent = Fixture Units (NPTE;
For remodels. calculate only the NET additional fixtures)
FIXTURE TYPE
NUMBER OF
NEW FIXTURES
UNIT
EQUIVALENT
FIXTURE
UNITS
?
4-
2
1
2
3
6
2
6
6
1
3
2
1/Head
2
2
1
6
4
:.z"
Bathtub.. ...... ............... .............. ..........,.......... ,...........
Drinking Fountain....,..,......,.........,..,....,.,..,."..,...,',..,
Floor Drain....,...,..,....,..,......,..",....,....,.......,",...,..,',..
Interceptors For Grease/Oil/Solids/Etc.................
Interceptors For Sand/Auto Wash/Etc..............,..,
Laund ry Tub /Clotheswasher..,....,.,.............,...,.."..,
Clotheswasher - 3 Or More.....................................
Mobile Home Park Trap (1 Per Trailer).................,
Receptor For Refrigerator jWater Station/Etc........
Receptor For Commercial Sink/Dishwasher /Etc..
Shower, Single Stall.,....,....,.",..,..,..,.""",.,..".",,",.,
Shower, Gang.."....,.".,..,...,....",..,..,',..,..,.,",..,',.."..
Sink, Bar, CommerciaL,.,.",..".",.""""""..,.."..,..""
Urinal, StalljWall"".,..,..,.."....."" "".." "."", ",.".."""
Wash Basin/Lavatory, Single..................................
Water Closet, Public Installation.............................
Water Closet, Private........................... ..................,
Miscellaneous:
?
2..'-\
TOTAL FIXTURE UNITS
::>:>7.
CREDIT CALCULATION TABLE:
calculate credits separates,
I A~~:ed
1
Based on assessed value. If improvements occurred after annexation date in table,
Rate per $1,000
Assessed Value
Year
Annexed
Rate per $1,000
Assessed Value
I
"
1979 or before
1980
1981
1982
1983
1984
S2,83
2,76
2,71
2,60
2.46
2,33
1985
1986
1987
1988
1989
1990
1991
$2,16
1.90
1.60Lj
0,25
0.87
0.50 \I
0,16 d
Improvement (if alter annexation date)
X $
(Rate X Assessed Value)
X $ =
(Rate X Assessed Value)
CREDIT TOTAL = $
Credit for Parcel or Land Only If Applicable
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
ResidentiaL,.."..,...",...,....,....".. ......,.,....,..,..,.... 0.4
CommerciaL.."..................,...,..,....,...,......"...,.. 0,9
I nd ustrial..."..,."..,..,......,."..",..,..,.".,..,.....,..".., 0,45
Governmental......"......,..,....,..,.."".."....,.,.,""" 0 ,5
IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT