HomeMy WebLinkAboutPermit Building 1996-5-10
Page 1
RESIDENTIAL PERMIT APPLICATION
CITY OF SPRINGFIELD
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
Job Number: 960313
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 629 FAIRVIEW DR
Assessors Map #: 17032742
Lot: Block:
Tax Lot #: 02300
Subdivision:
Owner: TERRY/DEANNE URMSON
Address: 4750 FRANKLIN #F15
Phone #: 746-6460
City/State/Zip: EUGENE, OREGON 97403
Describe Work: MANOFACTURED HOME
NEW
Contractor
Const.
Contractor #
Expires
Phone
General: HARDACKER & OLE 0079496
83278 N 6th St Creswell OR 97426000
Plumbing: VOS PLUMBING 0041805
PO Box 2189 Eugene OR 974020000
Electrical: ARC ELECTRIC 0000603
85783 Hwy 99 South Eugene OR 974050
02/19/97
952-8229
04/04/96
485-0551
12/16/96
741-0494
QUAD AREA: 1RNW
# OF UNITS: 1
CONSTR. TYPE: VN
WATER HEATER: E
OFFICE USE --
LAND USE: 1111
ZONING CODE: LOR
# OF BDRMS: 3
RANGE: E
# OF BLDGS: 1
OCCY GROUP: R3
HEAT SOURCE: FE
SQ FOOTAGE: 1620
To request an inspection, call the 24 hour recording at 726-3769.
All inspections requested before 7:00 a.m. will be made the same working day,
inspections requested after 7:00 a.m. will be made the following work day.
REQUIRED INSPECTIONS
PEDESTAL - Prior to cover.
FOOTrNG - After trenches are excavated.
WATER LINE - Prior to filling trench.
SANITARY SEWER LINE - Prior to filling trench.
STORM SEWER LINE - Prior to filling trench.
MANOF HOME/MOBILE HOME SET UP - When all blocking is complete.
MANOF. HOME/MOBILE HOME ELECTRICAL - When blocking, setup, and
plumbing inspections have been approved and home is connected to panel
MANOF. HOME/MOBILE HOME PLUMBING - After home has been connected to
water and sewer.
FINAL SET UP - After all required inspections are approved and porches
skirting, decks, venting, house numbers, etc. have been installed.
Lot Faces: N
Setbk From NPL: 37
Lot Sq. Ft.: 4928
Solar Approved: Y
Total Height: 15
Lot Type: INTERIOR
House
N
30
Setbacks
S W
10 8
E
14
Item
Main
Garage
FTG/PERIM FOUNDATION
BUILDING PERMIT
Square Feet x
$/Square Feet
Value
45.000.00
0,00
3,500.00
Job Number: 960313
Page 2
Total Value
48,500.00
Building Permit Fee
Surcharge/Admin
44.50
3.57
TOTAL FIlIl
(A)
48.07
--- SYSTIlMS DEVELOPMENT CHARGIl (SDC) ---
(B) 2,189.30
Systems Development Charge is due on all undeveloped properties within the City
limits and the Citys Urban Growth Boundry which are being improved.
--- PLUMBING PIlRMIT ---
Item
Sanitary Sewer
Water
Storm Sewer
Fee
25,00
25,00
25.00
Plumbing Permit
Surcharge/Admin
75.00
6.00
TOTAL CHARGIl
(C)
81. 00
--- MISCIlLLANIlOUS PIlRMITS ---
Mobile Home
State Issuance
Surcharge/Admin
WILLAMALANE SDC
ELECTRICAL PERMIT
105,00
20.00
8.40
1,000.00
86.40
TOTAL MISCIlLLANEOUS PIlRMITS
(Il)
1,219.80
(Excluding 1l1ectrica1)
unless otherwise noted
TOTAL AMOUNT DUE
(A, B, C, D, and Il combined)
3,538.17
--- BUILDING VALUE, PLAN CHECK AND BUILDING PIlRMIT ---
This permit is granted on the express condition that the said construction
shall. in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Development Code, regulating the construction and
use of buildings, and may be suspended or revoked at any time upon violation
of any provisions of said ordinances.
Received By:
Plans Reviewed By: LISA HOPPER Date: 05/07/96
Building Site Reviewed By: LISA HOPPER
- - - ADDITIONAL COMMENTS
PARTITIONAL APPROVAL RECEIVED 5/7/96
32 SQ FT STORAGE STRUCTURE RQD PRIOR TO OCCY
SPRINGFIELD
Job Number: 960313
Page 3
DRIVEWAY REQUIRED TO BE PAVED
1 STREET TREES REQUIRED
By signature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all information hereon
is true and correct, and I further certify that any and all work performed
shall be done in accordance with the Ordinances of the City of Springfield,
and the Laws of the State of Oregon pertaining to the work described herein,
and that NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701,055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that each address is readable from the street, ~hat the permit
card is located at the front of the property, and the approved set of plans
will remain on the site at all times during construction.
\/ ~ l.m ~/('
fiite I
- -- VALIDATION
Receipt Number:
Z150?
5-IO-Q0
17
Date Paid:
Amount Received: ~ 3 53 5S"
Received By:
1/12---
.
