HomeMy WebLinkAboutPermit Building 1984-3-26
-
tcr..~d 'j(/ ~ XWc.,\c
. ' ,:p ~/ .
FOR OFFICE USE ONLY
Applica tioni=;a0 Q.l
Perm1. t # '" - ("')4"'
o Two Copies of Plans
DThree Copies of Plot Plans
UMech/Plumbing Checklist
o Legal Interest Document
o Plan Check Info Sheet
Lane
V /
'''''';SHIPI, ,I RANGb3, SECTf~ fT1GOOOUT OF
SJBD~7l)f~I~~1iJI;hl 0, _ . I '^?!JCEL I B(2)
LOCIAqTIOq~IAD ~~JS.~~E~..-foq/t.:1t"{)""M 10/1,} ~'P7tr7-~ZIP P~D USE OF PROPERTY
A"a'"-IJ l( J-{j-rJ JlJLJ.f\ I~ "::'J~ l!jReside.ntial o Industrial
S CTURES ,TLY O~ERTY e J oThn'~ ~' l '- . D Commercial D Public_
TITtrL,;"/) ~C.OJ ~nYYL ~ (LA-~ (JYil()
~~!1J~)rORK_~R~~~ + / /~~~d'1 D~CatJif9c2E
"i?)UJ)n..) fJ1(UJYl , .. -
" ~DROOMS # OF ~'VRIE~ I # OF EMPLOYEES I W~TER SU~~ j (;7, J I~I .:) ~o~ed
r l('JYLQJ (JV'\{) J. nDnQ..., ,J} yt?)IL,vr-x- ~ J'YJEXishng
!:'7\U1wxiNtJ7~1 M il~I34tI~~JtLLf(V'LP;l) ILh,'7i . I T -PH~E NU E
~- 's N'AJD t'#'o~OLX.. & 2Tu J.{ ~- I TE EP ON E
J!\. __ __. _..u ~ _ ~._
p ~:1 ~VE C::F:'~DX:N~::E :P: D ICA~~~~I( ~n:~O~horebY :6 L all ~~ation hereon " t~ue T:n:e:::~:t~~::Rthat I
have the following legal interest in the property: Downer of record; 0 contract purchaser: Oauthorized agent with evidence of authority attached.
I f::.rther certify that any and all work performed shall be done in accordance with the Ordinances of Lane County and the Laws of the State of Oregon
pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without the permission of the Building Division. I fur-
ther certify that registration with the Builder's Board is in full force and effect as required by ORS 701.055, that if exempt the basis for exemption, /
is noted hereon, and that only subcontractors and employees who are in compliance with ORS 701.055 will be used on this project. I HAVE READ AND
CHECKED THIS APPLICATION THOROUGHLY.
,..
I)v:> n r1.'~
J.L
;1?~~
NAME (please p~
p~~
--=::.,
.y~j/
READ THIS SECTION CAREFULLY. YOUR AUTHORIZATION HAS
o PLANNING/ZONING: zone~ partition #
C C Od
t-tinimum Setbacks: L, front "w. .'b, SJ. e
CO>l'lENTs,r1tfftCb.Qrl~o,pH I~
BEEN BASED ON THE FO~ONDITIONS~
Parcel #
interior~5 /
Parcel Size
rear ?f)1
Date:
UP
n
~LOODPLAIN :
In flood hazard area? 0 No 0 Yes, SEE ATTACHED SHEET.
Date:
o SANITATION: S. 1. #: B. P. # Installation Record Issued? Dyes 0 No
Installation Gallon Lineal Feet Maximum Depth
Specifications: Tank of Drainfield of Trenches
-~'~'''lm' ~) DD-+I'Yl"~;6 0'Zf mtJd ,Dn9>nup~'lf',
'?1trl 0 1./ lJ1 rOl1rrllr,
Date, R: /J1c<--o..A frY ~
urP'LANS EXAMINATION, Type 6A1 Group-.M! Use 1!df!pg:2!l
COMMENTS, ~,/ltL h'?t _ R0c:>h //lEJdJ2/:71~) ,
- v -f/ .
