HomeMy WebLinkAboutPermit Building 1991-12-9
COM M ERCIALlI N DUST RIA.
PERMIT APPLICATION
~
.
JOB NUMBER
91!32.L
225 Fifth Street, Springfield, Oregon 97477
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK' Dorris Ranch Barn: 205 Dorris St., Springfield
ASSESSORS MAP'
18 03 02 00
TAX LOT
802
OWNER' Willamalane
151 North
Park and Recreation District
PHONF' 726-4335 ,11" Af..1l>;st7'A
ADDRESS'
CITY' Springfield
4th Street
STATF'
Oregon
ZIP'
97477
NEW
REMODEL X
ADDITION
replacement of stairs; structural reinforcement of 2nd
floor.
DEMOLISH OTHER VALUE: SlOOO.
DESCRIPTION OF WORK' In wooden barn:
NAME
ADDRESS
PHONE
ARCHITECT' None
CONTRACTOR'S NAME
ADDRESS
CONST.
CO NT RACTO R .
EXPIRES
PHONE
GENERA" None - all work to be done with Willamalane staff.
PLUMBING' None
MECHANICAl' None
ELECTRICA" None
PLUMBING
MECHANICAL
I
('1:IA.B.G.i
I
l
I
I
I
I
I
I
I
$10.00 I
I
NO.
FEE
CHARGE-
~" 1:'1=1=
ft.
Furnace/burner & vent
< 100.000 BTUs
Furnace/burner & vent
>100.000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
------...
Slngle Fixture
Relocated Bldg.
Inew fix. addtl)
Water Service
Sanitary Sewer
ft.
Storm Sewer
ft.
Backflow Device
Permit Issuance
TOTAL PERMIT
TOTAL PERMIT
- OFFICE USE -
HANDICAP ACCESS:
FLOOD PLAIN:
OUAD AREA'
LAND US.'
. OF BLDG""
. OF UNITe.
ZONING'
OCCY GROUP'
. OF STORIES:
CONSTR. TYp.,
HEAT SOURC.'
LIGHTING POWER BUDGET:
WATER HEATER'
So. FT.
$/SO. FT.
VALUE
SO. FTG MAIN
X
SO. FTG ACCESS X
SO. FTG OTHER ~~_O?P- ?1Y,c>~ -:9' ~~~-4'
/c--"'"....-r..-
,
TOTAL VALUE OF PROJECT
PLAN CHECK FEi: / /. :::?.8
RCPTN
DATF
BY
I BUILDING PERMIT
15% Stat.e
Surcharge
I MECHANICAL
15% State
Surcharoe
I PAVING
/Z~
. ~s.
PLUMBING
FT.
I DEMOLITION
I
~ <--
I SUBTOTAL
PERMITS
I SYSTEMS
DEVELOPMENT
//. 3$
/.&.3g
5% State
SurcharQe
FENCE
VALUE $
SIDEWALK
CURBCUT
FT.
.' #
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
?~.76
I'
. REQUIRED INSPECTIONS .
It Is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavatIon, but
prior to setup of forms.
UNDERSlAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After gravel is In
place but prior to placing
asphalt or concrete.
ATTIC DRAFT STOPS &
CURTAIN WAllS
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner! Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are .
erected, all steel in place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
. framing Inspection.
y
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a.1)
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
In place but before any
concrete is placed.
STRUCTURAL WELDS:
Performed on the job. (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering is
applied.
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
FIRE & SEPARATION WAll:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FilLING:
During earthwork. (306 a.11 &
Chapter 29)
POST & BEAM: To be made
prior to Installation of floor
insulation, decking or floor
sheathing.
lATH ANDIOR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 UB.G.
STDS. 25.10,11).
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
STRUCTURAL MASONRY: (306
a.7)
MASONRY: Steel location,
bond beams grouting or
verticals In accordance wlth
UBC 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
.In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
ROOF SHEATHING AND
NAiliNG: Prior to installing
any roof coverl ng.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL BUilDING: Requested after the linal plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS:
PLANS REVIEWED BY ~4 -----"'>
, '/ {- P'
DAT~ /2-"'3-- "3-./
By signature,l state and agree, that I have carefuffy examined the completed application and do hereby certify that all Information
herein 15 true and correct, and I further certify that any and all work performed shalf be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any struct re without permission of the Building Safety Division. I further certify that only contractors and employees
who are in comptianc ith OAS 701.055 will be used on this project.
quired inspections are requested at the proper time, that project address Is readable from the
ted at the front of the property, and the approved set of plans will remain on the site at all
I further agree to ens re that all r
street, that the permit ard is 10
times during construe on.
Date /2--/2----9/
Signaturp
VALIDATION:
AMOUNT RECEIVED:
RECEIPT ..
.. A'1.?"c,
"i-::j'~
DATE PAID:
RECEIVED BY'
/'2,,/<-9/
/? ,,--"~
~.
~ .
A