SPR.FIELD
DEVELOPMENT SERVICES DEPARTMENT
225 FIFTH STREET
SPRINGFIELD, OR 97477
(541) 726.3753
FAX (541) 726-3689
MANUFACTURED HOME SET-UP AGREEMENT
As required by the City of Springfield Development Code, 1 understand and agree that with the approval of
the attached p~rmits.z" one of the following manufactured homes will be placed-at ll!L C\
~ \ 1\ \1\ 011 ) . Springfield, Oregon, City Job Number ~ \ -:l.. . .
Type I Manufactured Home:
A multi sectional (double wide or wider) unit with an enclosed floor area of not less than 1,000 square feet,
that has a nominal roof pitch of3 feet in height for each 12 feet in width, that has no bare metal siding or
roofmg, and that has been certified by the manufacturer to have an exterior thermal envelope meeting
performance standards which reduce heat loss to levels equivalent to ~.I rformance standards required
for single family dwellings at the time of construction, ~ initials
Type II Manufactured Home:
A unit of not less than 12 feet in width enclosing a minimum floor area of 500 square feet, that has a
nominal roof pitch of2 feet in height for each 12 feet in width, that has no bare metal siding or roofmg,
and that has been certified by the manufacturer to have an exterior thermal envelope meeting performance
standards which reduce heat loss to levels equivalent to the performance standards required for single
family dwellings at the time of construction. \ initials '
I further state, by my signature below, that I have been provided with the following information:
Manufactured Home Blocking, Water Line Connection, Street Tree Standards, Sanitary Sewer Comiection,
Electrical Connection, and Minimum requirements for permanent steps.
1 also understand that the manufactured home shall be placed on an excavated and backfilled foundaticm
not to exceed 6 percent slope within 10 feet of the perimeter enclosure, enclosed at the perimeter with
stone, brick or other concrete or masonry materials approved by the Building Official and with no more
than 24 inches of the enclosing material exposed above grade.
~~-
Signature '-- '- a
E5/, \} Ci l,
Date'
.
.
Job. No.
C\\Qt)~\~
SYSTEM DEVELOPMENT CHARGE
WORKSHEET
NAME: ~~~roy~ ~(lf\re. \\ ~ffi~ PHONE:
ADDRESS: 419)() ~\H\ 4ff5_ STATE: n't2--ZIP: t:\14tB
LOCATION OF PROPOSED BUILDIN~ SIT~: f\-....::
Street Address: \ ot q S{)ll \)\ 0\ \ ') u \ \ 'R-
Plat Name: Tax Lot Number: ~ - ~
1. DEVELPPMENT TYPE (Check appropriate dwelling(s). SDC calculations and dwelling t
ype definitions are on the back.)
A. Sinnlp.-F::Jmilv llP.t~
Single Family home
NO. OF UNITS \
B. SinQle-F;,<milv Attached
NO. OF UNITS
C. Multi-Familv Aoartment
NO. OF UNITS
D. ty1::Jnuf::Jcturp.rl Hnmp; p~
NO. OF UNITS
WILLAMALANE SDC
) ,Manufactured home not in a p~
X $1,000 per unit = $ \tcO ,
X $924 per unit = $
X $692 per unit = $
--
X $699 per unit =
$
\cco pO
ff
$
2. SDC CREDIT (if applicable) SDC-payer must furnish proof of
Willamalane Credit approval. See sac Credit Worksheet. $
$
\ (Yj) ~D
leek:,
3. TOTAL WILLAMALANE NET SDC ASSESSED
(if SDC reduced for C .
~m~~, ;
City of Springfield
5 I/O
Date
.'
SPRINGFIELD
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(RESIDENTIAL)
Name or Company: TERRY/DEANNE URMSON
Location: 629 FAIRVIEW DR
Developement Type: R Building Size:
Job No.: 960313
Lot Size:
1. STORM DRAINAGE
Impervious Sq Ft 2130 X 0.210 Per Sq Ft
2. SANITARY SEWER - CITY
Number Of PFUs 20 X 43.43 Per PFU
(see Page 2)
3. TRANSPORTATION
Number Of Units
1 X
X Trip Rate
1. 010 X
X
Cost Per Trip
437.93 =
$442.31
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
20
Per PFU +
18.750 +
MWMC Admin Fee
10.00
X
X
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0.50
TOTAL SDC
Reviewed By: TROY MCALLISTER
Date: 05/07/96
Page 1
Sq Ft
$447.30
$868.60
$442.31
$385.00
$58.16
$326.84
$2,085.05
$104.25
$2,189.30
.
"
SPRINGFIELD
Job Number: 960313
FIXTURE UNIT CALCULATION TABLE
Page 2
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower. Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory. Single
Water Closet. Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS
Number of
New Fixture
Unit
Equivalent
Fixture
Units
2
o
o
o
o
1
o
o
o
1
o
1
o
2
o
2
o
2
1
2
3
6
2
6
1
3
2
4
o
o
o
o
2
o
o
o
2
o
2
o
2
o
8
o
2
2
1
6
4
20
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated" separately.
(calculations are by $1000)
~
Year Annexed: 1960
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
16.760
X
3.47 =
58.16
o
X
3.47
0.00
CREDIT TOTAL =
$58.16
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)