Loading...
HomeMy WebLinkAboutPermit Building 2000-5-26 VI.. SPRINQFIELD ~- 225 North Fifth Street Springfield, OR 97477 . . I Job# 00-00242-01 I Page 1 of 3 TRANS#:01-0001918 DATE:HAY 26 2000 AMT RECD:2 $ 2721.39 CHANGE: CASHIER: 004 CITY OF SPRINGFIELD, OREGON COMMERCIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 00-00242-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 300 W Fairview Dr Spr Assessors Map#: 17032741 Lot: Block: Addition: Tax Lot #: 00101 Subdivision: Owner: Address: Housing Authority of Lane County 300 West Fairview Dr Phone Number: 541-682-4090 City/State/Zip: Springfield, OR 97477 New Value: $420,750 Scope Of Work: Warehouse Fairview Shops for Housing Authority Contractor Type Architect General Contr Quad Area: 1CNW # Of Units: Constr. Type: Water Heater: Contractor Registration # Expiration Date Jody Heady 300 West Fairview Drive, Springfield, OR 97477 2G Construction Phone 541-682-2591 651-658-3850 X, X, X Office Use Land Use: Zoning Code: Bedrooms: Range: # Of Buildings: Occupancy Group: Heat Source: Sq. Footage: To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Footing Foundation Slab Framing Drywall Firewall Ceiling Grid SUB - InsulationNapor Barrier SUB - Final Final Fire Final Building Required Inspections I Buildinll -After trenches are excavated. -After forms are erected but prior to concrete placement. - To be made after all ins lab building service equipment, conduit piping, and other equipment iter - Prior to cover. -Prior to taping. - Located and constructed according to plans. - To be called for at the same time as the SUB framing inspection. ~ -< fg~sg C") -< ;z ,="" tr.l .. .. '** -When all Fire Department requirements have been met. C") N::Z: .. - When all required inspections have been approved and the building is comp~. fI> ~ 7 t-lC")UI'VO "'::CNO'-O :::::t.'I:::t>........ 0 .. ZUN........ om. ChO o ("'rH.....! 0 ...... .p...oa....o Construction Types: Occupancy Groups: # Of Buildings: # Of Bedrooms: Handicap Access? 0 IArea (Sq. Feet) I Main: Accessory: , Rough Electrical Electrical Service Final Electrical Underfloor Plumbing Rough Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Final Plumbing Rough Mechanical Final Mechanical Fee Commercial Plan Check Total Plan Check . Il . I Job# 00-00242-01 I Required Inspections Electrical Page 2 of 3 - Prior to cover. - Must be approved to obtain permanent power. -When all electrical work is complete. I Plumbin!! -Prior to insulation or decking. - Prior to cover. - Prior to filling trench. - Prior to filling trench. - Prior to filling trench. -When all plumbing work is complete. Mechanical - Prior to cover. -When all mechanical work is complete. # Of Stories: Current Units: Census Code: Does not apply Height (feet): Proposed Units: Total: Paid On Receipt# Plan Check 05/26/2000 0001918 Value/Quantity Fee Amount 420,750 $750.91 $750.91 Buildin!! OS/26/2000 0001918 OS/26/2000 0001918 05/26/2000 0001918 Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building $1,155.25 $80.87 $34.66 $1,270.78 420,750 Electrical OS/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 Permanent: 200 Amps or Less Permanent: 401 to 600 Amps State Surcharge For Electrical Permit Electric Administrative Fee Total Electrical $150.00 $100.00 $17.50 $7.50 $275.00 3 1 Plumbin!! 05/26/2000 0001918 05/26/2000 0001918 OS/26/2000 0001918 05/26/2000 0001918 OS/26/2000 0001918 05/26/2000 0001918 OS/26/2000 0001918 Minimum Plumbing Permit Fee Number of Fixtures State Surcharge For Plumbing Permit Water Service Footage Sanitary Sewer Footage Storm Sewer Footage Plumbing Administrative Fee Total Plumbing $.00 $170.00 $22.40 $25.00 $40.00 $85.00 $9.60 $352.00 17 44 150 366 , . Page 3 of 3 . Job# 00-00242-01 Fee Paid On Receipt# Mechanical OS/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 Value/Quantity Minimum Mechanical Permit Mechanical Administrative Fee Less than 100,000 BTU Vent Fan to One Duct Unit/Heater Equipment Not Itemized on Permit Mechanical Issuance State Surcharge For Mechanical Permit Total