Loading...
HomeMy WebLinkAboutPermit Building 1996-5-10 Page 1 RESIDENTIAL PERMIT APPLICATION CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY Job Number: 960313 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 629 FAIRVIEW DR Assessors Map #: 17032742 Lot: Block: Tax Lot #: 02300 Subdivision: Owner: TERRY/DEANNE URMSON Address: 4750 FRANKLIN #F15 Phone #: 746-6460 City/State/Zip: EUGENE, OREGON 97403 Describe Work: MANOFACTURED HOME NEW Contractor Const. Contractor # Expires Phone General: HARDACKER & OLE 0079496 83278 N 6th St Creswell OR 97426000 Plumbing: VOS PLUMBING 0041805 PO Box 2189 Eugene OR 974020000 Electrical: ARC ELECTRIC 0000603 85783 Hwy 99 South Eugene OR 974050 02/19/97 952-8229 04/04/96 485-0551 12/16/96 741-0494 QUAD AREA: 1RNW # OF UNITS: 1 CONSTR. TYPE: VN WATER HEATER: E OFFICE USE -- LAND USE: 1111 ZONING CODE: LOR # OF BDRMS: 3 RANGE: E # OF BLDGS: 1 OCCY GROUP: R3 HEAT SOURCE: FE SQ FOOTAGE: 1620 To request an inspection, call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS PEDESTAL - Prior to cover. FOOTrNG - After trenches are excavated. WATER LINE - Prior to filling trench. SANITARY SEWER LINE - Prior to filling trench. STORM SEWER LINE - Prior to filling trench. MANOF HOME/MOBILE HOME SET UP - When all blocking is complete. MANOF. HOME/MOBILE HOME ELECTRICAL - When blocking, setup, and plumbing inspections have been approved and home is connected to panel MANOF. HOME/MOBILE HOME PLUMBING - After home has been connected to water and sewer. FINAL SET UP - After all required inspections are approved and porches skirting, decks, venting, house numbers, etc. have been installed. Lot Faces: N Setbk From NPL: 37 Lot Sq. Ft.: 4928 Solar Approved: Y Total Height: 15 Lot Type: INTERIOR House N 30 Setbacks S W 10 8 E 14 Item Main Garage FTG/PERIM FOUNDATION BUILDING PERMIT Square Feet x $/Square Feet Value 45.000.00 0,00 3,500.00 Job Number: 960313 Page 2 Total Value 48,500.00 Building Permit Fee Surcharge/Admin 44.50 3.57 TOTAL FIlIl (A) 48.07 --- SYSTIlMS DEVELOPMENT CHARGIl (SDC) --- (B) 2,189.30 Systems Development Charge is due on all undeveloped properties within the City limits and the Citys Urban Growth Boundry which are being improved. --- PLUMBING PIlRMIT --- Item Sanitary Sewer Water Storm Sewer Fee 25,00 25,00 25.00 Plumbing Permit Surcharge/Admin 75.00 6.00 TOTAL CHARGIl (C) 81. 00 --- MISCIlLLANIlOUS PIlRMITS --- Mobile Home State Issuance Surcharge/Admin WILLAMALANE SDC ELECTRICAL PERMIT 105,00 20.00 8.40 1,000.00 86.40 TOTAL MISCIlLLANEOUS PIlRMITS (Il) 1,219.80 (Excluding 1l1ectrica1) unless otherwise noted TOTAL AMOUNT DUE (A, B, C, D, and Il combined) 3,538.17 --- BUILDING VALUE, PLAN CHECK AND BUILDING PIlRMIT --- This permit is granted on the express condition that the said construction shall. in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Received By: Plans Reviewed By: LISA HOPPER Date: 05/07/96 Building Site Reviewed By: LISA HOPPER - - - ADDITIONAL COMMENTS PARTITIONAL APPROVAL RECEIVED 5/7/96 32 SQ FT STORAGE STRUCTURE RQD PRIOR TO OCCY SPRINGFIELD Job Number: 960313 Page 3 DRIVEWAY REQUIRED TO BE PAVED 1 STREET TREES REQUIRED By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, ~hat the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. \/ ~ l.m ~/(' fiite I - -- VALIDATION Receipt Number: Z150? 5-IO-Q0 17 Date Paid: Amount Received: ~ 3 53 5S" Received By: 1/12--- . SPR.FIELD DEVELOPMENT SERVICES DEPARTMENT 225 FIFTH STREET SPRINGFIELD, OR 97477 (541) 726.3753 FAX (541) 726-3689 MANUFACTURED HOME SET-UP AGREEMENT As required by the City of Springfield Development Code, 1 understand and agree that with the approval of the attached p~rmits.z" one of the following manufactured homes will be placed-at ll!L C\ ~ \ 1\ \1\ 011 ) . Springfield, Oregon, City Job Number ~ \ -:l.. . . Type I Manufactured Home: A multi sectional (double wide or wider) unit with an enclosed floor area of not less than 1,000 square feet, that has a nominal