Date:
~ /?X~4
'/"'/-,
I
n
TOTAL VALUATION $
CONSTRUCTION AUTHORIZED BY ~ PERMIT
Description
- /
Sq. Ft.
Fixed Fee/ Floodplain Fee $
Unit Cost Subsurface Fees $
Building E"ee $
~l.ch/Plmbg Fee $
P'ans Check Fee $
State Surcharge $
DEQ Surcharge $
TOTAL FEE $$
I
~
PERMIT APPROVED BY BUILDING OFFICIAL/DESIGNEE (per ORS 456.t1o.f:!!7 !//'~ "}~--!t
LANE COUNTY DEPARTMENT OF PUBLIC WORKS LAND MANAGEMENT DIVISION, 687-4061: C 14-25
125 EAST 8TH AVENUE, EUGENE, OREGON 97401
SEE REVERSE FOR INSPECTION INFORMATION
.
.
~
SETBACKS AND OTHER CONDITIONS OF APPROVAL MUST BE STRICTLY OBSERVED. VIOLATION CAN RESULT IN REVO-
CATION OF THIS PERMIT, CITATION UNDER PROVISIONS OF LANE COUNTY'S INFRACTION ORDINANCE, AND/OR OTHER
REMEDIES ALLOWED BY LAW.
WHEN READY FOR INSPECTION, CALL 687-4065. A MINIMUM OF AT LEAST 24 HOURS ADVANC~ NOTICE FOR INSPEC-
TION REQUESTS MUST BE GIVEN. Have the following information ready: permit number, job address, type
of inspection, when it will be ready, your name and phone number, and any special directions to site.
BUILDING DIVISION:
REQUIRED INSPECTIONS:
1. Foundation-Inspection: To be-made after trenches are excavated and forms erected and when all
materials tor the toundation are delivered on the job. Where concrete from a central mixing
plant (commonly termed "transit mixed") is to be used, materials "':led not be on the job.
2'. Concrete Slab or Under-Floor Inspection: To be made after all in-slab or under-floor building
service equipment, conduit, piping accessories, and other ancillary equipment items are in
place but before any concrete is poured or floor sheathing installed, including the subfloor.
, 3. Framinq & Insulation Inspections: To be made after the roof, all framing, fire blocking, and~
bracing are in place and all pipes, fireplaces, chimneys, and vents are complete and all rough
electrical and plumbing are approved. All wall insulation and vapor barrier are in place.
4. Lath and/~ Gy~sum Board Ins~ection: To be made after all lathing and gypsum board, interior
ana-exter~or, ~s ~n place but before any plastering is applied and before gypsum board joints
and fasteners are taped and finished.
5. Final Inspection: To be made after the building is complete and before occupancy.
.....
APPROVAL REQUIRED. No work shall be done on any part of the building or structure beyond the point
indicated in each successive inspection without first obtaining the approval of the building official.
Such approval shall be given only after an inspection shall have been made of each successive step
in the construction as indicated by each of the inspections required.
NOTE: All building permits require inspections for the work authorized, such as but not l~mited to:
A. Block Wall: .To be made after reinforcing is in place, but before any grout is poured. This
inspect~on is required for each bond beam pour. There will be no approval until the plumbing
and electrical inspections have been made and approved.
B. Wood Stove: To be made after completion of masonry (if applicable) and when installation is
compl~ Installation shall be in accordance with an approved, nationally recognized testing
agency and the manufacturerls installation instructions.
C. Mobile Home: An inspection is required after the mobile home is connected to an approved
sewer or septic system for setback requirements, blocking, fQoting connection, tiedowns,
skirting, and plumbing connections.
1. Footings and piers to comply with State foundation requirements for mobile homes or as
recommended by the manufacturer.
