HomeMy WebLinkAboutPermit Electrical 2000-4-19
.
. Jec as su mltted has the followin
zoning, and does not require specific land use
approval.
Zoning LD ~
L{~/4 -c-v
~.......J
Date
225 FIFTH STREET
SPRINGFIELD, OREGON
INSPECTION REQUEST:
OFFICE: 726-3759
Authorized Signature
97477
726-3769
1. LOCATION OF INSTALLATION ~
..:3&l? ~ ./'i",rr/l!7€vV 0/",,/.(
..5tPN-;"'f./;:"fpf CJC
LEG'AL DESCRIPTION
/ -70 <~-;)-J <,II {'Jo /(J )
4~CRI~NGfA~tJ.
Permits are non-transferable and expire
if work is not started within 180 days
of issuance or if work is suspended for
180 days.
2. CONTRACTOR INSTALLATION ONLY
ctrical Contractor ~
/'
E
City
~
~
Supervisor
~
.............
Signature of Supervising Electrician
Owners Name r2 6 LIYnS}/, o/Crf/~ D.
v .
/7/11' /'L//'"v7c, ;f,J
r::;-V(~ Phone 68"l-58sD
7
/ .-r~~ INSTALLATIiza
~~~io~(lbeingC~~~
property I own which is not intended
for sale, lease or rent.
Address
City
Owners Si~~: ~
-------;-7---- _________L_____________
DATE: 0 -) ~07)
RECEIPT 11: /;). ,. .y '
RECEIVED BY:l1-IYltl (JL4-d ()
88
00
AMT RECD:2 $ 44.00
, CHANGE:
CASHIER:,OOl
ELE\..'TRICAL PERMIT APPLICATION
Ci ty Job Number uO () 0 Lj'/:? 0 / .
3. COMPLETE FEE SCHEDULE BELOIl
A. New Residential-Single or
Multi-Family per dwelling unit.
Service Included:
It ems Cos t
Sum
1000 sq.ft. or less $ 85.00
Each additional 500
sq. ft or portion
thereof $ 15.00
Each Manuf'd Home. or
Modular Dwelling
Service or Feede!). . $ 40.00
,B. Services or Feeders
Installation, Alterations
or Relocation:
200 amps or less
201 amps to 400 amps
401 amps to 600 amps
601 amps to' 1000 amps
Over 1000 amps/volts
Reconnect Only
$ 50.00
$ 60.00
$100.00
$130.00
$300.00
$ 40.00
Temporary Services or Feeders
Installation, Alteration or Relocation
!&(5V
C.
200 amps' 'OT less / $ 40.00
201 amps to ,400 amps $ 55.00
Over 401 to 600 amps $ 80.00
Over 600 amps or 1000 volts see "B" above
Branch Circuits
New, Alteration or Extension Per Panel
Miscellaneous (Service/feeder
-Each installation
Pump or irrigation
Sign/Outline Lighting
Limited Energy/Res
Limited Energy/Comm
One Circuit
Each Additional
Circuit or with Service
or Feeder Permit
E.
5.
SUBTOTAL OF ABOVE
7% State Surcharge
3% Administrative Fee
TOTAL
$ 35.00
$ 2.00
not included)
$ 40.00
$ 40.00
$ 20.QQ
$ 36.00
tI-O . oz;
4y' "'r)
( -.-r=
4.LJ. ~