Mechanical 1 10 2 2 Sanitary Sewer MWMC Administrative Fee SDC Administrative Fee Mini-Warehouse - MWMC General Office Building - Transp General Office Building Warehousing - Transportation Total System Development Grand Total Plan Check Type Initial Review-CII/P Engineering-C/I/P Structural-CII/P Fire Marshal-CII/P Fire Marshal-C/I/P System Development OS/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 05/26/2000 0001918 OS/26/2000 0001918 OS/26/2000 0001918 05/26/2000 0001918 Checked By Bob Barnhart Ken Vogeney Lorne Pleger AI Gerard AI Gerard Date Completed 02/16/2000 OS/25/2000 04/27/2000 03/28/2000 04/20/2000 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. .~ Fee Amount $.00 $1.71 $6.00 $30.00 $12.00 $9.00 $10.00 $3.99 $72.70 5 1 $241.35 $10.00 $153.01 $60.79 $1,998.73 $417.04 $332.38 $3,213.30 $5,934.69 1 3 3 1 I further agree to ensure that all required inspections are requested at the proper time, that each address is readab fro the street, that the permit card is Icoated at the front of the property, and the approved set 0 _l.nSI/III re~_on ~esite7t II times during construction. . ~~ ,~~6-O() Signature tI Date ., . . . . , \ ATTACHMENT A CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WOIg<.SHEET JOURNAL OR JOB NUMBER 00-00242-01 NAME OR COMPANY: HACSA LOCATION: 300 W. Fairview TAX LOT NUMBER 17-03-27-41-00101 DEVELOPMENT TYPE: New Maintenance Shops and Offices BUILDING SIZE: 4095 new Lna , ,""Ul ClJ.l;;;a LOT SIZE: I. ,; I UKM DRAlNAGIf No new area -- all new construction is on prior bldg footpring or paved-areas IMPERVIOUS SQ:FT. 0.00 x $0.232 PER SQ. FT. $0.00 I 2. SANITARY SEWER-CITY NUMBER OF PFU's (SEE REVERSE SIDE) 5 x $48.27 PER PFU $241.35 I 3. TRANSPORTATION Charges based only upon new 2nd floor area: 1,339 sf of warehouse . '1.; I ~ b slot otl1ce space NUMBER OF TRIPS x TRIP RATE x COST PER PM PEAK HOUR TRIP 1.339 2.756 x x 0.51 1.49 x $ 486.73 PER TRIP x $ 486.73 PER TRIP TOTAL TRANSPORTATION SDC $332.381 $1,998.73 $2,331.11 I 4. SANITARY SEWER - MWMC Charges based only upon new 2nd floor area: 1,339 sf of warehouse '1.;I~b st 01 otl1ce space A. REIMBURSEMENT COST: U.lY NUMBER OF FEU's 2.756 x x' $4I.b'1. $138.72 PhK t'hU PER FEU :)JJ./:) I $382.31 B. IMPROVEMENT COST: NUMBER OF FEU's U.lY 2.756 x x $.l:I~ $12.60 !'hK thU PER FEU .),J.VO I $34.73 $0.00 I $10.00 I $487.83 I $3,060.29l MWMC CREDIT IF APPLICABLE (SEE REVERSE) MWMC ADMINISTRATIVE FEE TOTAL MWMC SDC SUBTOTAL (ADD ITEMS I, 2, 3, & 4 n 5. ADMINISTRATlv,," """,,S: BASE CHARGE (SUBTOTAL ABOVE) ,x 0.05 $153.Dl I Jcc~ATUK 05/25/2000 VATh TOTAL SDC CHARGES I $3,213.30 I . . PLUMBING FIXTURE UNIT (PFU) CALCULATION TABLE NUMBER OF NEW FIXTURES x UNIT EQUlV ALENT ~ PLUMBING FIXTURE UNITS .iliQIltFOR REMQnH.~ f:ALCIHATlO ONLY THE ~ AOOm.QNAL FIXTURES) -" FIXTURE TYPE BATHTUB DRINKING FOUNTAIN FLOOR DRAIN INTERCEPTORS FOR GREASE/OIUSOLIDS/ETC. . INTERCEPTORS FOR SAND/AUTO W ASHlETC. LAUNDRY TUBICLOTHESW ASHER/MOP SINK CLOTHESW ASHER - 3 OR MORE MOBILE HOME PARK TRAP (I PER TRAILER) RECEPTOR FOR REFRIGERA TOR/W A TER S1 A TION/ETC. RECEPTOR FOR COMMERCIAL SINK/ DISHW ASHER/ETC. SHOWER, SINGLE STALL SHOWER, GANG (NUMBER OF HEADS) SINK: BAR, COMMERCIAL, RESIDENTIAL KlTCHE~ URINAL, STALL/WALL WASH BASIN/LA VA TORY, SINGLE OR DOUBLE TOILET, PUBLIC INSTALLATION TOILET, PRIVATE INSTALLATION MISCELLANEOUS: , . " FIXTURES UNIT NEW OLD EQUIVALENT 2 I 2 3 6 2 6 6 1 3 2 1 2 2 I 6 4 PLUMBING FIXTURE UNITS o . o o o o o o o o o o o o o 1 o 4 o o o TOTAL PLUMBING FIXTURE UNITS=! ' 5 CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEP ARA TEL' YEAR ANNEXED ---Y-979 or before 1980 1981 1982 1983, 1984 1985 1986 1987 1988 RATE PER $1,000 ASSESSED VALUE $ 4.47 $ 4.38 $ 4.32 $ 4.20 $ 4.03 $ 3.88 $ 3.68 $ 3.38 $ 3.03 $ 2.62 CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE IMPROVEMENT (IF AFTER ANNEXATION DATE) YEAR ANNEXED 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 RATE PER $1,000 ASSESSED VALUE $ 2.18 $ 1.75 $ 1.35 $ 1.17 $ 1.03 $ 0.86 $ 0.71 $ 0.57 $ 0.39 $ 0.18 x x = $0.00 $0.00 CREDIT TOTAL $0.00