2. Mobile home minimum finish floor elevation shall be certified when required by a flood-
plain management letter.
3. Mobile home tiedowns, when required, and skirting shall be installed and ready for inspec-
tion within at least 30 days after occupancy. Tiedowns and skirting shall be installed
per enclosure.
D. Swimminq Pool: Below grade when steel is in place and before concrete is poured. Above grade
when pool-rs-installed.
APPROVED PLANS MUST BE ON THE JOB SITE AT ALL TIMES DURING WORKING HOURS. THIS PERMIT WILL EXPIRE
IF WORK DOES NOT BEGIN WITHIN 180 DAYS, OR IF WORK IS SUSPENDED OR ABANDONED FOR MORE THAN 180 DAYS.
SUSPENSION OR REVOCATION MAY OCCUR IF THIS PERMIT WAS ISSUED ON THE BASIS OF INCOMPLETE OR ERRONEOUS
INFORMATION.
ANYONE PROCEEDING PAST THE POINT or REQUIRED INSPECTIONS WILL DO SO AT THEIR OWN RISK.
SUBSURFACE AND ALTERNATIVE SEWAGE DISPOSAL SYSTEMS:'
1. Permits shall be effective for one year from the date.of issuance..
2. Upon completing the construction for which a permit has been issued, the permit holder shall
notify the Lane County Department of Planning and Community Development by submitting the
installat~on record form. The Department shall inspect the construction to determine if it
complies ~th the rules contained in this division. If the construction does comply with such
rules, the Depar.trnent shall issue a certificate of satisfactory completion to the permi tl' holder.
If the cons~ruction does not comply with such rules, the Department shall notify the permit
holder and shall require satisfactory completion before issuing the certificate. Failure to
meet the requirements for satisfactory completion within a reasonable time constitutes a vio-
lation of ORS 454.605 to 454.745 and this rule.
Setbacks - Subsurface Sewaqe Disposal
Septic Tank
From: Interior property lines
Edge of road right-of-way
Building foundation
Wells, other water sources
10 I
10 I,
5'
50'
Drainfield
la'
10 I
10~
100'
,
'I
.
'I I
."
.:\
.
\.
;.
,II ~
1..
;
1(:
1,:1
i.
,
;,H I
;.
i
"
e,
.
.
.
.
,
.
.
.
1ft'
, ,
.
.
'.
.
1'1'
.
.
.
.
.
.
I 59684 DATE 030284r.
.,
LN., EUGENE, OR ....
LOT BLI<
UNITS 001 STORIES 1. IBLDGS 001 PHONE 746 8444
AD DR 341.1 BALDY VIEW LN., EUGENE, OR .
SQ FT UNIT COST VALUATION FEE DAYS
648 4.59 2974
W - ':'
.tAF'PLICANT BOYLES,
ILl 1703140001600
NEW BLDG TYPE GAR
.
LANE
DURWARD
SUBDIV
USE R BDRMS 0
COUNTY DEPT ENV MGT RECEIPT
ADDR 3411 BALDY VIEW
CONNECTORS:
MECHANICAL FEE
STATE SURCHARGE
PLAN CHECK FEE
NME BOYLES, DURWARD
APPL NO ACTION DESCRIPTION
CARPOFa
NO.
SREF
APP
o
BY CAD
RA
FP
SDS
1
COMPLETION
. OWNEF~
CODE
.--Bf:'
gaBP
~.BP
~ BP
~eE~P
~ BP LC 59684 RACC
f PL NO. FIXTURES:
~.-MECH
~ .SUR.
.. PCI<
@
n.S'DS
ul
z\! \
3.
~
.. CATG:
.
:.S'EQU:
,! TAKEN
.
o
v
EST.
2974
15.00 EACH =
4%
.65%
SI
PCI<
OTH
ISS
3
TOTAL FEE**
"
"-
DATE
.
38.50
.
i ;"1
1.54
25.03
.
.
.
65.07
2.
CI<
"!!
'-"
.