roof pitch of3 feet in height for each 12 feet in width, that has no bare metal siding or roofmg, and that has been certified by the manufacturer to have an exterior thermal envelope meeting performance standards which reduce heat loss to levels equivalent to ~.I rformance standards required for single family dwellings at the time of construction, ~ initials Type II Manufactured Home: A unit of not less than 12 feet in width enclosing a minimum floor area of 500 square feet, that has a nominal roof pitch of2 feet in height for each 12 feet in width, that has no bare metal siding or roofmg, and that has been certified by the manufacturer to have an exterior thermal envelope meeting performance standards which reduce heat loss to levels equivalent to the performance standards required for single family dwellings at the time of construction. \ initials ' I further state, by my signature below, that I have been provided with the following information: Manufactured Home Blocking, Water Line Connection, Street Tree Standards, Sanitary Sewer Comiection, Electrical Connection, and Minimum requirements for permanent steps. 1 also understand that the manufactured home shall be placed on an excavated and backfilled foundaticm not to exceed 6 percent slope within 10 feet of the perimeter enclosure, enclosed at the perimeter with stone, brick or other concrete or masonry materials approved by the Building Official and with no more than 24 inches of the enclosing material exposed above grade. ~~- Signature '-- '- a E5/, \} Ci l, Date' . . Job. No. C\\Qt)~\~ SYSTEM DEVELOPMENT CHARGE WORKSHEET NAME: ~~~roy~ ~(lf\re. \\ ~ffi~ PHONE: ADDRESS: 419)() ~\H\ 4ff5_ STATE: n't2--ZIP: t:\14tB LOCATION OF PROPOSED BUILDIN~ SIT~: f\-....:: Street Address: \ ot q S{)ll \)\ 0\ \ ') u \ \ 'R- Plat Name: Tax Lot Number: ~ - ~ 1. DEVELPPMENT TYPE (Check appropriate dwelling(s). SDC calculations and dwelling t ype definitions are on the back.) A. Sinnlp.-F::Jmilv llP.t~ Single Family home NO. OF UNITS \ B. SinQle-F;,<milv Attached NO. OF UNITS C. Multi-Familv Aoartment NO. OF UNITS D. ty1::Jnuf::Jcturp.rl Hnmp; p~ NO. OF UNITS WILLAMALANE SDC ) ,Manufactured home not in a p~ X $1,000 per unit = $ \tcO , X $924 per unit = $ X $692 per unit = $ -- X $699 per unit = $ \cco pO ff $ 2. SDC CREDIT (if applicable) SDC-payer must furnish proof of Willamalane Credit approval. See sac Credit Worksheet. $ $ \ (Yj) ~D leek:, 3. TOTAL WILLAMALANE NET SDC ASSESSED (if SDC reduced for C . ~m~~, ; City of Springfield 5 I/O Date .' SPRINGFIELD CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (RESIDENTIAL) Name or Company: TERRY/DEANNE URMSON Location: 629 FAIRVIEW DR Developement Type: R Building Size: Job No.: 960313 Lot Size: 1. STORM DRAINAGE Impervious Sq Ft 2130 X 0.210 Per Sq Ft 2. SANITARY SEWER - CITY Number Of PFUs 20 X 43.43 Per PFU (see Page 2) 3. TRANSPORTATION Number Of Units 1 X X Trip Rate 1. 010 X X Cost Per Trip 437.93 = $442.31 Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs 20 Per PFU + 18.750 + MWMC Admin Fee 10.00 X X MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0.50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 05/07/96 Page 1 Sq Ft $447.30 $868.60 $442.31 $385.00 $58.16 $326.84 $2,085.05 $104.25 $2,189.30 . " SPRINGFIELD Job Number: 960313 FIXTURE UNIT CALCULATION TABLE Page 2 Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower. Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory. Single Water Closet. Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS Number of New Fixture Unit Equivalent Fixture Units 2 o o o o 1 o o o 1 o 1 o 2 o 2 o 2 1 2 3 6 2 6 1 3 2 4 o o o o 2 o o o 2 o 2 o 2 o 8 o 2 2 1 6 4 20 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated" separately. (calculations are by $1000) ~ Year Annexed: 1960 Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : 16.760 X 3.47 = 58.16 o X 3.47 0.00 CREDIT TOTAL = $58.16 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)